Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Swift River Portion of the Pipeline in the Province of British Columbia, SI/81-21
Section 128
Cite as Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Swift River Portion of the Pipeline in the Province of British Columbia, SI/81-21, s. 128 · current to July 24, 2025 · regulation last amended March 22, 2006
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) Foothills shall
(a) inspect every pipeline water crossing for evidence of deterioration in bank stability and stream bed condition, and
(b) when directed by the designated officer, monitor the consequences of any pipeline water crossingin such manner as is satisfactory to the designated officer.
(2) Foothills shall report to the designated officer, within a reasonable period of time, the results of the inspection referred to in paragraph (1)(a) and, when required by the designated officer, the results of the monitoring referred to in paragraph (1)(b).
Read the Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Swift River Portion of the Pipeline in the Province of British Columbia on the Justice Laws Website ↗
Made under Northern Pipeline Act, R.S.C. 1985, c. N-26.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.