Hull Construction Regulations, C.R.C., c. 1431
Section 82
Cite as Hull Construction Regulations, C.R.C., c. 1431, s. 82 · current to July 24, 2025 · regulation last amended December 20, 2023
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) Where a bulk cargo vessel, the keel of which was laid on or after March 22, 1967 is constructed with side tunnels, the access to the side tunnels shall be from within a deckhouse or companionway on the upper deck and not through the watertight bulkhead at the forward end of the after machinery space nor through the watertight bulkhead at the forward end of the No. 1 cargo hold.
(2) Where a bulk cargo vessel, coming under inspection for the first time, is constructed with side tunnels, the requirements of subsection (1) shall be complied with, unless it is shown to the satisfaction of the Board that compliance with those requirements is impracticable.
(3) Where a bulk cargo vessel, the keel of which was laid before March 22, 1967 is constructed with side tunnels, the means of access thereto shall be to the satisfaction of the Board.
Read the Hull Construction Regulations on the Justice Laws Website ↗
Made under Canada Shipping Act, 2001, S.C. 2001, c. 26.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.