New York 2025 Session Status: Introduced

A6951 — Relates to periods suspending the operation of certain rate, charge or other changes by utilities, and provisions permitting utilities to retroactively recover revenues they would have earned during such periods

Last action — Stricken

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the Assembly. Introduced March 18, 2025. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Odds of enactment

Low chance

Based on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Not enough signal yet

Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Summary

Provides that subsequent requests for an extension of a suspension period for certain rate, charge or other changes by utilities shall require approval by the public service commission and shall be valid for one month, after which the commission shall review and determine the necessity of a further extension; provides limitations on retroactive rate recovery by utilities.

Bill Text

Action History

  1. ENACTING CLAUSE STRICKEN

  2. REFERRED TO ENERGY

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 218 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (218)

218 members have not signed on to this bill.

Show all 218 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does A6951 do?
Provides that subsequent requests for an extension of a suspension period for certain rate, charge or other changes by utilities shall require approval by the public service commission and shall be valid for one month, after which the commission shall review and determine the necessity of a further extension; provides limitations on retroactive rate recovery by utilities.
Who sponsors A6951?
A6951 is sponsored by Zohran Mamdani.
What is the current status of A6951?
This bill has been introduced in the Assembly. Introduced March 18, 2025. It must pass committee before a floor vote.
Where can I track A6951?
Track A6951 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on A6951

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of A6951

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →