Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517

Section 93

Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 93 · current to July 24, 2025 · regulation last amended March 22, 2006

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) The end of the hoisting line shall be securely fastened to the hoist drum shaft. (2) The hoisting line shall be long enough so that, when the travelling block is laid horizontally on the derrick floor, there will remain at least three turns of rope on the hoist drum. (3) Every hoisting line used in well-drilling, well-servicing and well-abandoning operations shall be examined weekly by the toolpusher, or other person authorized by the owner to determine the condition of the line, who shall enter the result of his examination in the Rig Record Book over his signature. (4) No hoisting line used for well-drilling, well-servicing or well-abandoning operations shall be used when the factor of safety falls below five. (5) When the examination mentioned in subsection (3) indicates that any one or a combination of two or more of the following conditions may have reduced the safety factor to less than five, the line shall be replaced: (a) worn wires; (b) broken wires; (c) visible corrosion; and (d) a damaged or otherwise defective line. (6) The ultimate strength of wire-rope hoisting lines should be based on the manufacturer’s catalogue.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗

Made under Territorial Lands Act, R.S.C. 1985, c. T-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.