Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517
Section 101
Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 101 · current to July 24, 2025 · regulation last amended March 22, 2006
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) Unless previously submitted to the Oil Conservation Engineer or the Chief in accordance with these Regulations or in accordance with the Canada Oil and Gas Land Regulations, every licensee, permittee or lessee shall forward to the Oil Conservation Engineer, in triplicate, within 30 days after the abandonment, suspension or completion of any well,
(a) copies of all logs run in the well;
(b) copies of all drill stem test charts and the results of each test;
(c) copies of all core, gas or fluid analyses;
(d) copies of all bottom hole sample analyses including pressure, volume and temperature data; and
(e) copies of a well completion report on a form approved by the Chief.
(2) In the case of a well other than a development well, the licensee, permittee or lessee shall also submit to the Oil Conservation Engineer a Well History Report, in triplicate, within 30 days after completion, suspension or abandonment of the well.
(3) A permittee or lessee shall also send to the Oil Conservation Engineer, in triplicate, copies of all other surveys or the results of any tests conducted during the producing life of a well or field.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Territorial Lands Act, R.S.C. 1985, c. T-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.