AB 856 — Relating to: the managed forest land program. (FE)
Last action — Failed to concur in pursuant to Senate Joint Resolution 1
-
✓Introduced
-
✓In Committee
-
3Passed Assembly
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill died with 2019-2020 Regular Session. It reached “Passed Assembly” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Bill Text
What changed in the latest version
350 added · 108 removedPlain-language change summary
The recent amendment to Assembly Bill 856 modifies the rules surrounding the Managed Forest Land (MFL) program, specifically concerning the size and contiguity of land eligible for designation. Now, parcels of land that are at least 20 acres can be enrolled in the program even if part of that land is separated by a public road, provided certain conditions are met. This change could encourage more landowners to participate in the program, promoting better forest management and public access while potentially increasing the number of forested areas available for recreational use.
- 2020 LEGISLATURE LRBa1125/1LRB-5118/1 EHS:cdcEHS:kjf ASSEMBLY AMENDMENT 1, TO ASSEMBLY BILL 856 February 11,3, 2020 - OfferedIntroduced by Representative URSAU.M URSAU .
AtReferred theto locationsCommittee indicated,on amendForestry, theParks billand asOutdoor follows:Recreation.
1.A N A CT to repeal 77.82 (1) (bp) 2.
Pageg., 4,77.83 line(2) 1:(ar) and 77.88 (3m);
deleteto therenumber material beginning with that line and endingamend with77.82 page(11); 6, line 21, and substitute:
“Sto ECTIONamend 1m.70.365, 77.82 (1) (a) 1., 77.82 (4), 77.84 (1), 77.88 (2) (ac) 3., 77.88 (2) (c), 77.88 (3) (am), 77.88 (3) (b) (intro.), 77.88 (3j) (title), 77.88 (3j) (a) 1., 77.88 (3k), 77.88 (3L) and 77.88 (5m);
and to create 77.82 (1) (bp) 4.
and 77.82 (3) (h) of the statutes;
relating to:
the managed forest land program.
Analysis by the Legislative Reference Bureau This bill makes numerous changes to the managed forest land (MFL) program administered by the Department of Natural Resources.
Introduction Under current law, certain forested land may be designated as MFL under a program administered by DNR.
Under this program, the owner of land designated as MFL makes an annual acreage share payment that is lower than, and in lieu of, the property taxes that normally would be payable.
In exchange, the owner must comply with certain forestry practices and have a management plan prepared for the land.
The owner must also open the MFL to the public for hunting, fishing, hiking, sight-seeing, and cross-country skiing, but may designate up to a certain number of acres as being closed to the public.
For MFL that is designated as closed, the owner must pay an additional closed acreage fee.
An owner seeking to have land designated - 2020 Legislature - 2 - LRB-5118/1 EHS:kjf ASSEMBLY BILL 856 as MFL submits an application to DNR that contains a management plan for the land.
If the MFL meets the eligibility requirements under the program, which include minimum acreage requirements and requirements as to how much merchantable timber can be produced on the land, DNR approves the application and issues an order designating the land as MFL.
An owner may choose to have the order last 25 or 50 years.
Eligibility Under current law, a parcel of land is eligible for designation as MFL only if it consists of at least 20 contiguous acres.
This was increased from a minimum of ten acres under 2015 Wisconsin Act 358.
Under current law, the fact that a lake, river, stream, or flowage, a public or private road, or a railroad or utility right-of-way separates any part of the parcel from any other part does not render it noncontiguous.
Under this bill, land in a parcel may be composed of individual portions no smaller than ten contiguous acres each that are not contiguous to each other as long as all such portions are contained within a tract of contiguous land of acres or more that is under the same ownership.
Under the bill, the fact that a lake, river, stream, or flowage, a public or private road, or a railroad or utility right-of-way separates any part of the land from any other part does not render a parcel noncontiguous and does not render ownership of the land noncontiguous.
These changes first apply to land designated as MFL by an order issued on July 1, 2016, which is the date on which the minimum acreage change and other eligibility changes under Act 358 first applied.
Under current law, land is not eligible for designation as MFL if a building or an improvement associated with a building is located on it.
Current law specifies that an improvement includes any accessory building, structure, or fixture that is built or placed on the parcel for its benefit, but does not include, among other things, a structure or fixture needed for sound forestry practices.
The bill eliminates this exception to an improvement, but more broadly provides that the prohibition on buildings and improvements does not apply to a building used exclusively for storage.
This change also first applies to land designated as MFL by an order issued on July 1, 2016.
Under current law, an owner of land that is designated as MFL may file an application with DNR to designate an additional parcel of land as MFL if the additional parcel is at least three acres in size and is contiguous to any of that designated land.
Under this bill, such an additional parcel may be any size and must only be contiguous to land under the same ownership that contains the designated land as long as any portion not contiguous to the designated land meets the ten-acre minimum requirements under the bill.
The bill specifies that the eligibility requirements applicable to such an addition are the eligibility requirements under the order that designated the parcel to which the land is being added.
Material change to law Under current law, if a statute is enacted or a rule is promulgated during the period of the order that materially changes the terms of the order, the landowner must elect between acceptance of modifications to the contract consistent with the provisions of the statute or rule or voluntary withdrawal of the land without penalty.
LRB-5118/1 - 2020 Legislature - 3 - EHS:kjf ASSEMBLY BILL 856 This bill adds that a statutory change does not constitute a material change to an order unless, in the act that makes the change, the legislature states that the act or a provision in the act makes a material change to orders entered into under prior law.
Under the bill, this first applies to this bill, itself, which does not contain such a statement.
Further, under the bill, a promulgated rule does not constitute a material change to an order unless the rule includes a statement that the rule constitutes a material change to orders entered into under prior rules and DNR includes in its report to the legislature on the proposed rule a statement that the rule constitutes a material change to orders entered into under prior rules and an analysis of this determination.
Withdrawal taxes and fees This bill reinstates a requirement that DNR assess a withdrawal tax and fee against an owner of MFL who voluntarily withdraws part or all of a parcel, which was eliminated under Act 358.
Current law allows an owner of MFL to sell or otherwise transfer all or part of the owner's parcel of MFL, and the transferred land continues to be designated as MFL if it meets eligibility requirements and the transferee certifies to DNR an intent to comply with the existing management plan for the land and any amendments to the plan.
If the transferee does not provide this certification to DNR, current law requires DNR to issue an order withdrawing the land and to assess against the transferee the withdrawal tax and fee.
Similarly, after a transfer if the remaining land in the parcel does not meet eligibility requirements, current law requires DNR to issue an order withdrawing the land and to assess against the owner the withdrawal tax and fee.
Show all 216 changed lines (176 more)
Under this bill, in both of these circumstances DNR may, but is not required to, assess the withdrawal tax and fee.
Under current law, an owner of MFL may request to withdraw part of a parcel and DNR must issue an order of withdrawal if DNR determines that the parcel is either unable to produce merchantable timber in the amount required by law or unsuitable, due to environmental, ecological, or economic concerns or factors, for the production of merchantable timber.
Current law requires that the order withdraw only the number of acres necessary for the parcel to resume its ability to produce the required amount or to resume its sustainability to produce merchantable timber, and prohibits the assessment of a withdrawal tax or fee for the withdrawal.
This bill adds that, if the land remaining in the parcel after the withdrawal will not meet eligibility requirements under the order designating the MFL, the order must withdraw the entire parcel, and may not assess a withdrawal tax or fee.
Small land sales Under current law, generally an owner of MFL may voluntarily withdraw part of a parcel of the owner's land once per 25-year order and twice per 50-year order if the purpose for which the owner requests the withdrawal is for the sale of one to five acres of the land or for a construction site.
Current law separately allows an owner of MFL to sell or transfer ownership of all or part of the owner's land an unlimited number of times per order.
This bill harmonizes these provisions by removing the sale of land as a purpose for a voluntary withdrawal under the former.
- 2020 Legislature - 4 - LRB-5118/1 EHS:kjf ASSEMBLY BILL 856 Large ownerships The bill authorizes DNR to promulgate rules that subject large ownerships, meaning 1,000 or more acres of land designated as MFL under the same owner, to management plan requirements that deviate from the requirements that apply under statute.
Taxation of buildings The bill removes a current law provision stating that a building on MFL is taxed as personal property, and eliminates the current law penalty that applies for failure to pay such personal property tax, which is withdrawal of the land from MFL and assessment of the withdrawal tax and fee.
Leasing This bill eliminates a provision authorizing an owner of MFL that is designated as closed to enter into a lease or other agreement for consideration that permits persons to engage in a recreational activity on the land.
Under the bill, there are no prohibitions on leasing land under the MFL program.
For further information see the state and local fiscal estimate, which will be printed as an appendix to this bill.
The people of the state of Wisconsin, represented in senate and assembly, do enact as follows:
S ECTION 1.
70.365 of the statutes, as affected by 2019 Wisconsin Act 2, is amended to read:
70.365 Notice of changed assessment.
When the assessor assesses any taxable real property, or any improvements taxed as personal property under s.
77.84 (1), and arrives at a different total than the assessment of it for the previous year, the assessor shall notify the person assessed if the address of the person is known to the assessor, otherwise the occupant of the property.
However, the assessor is not required to provide notice under this section if land is classified as agricultural land, as defined in s.
70.32 (2) (c) 1g., for the current year and previous year and the difference between the assessments is $500 or less.
If the assessor determines that land assessed under s.
70.32 (2r) for the previous year is no longer eligible to be assessed under s.
70.32 (2r), and the current classification under s.
70.32 (2) (a) is not LRB-5118/1 - 2020 Legislature - 5 - EHS:kjf SECTION 1 ASSEMBLY BILL 856 undeveloped, agricultural forest, productive forest land, or other, the assessor shall notify the person assessed if the assessor knows the person's address, or otherwise the occupant of the property, that the person assessed may be subject to a conversion charge under s.
74.485.
Any notice issued under this section shall be in writing and shall be sent by ordinary mail at least 15 days before the meeting of the board of review or before the meeting of the board of assessors in 1st class cities and in 2nd class cities that have a board of assessors under s.
70.075, except that, in any year in which the taxation district conducts a revaluation under s.
70.05, the notice shall be sent at least 30 days before the meeting of the board of review or board of assessors.
The notice shall contain the amount of the changed assessment and the time, date, and place of the meeting of the local board of review or of the board of assessors.
However, if the assessment roll is not complete, the notice shall be sent by ordinary mail at least 15 days prior to the date to which the board of review or board of assessors has adjourned, except that, in any year in which the taxation district conducts a revaluation under s.
70.05, the notice shall be sent at least 30 days prior to the date to which the board of review or board of assessors has adjourned.
The assessor shall attach to the assessment roll a statement that the notices required by this section have been mailed and failure to receive the notice shall not affect the validity of the changed assessment, the resulting changed tax, the procedures of the board of review or of the board of assessors or the enforcement of delinquent taxes by statutory means.
After the person assessed or the occupant of the property receives notice under this section, if the assessor changes the assessment as a result of the examination of the rolls as provided in s.
70.45 and the person assessed waives, in writing and on a form prescribed or approved by the department of revenue, the person's right to the notice of the changed assessment under this section, no - 2020 Legislature - 6 - LRB-5118/1 EHS:kjf ASSEMBLY BILL 856 SECTION 1 additional notice is required under this section.
The secretary of revenue shall prescribe the form of the notice required under this section.
The form shall include information notifying the taxpayer of the procedures to be used to object to the assessment.
The form shall also indicate whether the person assessed may be subject to a conversion charge under s.
74.485.
SECTION 2.
It consists of at least 20iguous20 acres,contigacres, which may be composed of individual portions, no smaller than 10 contiguous acres each, that are not contiguous with each other if all individual portions are contained within a tract of contiguous land of 20 acres or more that is under the same ownership, except as provided in this subdivision.
The fact that a lake, river,orriver, flowage,stream,, a public or private road,orroaor a railroad or utility right-of-way separates any part of the land from any other part does not render a parcel of land noncontiguous.
(b).(b) and does not render ownership of land noncontiguous.
The owner of a parcel of less than 20 acres that is subject to a managed LRBa1125/1 - 2020 Legislature - 2 - EHS:cdc forest land order before April 16, 2016, may apply one time for a renewal of the order under sub.
SSECTION ECTION3. 2m.
77.82 (1) (a)(bp) 3.2.
g.
of the statutes is repealed.
SECTION 4.
77.82 (1) (bp) 4.
77.82 (1) (a)(bp) 3.4.
a.Notwithstanding par.
It(b) is3., locateda inbuilding aused tractexclusively offor landstorage underthat theis samelocated ownershipon thata containsparcel atdoes leastnot 20make acresthat inparcel parcelsineligible thatfor meetdesignation theas requirementsmanaged underforest subds.land.
1.LRB-5118/1 - 2020 Legislature - 7 - EHS:kjf SECTION 5 ASSEMBLY BILL 856 SECTION 5.
and77.82 2.(3) (h) of the statutes is created to read:
and77.82 for(3) which(h) designation1. under a single managed forest land order is sought, except as provided in subd.
3.Under this paragraph, “large ownership” means 1,000 or more acres of land designated as managed forest land that has the same owner.
b.
b.
A parcel that does not meet the requirement in subd.
3.
a.
but that is subject to a managed forest land order before April 16, 2016, is eligible for a onetime renewal of the order under sub.
(12) without meeting the requirement under subd.
3.
a.
S ECTION 3m.
77.82 (1) (bp) 1.
a.
of the statutes is amended to read:
77.82 (1) (bp) 1.
a.
Any accessory building,cture, or fixture that is built or placed on the parcel for its benefit.”.
PageThe 7,department linemay 7:promulgate rules that subject large ownerships to management plan requirements that deviate from the requirements under pars.
delete(ag) lines 7 to 24(g). and substitute:
“SSECTION ECTION6. 6m.
An owner of land that is designated as managed forest land may file an application with the department to designate as managed forest land an additional parcel of land if the additional parcel is at least 3 acres in size and isguousis contiguous to any of land under the same ownership that contains that designated land orand isany portion not contiguous to that designated land but meets the requirements under sub.
The fee shall be deposited in the conservation fund and LRBa1125/1 - 2020 Legislature - 3 - EHS:cdc credited to the appropriation under s.
The tax rate applicable to an addition under this subsection shall be the tax rate currently applicable to the pamanagedparcel forest land order to which the land is being added.
ExceptThe foreligibility therequirements minimumapplicable acreageto an addition under this subsection are the eligibility requirements under sub.the order that designated the parcel to which the land is being added.
(1)- (a)2020 1.,Legislature the- eligibility8 requirements- applicableLRB-5118/1 toEHS:kjf anASSEMBLY additionBILL under856 thisSECTION subsection7 areSECTION the7. eligibility requirements under the managed forest land order to which the land is being added.”.
3.77.82 (11) of the statutes is renumbered 77.82 (11) (a) and amended to read:
Page77.82(11) 8,(a) lineAn 23:order issued under this subchapter shall constitute a contract between the state and the owner and shall remain in effect for the period specified in the application unless the land is withdrawn under s.
delete77.84 the(3) material(b) beginningor with77.88. that line and ending with page 9, line 13, and substitute:
“SECTIONExcept 9m.as provided in subs.
77.88(3) (2)(f) (am)and of(11m), the statutesdepartment ismay amendednot amend or otherwise change the terms of an order or management plan to read:conform with changes made to any provision of this subchapter subsequent to the date on which the order was entered or the plan was approved.
77.88(b) (2)If (am)a Transferredstatute land;is enacted or a rule is promulgated during the period of the order that materially changes the terms of the order as provided under this paragraph landowner shall elect between acceptance of modifications to the contract consistent with the provisions of the statute or rule or voluntary withdrawal of the land without penalty.
A statutory change does not constitute a material change to an order unless, in the act that makes the change, the legislature states that the act or a provision in the act makes a material change to orders entered into under prior law.
A promulgated rule does not constitute a material change to an order unless the rule includes a statement that the rule constitutes a material change to orders entered into under prior rules and the department includes in its report to the legislature under s.
227.19 (2) a statement that the rule constitutes a material change to orders entered into under prior rules and an analysis of this determination.
SECTION 8.
77.83 (2) (ar) of the statutes is repealed.
SECTION 9.
77.84 (1) of the statutes is amended to read:
77.84 (1) TAX ROLL.Each clerk of a municipality in which the land is located shall enter in a special column or other appropriate place on the tax roll the LRB-5118/1 - 2020 Legislature - 9 - EHS:kjf SECTION 9 ASSEMBLY BILL 856 description of each parcel of land designated as managed forest land, and shall specify, by the designation “MFL-O" or “MFL-C", the acreage of each parcel that is designated open or closed under s.
77.83.
The land shall be assessed and is subject to review under ch.
70.
Except as provided in this subchapter, no tax may be levied on managed forest land, except that any building on managed forest land is subject to taxation as personal property under ch.
