Load Line Regulations, SOR/2007-99
Section 9
Cite as Load Line Regulations, SOR/2007-99, s. 9 · current to July 24, 2025 · regulation last amended December 20, 2023
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
The dredging load line on an open-hopper dredge is the applicable load line when
(a) the dredge is operating not more than 20 nautical miles from the mouth of a harbour of safe refuge;
(b) the height of waves in the area of operation is not more than 3 m or the wind velocity in the area is not more than 65 km/h; and
(c) the dredge is carrying dredged material with a specific gravity that is not greater than the highest specific gravity of dredged material that the dredge is designed to dredge.
Read the Load Line Regulations on the Justice Laws Website ↗
Made under Canada Shipping Act, 2001, S.C. 2001, c. 26.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.