Remote Sensing Space Systems Regulations, SOR/2007-66

Section 22

Proposed launch

Cite as Remote Sensing Space Systems Regulations, SOR/2007-66, s. 22 · current to July 24, 2025 · regulation last amended April 5, 2007

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) A licensee must, at least 45 days prior to the planned launch of a remote sensing satellite, provide a written report to the Minister that contains (a) the start date and time, expressed in Coordinated Universal Time, of the planned launch window and its duration expressed in days; (b) the name and location of the launch site expressed as a latitude and longitude; (c) the azimuth of the proposed launch trajectory expressed in degrees measured positive clockwise from True North in a local frame of reference centred on the launch site; (d) the type of the launch vehicle; and (e) the geographic boundaries of the area that could be subject to falling debris from a normal launch and from a launch failure. (2) The licensee shall, without delay, inform the Minister of any change in any of the information provided under subsection (1).
Read the Remote Sensing Space Systems Regulations on the Justice Laws Website ↗

Made under Remote Sensing Space Systems Act, S.C. 2005, c. 45.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.