Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517
Section 24
Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 24 · current to July 24, 2025 · regulation last amended March 22, 2006
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) The licensee, permittee or lessee shall make provision to the satisfaction of the Oil Conservation Engineer for the control and conservation of oil and gas at every well and structure test hole and he shall take all reasonable steps to maintain his equipment for such purpose in proper condition.
(2) Where at any time, in the opinion of the Oil Conservation Engineer, such equipment is inadequate, he may prescribe the remedial measures that shall be instituted and completed before any further drilling or production is undertaken.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Territorial Lands Act, R.S.C. 1985, c. T-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.