Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517
Section 104
Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 104 · current to July 24, 2025 · regulation last amended March 22, 2006
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) Where the measurement of gas is required under these Regulations, its volume shall be computed as the number of cubic feet it would occupy at standard conditions of 14.65 pounds per square inch absolute and 60°F.
(2) Where the conditions of pressure and temperature differ from the standard conditions set out in subsection (1), the volume shall be converted to the standard conditions in accordance with the Ideal Gas Laws and corrected for deviations from the Ideal Gas Laws where the amount of the deviation exceeds one per cent.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Territorial Lands Act, R.S.C. 1985, c. T-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.