New York 2025 Session Status: Introduced

A6955 — Relates to setback requirements relating to the siting of battery energy storage systems

Last action — In Assembly Committee

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the Assembly. Introduced March 18, 2025. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Prognosis

Not enough signal yet

Where this bill stands today.

Odds of enactment

Low

How often bills like it became law.

Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Directs the department of public service to promulgate rules, regulations and model policies regarding setback requirements for the siting of battery energy storage systems; requires minimum setback requirements for commercial energy storage systems, with a capacity of three megawatts or greater, of no less than seven hundred fifty feet from residential property and no less than three hundred feet from residential property located in a city with a population of one million or more inhabitants; requires public hearings prior to the approval of an application for a permit for such systems.

Bill Text

Action History

  1. PRINT NUMBER 6955C

  2. AMEND AND RECOMMIT TO ENERGY

  3. PRINT NUMBER 6955B

  4. AMEND (T) AND RECOMMIT TO ENERGY

  5. REFERRED TO ENERGY

  6. PRINT NUMBER 6955A

  7. AMEND (T) AND RECOMMIT TO ENERGY

  8. REFERRED TO ENERGY

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 218 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (218)

218 members have not signed on to this bill.

Show all 218 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does A6955 do?
Directs the department of public service to promulgate rules, regulations and model policies regarding setback requirements for the siting of battery energy storage systems; requires minimum setback requirements for commercial energy storage systems, with a capacity of three megawatts or greater, of no less than seven hundred fifty feet from residential property and no less than three hundred feet from residential property located in a city with a population of one million or more inhabitants; requires public hearings prior to the approval of an application for a permit for such systems.
Who sponsors A6955?
A6955 is sponsored by Jaime R. Williams.
What is the current status of A6955?
This bill has been introduced in the Assembly. Introduced March 18, 2025. It must pass committee before a floor vote.
Where can I track A6955?
Track A6955 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on A6955

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of A6955

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →