Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315
Section 14
Cite as Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315, s. 14 · current to January 19, 2026 · regulation last amended December 31, 2009
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) The Board may suspend the well approval if
(a) the operator fails to comply with the approval and the work or activity cannot be conducted safely, without waste or without pollution;
(b) the safety of the work or activity becomes uncertain because
(i) the level of performance of the installation or service equipment, any ancillary equipment or any support craft is demonstrably less than the level of performance indicated in the application, or
(ii) the physical environmental conditions encountered in the area of the activity for which the well approval was granted are more severe than the equipment’s operating limits as specified by the manufacturer; or
(c) the operator fails to comply with the approvals issued under subsection 7(2), 52(4) or 66(2).
(2) The Board may revoke the well approval if the operator fails to remedy the situation causing the suspension within 120 days after the date of that suspension.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.