Hull Construction Regulations, C.R.C., c. 1431
Section 82.3
Cite as Hull Construction Regulations, C.R.C., c. 1431, s. 82.3 · current to July 24, 2025 · regulation last amended December 20, 2023
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) Where any cargo ports and other access openings above the bulkhead deck are located
(a) in the ship’s side, or
(b) at an exposed location on an enclosure and the enclosure protects any openings in the bulkhead deck that are not fitted with weathertight closing appliances,the number of such cargo ports and other access openings shall be the minimum compatible with the design and proper working of the ship and each such opening shall be fitted with approved closing appliances so constructed as to maintain the structural and weathertight integrity of the ship’s side or that enclosure.
(2) Every opening referred to in subsection (1) that is located in the first tier of superstructures above the bulkhead deck and that has a clear opening of more than 1.5 m2 shall be provided with a sensing device that will activate a green indicator light located in the wheelhouse, which light remains continuously lit as long as the closing appliance with which the opening is fitted is closed and effectively secured.
Read the Hull Construction Regulations on the Justice Laws Website ↗
Made under Canada Shipping Act, 2001, S.C. 2001, c. 26.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.