Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315
Section 41
Cite as Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315, s. 41 · current to January 19, 2026 · regulation last amended December 31, 2009
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
The operator shall ensure that cement slurry is designed and installed so that
(a) the movement of formation fluids in the casing annuli is prevented and, where required for safety, resource evaluation or prevention of waste, the isolation of the oil, gas and water zones is ensured;
(b) support for the casing is provided;
(c) corrosion of the casing over the cemented interval is retarded; and
(d) the integrity of gas hydrate and permafrost zones — and, in the case of an onshore well, potable water zones — is protected.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.