Large Fishing Vessel Inspection Regulations, C.R.C., c. 1435

Section 23

Cite as Large Fishing Vessel Inspection Regulations, C.R.C., c. 1435, s. 23 · current to July 24, 2025 · regulation last amended February 21, 2023

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) Subject to subsections (2) and (3), bulwarks, rails, chains, wire rope or any combination of these shall be fitted around the weatherdeck, at least 760 mm in height above the weatherdeck. (2) The Chairman may allow the bulwarks, rails, chains and wire rope mentioned in subsection (1) to be portable or to be dispensed with, at his discretion, at places where, in his opinion, they would interfere with the fishing operations of the vessel. (3) The bulwarks, rails, chains or wire rope referred to in subsection (1) may be less than 760 mm in height in way of deckhouses if suitable handrails are fitted on the sides of such deckhouses. (4) Subject to subsections (5) to (7), where bulwarks on weather parts of the working deck form wells, the minimum freeing port area (expressed in m2) on each side of the vessel for each well on the working deck shall be not less than the lesser of (a) 0.7 + 0.035 l, where l is 20 m or less, and (b) 0.07 l, where l exceeds 20 mwhere l is the lesser of the length of bulwark in the well and 70 per cent of the length of the vessel. (5) Where the height of the bulwark in a well on the working deck is more than 1 200 mm, the minimum freeing port area shall be increased, for each 100 mm in excess of 1 200 mm, by 0.004 m2 per metre of length of well. (6) Where the height of the bulwark in a well on the working deck is less than 900 mm, the minimum freeing port area may be decreased, for each 100 mm less than 900 mm, by 0.004 m2 per metre of length of well. (7) Where the vessel’s sheer is such that the minimum freeing port areas calculated in accordance with subsections (4) to (6) do not provide rapid and effective freeing of water from the deck, those areas shall be increased in order to so provide. (8) The minimum freeing port area for each well on a superstructure deck shall be not less than one-half the minimum freeing port area on the working deck calculated in accordance with subsections (4) to (7). (9) Freeing ports shall be so arranged along the length of bulwarks as to provide rapid and effective freeing of trapped water from the deck, and the lower edges of freeing ports shall be as close to the deck as possible. (10) Poundboards and means of stowage of fishing gear shall be arranged and stowed so that the effectiveness of freeing ports will not be impaired. (11) Poundboards shall be so constructed that they can be secured in position when in use and will not hamper the discharge of shipped water. (12) Freeing ports over 300 mm in depth shall be fitted with bars spaced not more than 230 mm apart or with other suitable protective devices. (13) Where the protective devices fitted in accordance with subsection (12) are covers, they shall be of approved construction. (14) In a vessel intended to operate in areas subject to icing, protective devices fitted in accordance with subsection (12) shall be capable of being easily removed to restrict or reduce ice accretion.
Read the Large Fishing Vessel Inspection Regulations on the Justice Laws Website ↗

Made under Canada Shipping Act, 2001, S.C. 2001, c. 26.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.