Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517

Section 38

Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 38 · current to July 24, 2025 · regulation last amended March 22, 2006

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) Before production is taken initially from any gas well it shall be tested by the back-pressure method. (2) Each producing gas well shall be tested at least every 12 months. (3) At the request of the lessee or lessees of a majority of the gas wells in any pool not subject to special pool regulation, the Oil Conservation Engineer may direct that such gas wells in the pool be tested by any standard method recognized as being practicable, except that all gas wells in any one pool shall be tested by the same method. (4) Tests shall be made in accordance with detailed instructions obtainable from the Oil Conservation Engineer and shall be forwarded promptly to the Oil Conservation Engineer on a form approved by the Chief. (5) Shut-in pressures shall be taken on all producing gas wells semi-annually unless the taking of such pressures is covered by special pool order. (6) Surface shut-in pressure shall be taken with a dead-weight gauge after a minimum shut-in period of 24 hours. (7) All shut-in pressures and the duration of the shut-in period thereof shall be reported to the Oil Conservation Engineer on the regular monthly gas well report. (8) Open-flow and back-pressure tests on gas wells may be witnessed or observed by the Oil Conservation Engineer and he shall be given reasonable notice by the permittee or lessee of the well on which the tests are to be taken, setting the time that such tests will commence.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗

Made under Territorial Lands Act, R.S.C. 1985, c. T-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.