New York 2025 Session Status: Introduced

S5593 — Relates to periods suspending the operation of certain rate, charge or other changes by utilities, and provisions permitting utilities to retroactively recover revenues they would have earned during such periods

Last action — In Assembly Committee

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed Assembly
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the Senate. Introduced February 25, 2025. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Prognosis

Not enough signal yet

Where this bill stands today.

Odds of enactment

Low

How often bills like it became law.

Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Provides that subsequent requests for an extension of a suspension period for certain rate, charge or other changes by utilities shall require approval by the public service commission and shall be valid for one month, after which the commission shall review and determine the necessity of a further extension; provides limitations on retroactive rate recovery by utilities.

Bill Text

Action History

  1. REFERRED TO ENERGY

  2. DELIVERED TO ASSEMBLY

  3. PASSED SENATE

  4. ORDERED TO THIRD READING CAL.144

  5. REPORTED AND COMMITTED TO RULES

  6. REFERRED TO ENERGY AND TELECOMMUNICATIONS

  7. RETURNED TO SENATE

  8. DIED IN ASSEMBLY

  9. REFERRED TO ENERGY

  10. DELIVERED TO ASSEMBLY

  11. PASSED SENATE

  12. ADVANCED TO THIRD READING

  13. 2ND REPORT CAL.

  14. 1ST REPORT CAL.1515

  15. REFERRED TO ENERGY AND TELECOMMUNICATIONS

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 218 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (218)

218 members have not signed on to this bill.

Show all 218 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S5593 do?
Provides that subsequent requests for an extension of a suspension period for certain rate, charge or other changes by utilities shall require approval by the public service commission and shall be valid for one month, after which the commission shall review and determine the necessity of a further extension; provides limitations on retroactive rate recovery by utilities.
Who sponsors S5593?
S5593 is sponsored by Shelley Mayer.
What is the current status of S5593?
This bill has been introduced in the Senate. Introduced February 25, 2025. It must pass committee before a floor vote.
Where can I track S5593?
Track S5593 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S5593

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S5593

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →