Load Line Regulations, SOR/2007-99

Section 7

Cite as Load Line Regulations, SOR/2007-99, s. 7 · current to July 24, 2025 · regulation last amended December 20, 2023

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) The seasonal zones, areas and periods set out in Annex II to the Convention apply for the purpose of determining the applicable load line when a new vessel is in one of those zones or areas. (2) When a new vessel is engaged on a voyage set out in column 1 of the table to this subsection during a period set out in column 2, the seasonal period set out in column 3 applies for the purpose of determining the applicable load line.TABLEItemColumn 1Column 2Column 3VoyagePeriodSeasonal Period1A voyage during the course of which the vessel crosses the eastern boundary of the St. Lawrence River Seasonal Area(a) Period beginning on November 1 and ending on March 31(a) Winter(b) Period beginning on April 1 and ending on October 31(b) Summer2A voyage entirely within the limits of the North American Great Lakes Zone and the St. Lawrence River Seasonal Area(a) Period beginning on November 1 and ending on March 31(a) Winter(b) Period beginning on April 1 and ending on April 30 and beginning on October 1 and ending on October 31(b) Summer(c) Period beginning on May 1 and ending on September 30(c) Tropical (3) The seasonal zones, areas and periods set out in Schedule III or IV, whichever is applicable, of the Rules apply for the purpose of determining the applicable load line when an existing vessel is in one of those zones or areas. (4) A port standing on the boundary line between two zones or two areas is considered to be in the zone or area from which a vessel departs or into which a vessel arrives, as the case may be.
Read the Load Line Regulations on the Justice Laws Website ↗

Made under Canada Shipping Act, 2001, S.C. 2001, c. 26.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.