Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315
Section 46
Cite as Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315, s. 46 · current to January 19, 2026 · regulation last amended December 31, 2009
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) An operator that completes a well shall ensure that
(a) it is completed in a safe manner and allows for maximum recovery;
(b) except in the case of commingled production, each completion interval is isolated from any other porous or permeable interval penetrated by the well;
(c) the testing and production of any completion interval are conducted safely and do not cause waste or pollution;
(d) if applicable, sand production is controlled and does not create a safety hazard or cause waste;
(e) each packer is set as close as practical to the top of the completion interval and that the pressure testing of the packer to a differential pressure is greater than the maximum differential pressure anticipated under the production or injection conditions;
(f) if practical, any mechanical well condition that may have an adverse effect on production of oil and gas from, or the injection of fluids into, the well is corrected;
(g) the injection or production profile of the well is improved, or the completion interval of the well is changed, if it is necessary to do so to prevent waste;
(h) if different pressure and inflow characteristics of two or more pools might adversely affect the recovery from any of those pools, the well is operated as a single pool well or as a segregated multi-pool well;
(i) after initial completion, all barriers are tested to the maximum pressure to which they are likely to be subjected; and
(j) following any workover, any affected barriers are pressure-tested.
(2) The operator of a segregated multi-pool well shall ensure that
(a) after the well is completed, segregation has been established within and outside the well casing and is confirmed; and
(b) if there is reason to doubt that segregation is being maintained, a segregation test is conducted within a reasonable time frame.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.