70.
SECTION 10.
77.88 (2) (ac) 3.
of the statutes is amended to read:
77.88 (2) (ac) 3.
If the transferee does not provide the department with the certification required under subd.
1., the department shall issue an order withdrawing the land and shallay assess against the transferee the withdrawal tax under sub.
(5) and the withdrawal fee under sub.
(5m).
Notwithstanding s.
77.90, the transferee is not entitled to a hearing on an order withdrawing land under this subdivision.
SECTION 11.
77.88 (2) (c) of the statutes is amended to read:
77.88(2) (c) Remaining land;
If the land transferredremaining after a transfer under par.
77.82 (1) (a) and (b), the department shall issue an order withdrawing the land from managed forest land designation and shall may assess against the owner athe withdrawal tax under sub.
(5m).”.(5m).
4.Notwithstanding s.
Page77.90, 10,the lineowner 13:is not entitled to a hearing on an order withdrawing land under this paragraph.
deleteSECTION the12. material beginning with that line and ending with page 11, line 14, and substitute:
“SECTION77.88 16m.(3) (am) of the statutes is amended to read:
77.8877.88(3) (3k)(am) ofEntire theparcels. statutes is renumbered 77.88 (3k) (intro.) and amended to read:
77.88Upon (3k)request VOLUNTARYof WITHDRAWAL;an owner of managed forest land to withdraw an entire parcel of managed forest land, the department shall issue an order withdrawing the land and assess against the owner the withdrawal tax under sub.
PRODUCTIVITY.(5) and the withdrawal fee under sub.
(intro.)(5m). Upon the request of an owner of managed forest land to withdraw part of a parcel of the owner's land, the department shall issue an order of withdrawal if the department determines that the parcel is unable to produce merchantable timber in the amount required under s.
LRBa1125/1 - 2020 Legislature - 410 - EHS:cdcLRB-5118/1 77.82EHS:kjf (1)ASSEMBLY (a)BILL 2.856 SECTION 13 SECTION 13.
The77.88 order(3) shall(b) withdraw(intro.) onlyof the numberstatutes of acres that is necessaryamended for the parcel to resumeread: its ability to produce the required amount.
77.88 (3) (b) Parts of parcels.
(intro.) Upon request of an owner of managed forest land to withdraw part of a parcel of managed forest land, the department shall issue an order withdrawing the land subject to the request and assess against the owner the withdrawal tax under sub.
(5) and the withdrawal fee under sub.
(5m) if all of the following apply:
SECTION 14.
77.88 (3j) (title) of the statutes is amended to read:
77.88 (3j) (title)OLUNTARY WITHDRAWAL;
OTHER CONSTRUCTION;
SMALL LAND SALES.
SECTION 15.
77.88 (3j) (a) 1.
of the statutes is amended to read:
77.88 (3j) (a) 1.
The purpose for which the owner requests that the department withdraw the land is for the sale of the land or for a construction site.
SECTION 16.
77.88 (3k) of the statutes is amended to read:
77.88(3k) VOLUNTARY WITHDRAWAL;
PRODUCTIVITYUpon the request of an owner of managed forest land to withdraw part of a parcel of the owner's land, the department shall issue an order of withdrawal if the department determines that the parcel is unable to produce merchantable timber in the amount required under s.
77.82 (1) (a) 2.
The order shall withdraw only the number of acres that is necessary for the parcel to resume its ability to produce the required amount, but if the land remaining after the withdrawal will not meet the eligibility requirements under the order designating the managed forest land, the order shall withdraw the entire parcel.
TheSECTION order17. shall withdraw only the number of acres that is necessary for the parcel to resume its ability to produce the required amount, except that all of the following apply:
SECTION77.88 17m.(3L) of the statutes is amended to read:
77.88LRB-5118/1 (3k)- (a)2020 andLegislature (b)- of11 the- statutesEHS:kjf areSECTION created17 toASSEMBLY read:BILL 856 77.88 (3L) V OLUNTARY WITHDRAWAL;
77.88 (3k) (a) If the land remaining in the parcel after the requested withdrawal does not meet the eligibility requirements under the order designating the managed forest land, the withdrawal order shall withdraw the entire parcel.
(b) If the land subject to a managed forest land order after the requested withdrawal does not meet the eligibility requirements under that managed forest land order, the withdrawal order shall withdraw all land under that managed forest land order.
