Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315
Section 25
Cite as Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315, s. 25 · current to January 19, 2026 · regulation last amended December 31, 2009
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
The operator shall ensure that
(a) all wells, installations, equipment and facilities are designed, constructed, tested, maintained and operated to prevent incidents and waste under the maximum load conditions that may be reasonably anticipated during any operation;
(b) a comprehensive inspection that includes a non-destructive examination of critical joints and structural members of an installation and any critical drilling or production equipment is made at an interval to ensure continued safe operation of the installation or equipment and in any case, at least once in every five-year period; and
(c) records of maintenance, tests and inspections are kept.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.