A6951 — Relates to periods suspending the operation of certain rate, charge or other changes by utilities, and provisions permitting utilities to retroactively recover revenues they would have earned during such periods
Last action — Stricken
-
1Introduced
-
2In Committee
-
3Passed Assembly
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill has been introduced in the Assembly. Introduced March 18, 2025. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Odds of enactment
Low chanceBased on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
Summary
Provides that subsequent requests for an extension of a suspension period for certain rate, charge or other changes by utilities shall require approval by the public service commission and shall be valid for one month, after which the commission shall review and determine the necessity of a further extension; provides limitations on retroactive rate recovery by utilities.
Bill Text
- Full text View text Current
Action History
-
ENACTING CLAUSE STRICKEN
-
REFERRED TO ENERGY
Sponsors
- Zohran Mamdani · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 218 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (218)
218 members have not signed on to this bill.
Show all 218 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does A6951 do?
- Provides that subsequent requests for an extension of a suspension period for certain rate, charge or other changes by utilities shall require approval by the public service commission and shall be valid for one month, after which the commission shall review and determine the necessity of a further extension; provides limitations on retroactive rate recovery by utilities.
- Who sponsors A6951?
- A6951 is sponsored by Zohran Mamdani.
- What is the current status of A6951?
- This bill has been introduced in the Assembly. Introduced March 18, 2025. It must pass committee before a floor vote.
- Where can I track A6951?
- Track A6951 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on A6951
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of A6951
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →