New York 2025 Session Status: Introduced

S3800 — Requires operators of nuclear power plants to give notice of scheduled and unscheduled releases of radioactive materials and of breakdowns or malfunctions

Last action — In Senate Committee

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed Assembly
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the Senate. Introduced January 30, 2025. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Prognosis

Not enough signal yet

Where this bill stands today.

Odds of enactment

Low

How often bills like it became law.

Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Requires operators of nuclear power plants (or designee) to give notice of: scheduled releases of radioactive materials at least 24 hours before the release is planned to occur; unscheduled releases of such materials as soon as possible, but not more than 24 hours after discovery of the release; and breakdowns or malfunctions; specifies that such notice shall be given to specified parties, including to the public via a toll free number; specifies elements to be contained in the notice (i.e. the total amount of radioactivity released or planned to be released, the estimated individual dose that may occur due to the event, weather conditions at the time of release, the area affected or anticipated to be affected, the equipment that malfunctioned or the operator error or other condition that caused the release, and the corrective action taken); requires study thereof by the commissioner of health; requires preparation and distribution of a report thereupon by the commissioner of health; provides for submission of annual reports by operators of nuclear power plants; provides monetary penalties for violations.

Bill Text

Action History

  1. REFERRED TO VETERANS, HOMELAND SECURITY AND MILITARY AFFAIRS

  2. REFERRED TO VETERANS, HOMELAND SECURITY AND MILITARY AFFAIRS

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 218 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (218)

218 members have not signed on to this bill.

Show all 218 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S3800 do?
Requires operators of nuclear power plants (or designee) to give notice of: scheduled releases of radioactive materials at least 24 hours before the release is planned to occur; unscheduled releases of such materials as soon as possible, but not more than 24 hours after discovery of the release; and breakdowns or malfunctions; specifies that such notice shall be given to specified parties, including to the public via a toll free number; specifies elements to be contained in the notice (i.e. the total amount of radioactivity released or planned to be released, the estimated individual dose that may occur due to the event, weather conditions at the time of release, the area affected or anticipated to be affected, the equipment that malfunctioned or the operator error or other condition that caused the release, and the corrective action taken); requires study thereof by the commissioner of health; requires preparation and distribution of a report thereupon by the commissioner of health; provides for submission of annual reports by operators of nuclear power plants; provides monetary penalties for violations.
Who sponsors S3800?
S3800 is sponsored by Kevin S. Parker.
What is the current status of S3800?
This bill has been introduced in the Senate. Introduced January 30, 2025. It must pass committee before a floor vote.
Where can I track S3800?
Track S3800 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S3800

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S3800

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →