Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Swift River Portion of the Pipeline in the Province of British Columbia, SI/81-21

Section 99

Cite as Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Swift River Portion of the Pipeline in the Province of British Columbia, SI/81-21, s. 99 · current to July 24, 2025 · regulation last amended March 22, 2006

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

Foothills shall, in respect of the construction of the pipeline, (a) clear vegetation from only those areas essential for the construction; (b) cut, stack and dispose of any merchantable timber cleared by Foothills in such manner as is satisfactory to the designated officer; (c) leave a buffer strip of undisturbed vegetation satisfactory to the designated officer (i) between any area cleared by Foothills of vegetation and an adjacent waterbody, and (ii) between any area cleared of vegetation and an adjacent road; (d) promptly remove any debris entering or likely to enter any waterbody as a result of the clearing of vegetation by Foothills; and (e) take measures satisfactory to the designated officer to minimize windthrow in buffer strips.
Read the Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Swift River Portion of the Pipeline in the Province of British Columbia on the Justice Laws Website ↗

Made under Northern Pipeline Act, R.S.C. 1985, c. N-26.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.