Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315
Section 10
Cite as Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315, s. 10 · current to January 19, 2026 · regulation last amended December 31, 2009
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) Subject to subsection (2), an operator who intends to drill, re-enter, work over, complete or recomplete a well or suspend or abandon a well or part of a well shall obtain a well approval.
(2) A well approval is not necessary to conduct a wire line, slick line or coiled tubing operation through a Christmas tree located above sea level if
(a) the work does not alter the completion interval or is not expected to adversely affect recovery; and
(b) the equipment, operating procedures and qualified persons exist to conduct the wire line, slick line or coiled tubing operations as set out in the authorization.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.