Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517

Section 77

Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 77 · current to July 24, 2025 · regulation last amended March 22, 2006

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) On all occasions before wells are brought into production by swabbing, bailing or displacement with gas or oil, the siding shall be removed from three sides of the derrick below the derrick floor. (2) Before bailing or swabbing operations are undertaken, and before work-over jobs are commenced, the siding shall be removed from any two opposite sides of the derrick to a height of not less than six feet above the derrick floor. (3) The suction pit or tanks used for the circulation of oil shall not be located inside the pumphouse.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗

Made under Territorial Lands Act, R.S.C. 1985, c. T-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.