Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517
Section 61
Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 61 · current to July 24, 2025 · regulation last amended March 22, 2006
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) On every jacknife derrick constructed for drilling or equipped for redrilling, a platform at least two feet wide shall be provided on at least one side of the crown block, and shall be equipped on its outer edges with a standard two-rail railing 3 1/2 feet high and a toe-board six inches high.
(2) On every other derrick constructed for drilling or equipped for redrilling, a platform at least two feet wide shall be equipped on its outer edges with a standard two-rail railing 3 1/2 feet high and a toe-board six inches high.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Territorial Lands Act, R.S.C. 1985, c. T-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.