Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517

Section 55

Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 55 · current to July 24, 2025 · regulation last amended March 22, 2006

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) The Oil Conservation Engineer may direct permittees and lessees at such time and in such manner as he may deem advisable to conduct all reasonable tests and furnish information in respect of oil or gas reservoirs. (2) Notwithstanding the generality of subsection (1), the tests and information to enable the taking of reservoir surveys may relate to (a) the practices and methods employed in operating a well; (b) the volume and source of oil and gas; (c) the pressure of the reservoir as an average; (d) the areas of the regional or differential pressure; (e) gas-oil ratios; (f) the producing characteristics of individual wells in any field; and (g) the producing characteristics of any field.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗

Made under Territorial Lands Act, R.S.C. 1985, c. T-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.