Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517

Section 58

Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 58 · current to July 24, 2025 · regulation last amended March 22, 2006

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) Where a licensee, permittee or lessee or his agent is drilling a well, he shall install, maintain and use at all times necessary control equipment as required by section 7. (2) Except in instances in which loss of circulation occurs through unforeseeable circumstances, sufficient drilling fluid of proper density shall be kept in the well at all times to minimize the possibility of the well blowing out of control.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗

Made under Territorial Lands Act, R.S.C. 1985, c. T-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.