Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315

Section 28

Cite as Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315, s. 28 · current to January 19, 2026 · regulation last amended December 31, 2009

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

The operator shall ensure that (a) the drilling fluid system and associated monitoring equipment is designed, installed, operated and maintained to provide an effective barrier against formation pressure, to allow for proper well evaluation, to ensure safe drilling operations and to prevent pollution; and (b) the indicators and alarms associated with the monitoring equipment are strategically located on the drilling rig to alert onsite personnel.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗

Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.