SECTION 18m.
77.88 (3L) of the statutes is renumbered 77.88 (3L) (intro.) and amended to read:
77.88 (3L) V OLUNTARY WITHDRAWAL;
(intro.) Upon the request of an owner of managed forest land to withdraw part of a parcel of the owner's land, the department shall issue an order of withdrawal if the department determines that the parcel is unsuitable, due to environmental, ecological, or economic concerns or factors, for the production of merchantable timber.
The order shall withdraw only the number of acres that is necessary for the parcel to resume its sustainability to produce merchantable timber.timber, but if the land remaining after the withdrawal will not meet the eligibility requirements under the order designating the managed forest land, the order shall withdraw the entire parcel.
TheSECTION order18. shall withdraw only the number of acres that is necessary for the parcel to resume its sustainability to produce merchantable timber, except that all of the following apply:
LRBa1125/177.88 -(3m) 2020of Legislaturethe -statutes 5is -repealed. EHS:cdc SECTION 19m.
77.88SECTION (3L)19. (a) and (b) of the statutes are created to read:
77.88 (3L)(5m) (a)of If the landstatutes remainingis inamended theto parcelread: after the requested withdrawal does not meet the eligibility requirements under the order designating the managed forest land, the withdrawal order shall withdraw the entire parcel.
(b)77.88 If(5m) theW landITHDRAWAL subjectFEE. to a managed forest land order after the requested withdrawal does not meet the eligibility requirements under that managed forest land order, the withdrawal order shall withdraw all land under that managed forest land order.”.
5.The withdrawal fee assessed by the department under subs.
Page(1) 11,(c), line(2) 19:(ac) 2., (am), and (c), and (3), and (3m) shall be $300.
deleteSECTION “2.20.0Initial applicability.
g."(1) andMINIMUM substituteACREAGE. “1.
a.".The treatment of s.
77.82 (1) (a) 1.
first applies to land designated as managed forest land by an order issued on the effective dECTION S 101 (2) of 2015 Wisconsin Act 358.
(2) BUILDINGS ON PARCELS.
The treatment of s.
77.82 (1) (bp) 2.
g.
and 4.
first applies to land designated as managed forest land under an order issued or renewed on the effective date oECTION 101 (3) of 2015 Wisconsin Act 358.
(3) MATERIAL CHANGE.
The treatment of s.
77.82 (11) first applies to a statutory change in an act that takes effect on the effective date of this subsection.
Show all 216 changed rows (176 more)
View plain text versions (2)
- Bill Text View text pdf
- Amended Assembly Amendment 1 Current pdf
Action History
-
Failed to concur in pursuant to Senate Joint Resolution 1
-
Read first time and referred to committee on Sporting Heritage, Mining and Forestry
-
Received from Assembly
-
Ordered immediately messaged
-
Read a third time and passed
-
Rules suspended
-
Ordered to a third reading
-
Assembly Amendment 1 adopted
-
Read a second time
-
Made a special order of business at 11:09 AM on 2-20-2020 pursuant to Assembly Resolution 21
-
Referred to committee on Rules
-
Report passage as amended recommended by Committee on Forestry, Parks and Outdoor Recreation, Ayes 7, Noes 4
-
Report Assembly Amendment 1 adoption recommended by Committee on Forestry, Parks and Outdoor Recreation, Ayes 7, Noes 4
-
Fiscal estimate received
-
Executive action taken
-
Assembly Amendment 1 offered by Representative Mursau
-
LRB correction
-
Fiscal estimate received
-
Public hearing held
-
Read first time and referred to Committee on Forestry, Parks and Outdoor Recreation
-
Introduced by Representative Mursau
Sponsors
- Jeffrey Mursau · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 131 not signed on
Sponsors (1)
- Mursau, Jeffrey Republican
Co-sponsors (0)
None.
Not signed on (131)
131 members have not signed on to this bill.
Show all 131 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
Roll call published as PDF — view source.
Roll call published as PDF — view source.
Subjects
Frequently asked questions
- Who sponsors AB 856?
- AB 856 is sponsored by Mursau, Jeffrey (Republican).
- What is the current status of AB 856?
- This bill died with 2019-2020 Regular Session. It reached “Passed Assembly” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track AB 856?
- Track AB 856 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on AB 856
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of AB 856
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →