West Virginia 2019 Regular Session Status: Enacted 1 R cosponsors

SB 635 — Relating generally to coal mining activities

Last action — Chapter 170, Acts, Regular Session, 2019

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. ✓
    Passed House of Delegates
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced February 15, 2019. Enacted.

Prognosis

Likely to advance 72% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (1 R).

  • Cleared a recorded vote

    Passed 5 recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

704 added · 749 removed

Plain-language change summary

The revised version of Bill SB 635 removes the requirement for a community impact statement when new coal mining projects are proposed. It also streamlines the application process by eliminating some submission requirements and specifying that the Department of Environmental Protection can now create rules to help protect homes from mine subsidence. These changes could make it easier for mining companies to start new projects while introducing new protections for nearby residents and offering incentives for developing former coal mine sites.

→
Previous
Latest
NEWS RELEASES HELPFUL LINKS Engrossed Version « Senate Bill 635 History OTHER VERSIONS  —  Introduced Version - Originating in Committee  |  Enrolled Version - Final Version  |   |  Email Key:
NEWS RELEASES HELPFUL LINKS Enrolled Version - Final Version « Senate Bill 635 History OTHER VERSIONS  —  Introduced Version - Originating in Committee  |  Engrossed Version  |   |  Email Key:
Red = new code to be enacted WEST virginia legislature regular session Engrossed Senate Bill 635 By Senator Smith [Originating in the Committee on Energy, Industry, and Mining;
Red = new code to be enacted WEST virginia legislature regular session Enrolled Senate Bill 635 By Senator Smith [Passed March 9, 2019;
Reported on February 15, 2019] A BILL to amend and reenact §5B-2A-5, §5B-2A-6, §5B-2A-8, and §5B-2A-9 of the Code of West Virginia, 1931, as amended;
in effect from passage] AN ACT to amend and reenact §5B-2A-5, §5B-2A-6, §5B-2A-8, and §5B-2A-9 of the Code of West Virginia, 1931, as amended;
to amend said code by adding thereto three new sections, designated §11-28-1, §11-28-2, and §11-28-3;
to amend said code by adding thereto two new sections, designated §22A-1-43 and §22A-1-44;
to amend said code by adding thereto a new sections, designated §22A-1-43;
to amend and reenact §22A-2A-405 of said code;
creating a tax credit for post coal mine site development;
adding definitions;
delineating eligibility for tax credit for post coal mine site development;
specifying application of the tax credit for post coal mine site development;
requiring apprentice miners to work 90 days in a mine within sight and sound of a mine foreman or assistant foreman;
requiring apprentice miners to work at least 90 days in a mine within sight and sound of a mine foreman or assistant foreman;
allowing the Director of the Office of Miners’ Health, Safety, and Training to use the employer’s tracking data of the designated daily examiner;
amending standards for controlling and monitoring exhaust gases for diesel-powered underground coal mining equipment;
holding mine owners, the state, and person or entities engaged in rescue operations harmless for injury or death resulting from mine trespass;
allowing certified competent miners to supervise up to two apprentice miners;
holding mine owners, the state, and person or entities engaged in rescue operations harmless for injury or death;
(1) To establish a procedure for developing a community impact statement as provided in section six of this article and to administer the procedure so established;
(1) To establish a procedure for determining the assets that could be developed in and maintained by the community to foster its long-term viability as provided in §5B-2A-8 of this code and to administer the procedure so established;
(2) (1) To establish a procedure for determining the assets that could be developed in and maintained by the community to foster its long-term viability as provided in §5B-2A-8 of this code and to administer the procedure so established;
(2) To establish a procedure for determining the land and infrastructure needs in the general area of the surface mining operations as provided in §5B-2A-9 of this code and to administer the procedure so established;
(3) (2) To establish a procedure for determining the land and infrastructure needs in the general area of the surface mining operations as provided in §5B-2A-9 of this code and to administer the procedure so established;
(3) To establish a procedure to develop action reports and annual updates as provided in §5B-2A-10 of this code and to administer the procedure so established;
(4) (3) To establish a procedure to develop action reports and annual updates as provided in §5B-2A-10 of this code and to administer the procedure so established;
(4) To determine the need for meetings to be held among the various interested parties in the communities impacted by surface mining operations and, when appropriate, to facilitate the meetings;
(5) (4) To determine the need for meetings to be held among the various interested parties in the communities impacted by surface mining operations and, when appropriate, to facilitate the meetings;
(5) To establish a procedure to assist property owners in the sale of their property as provided in §5B-2A-11 of this code and to administer the procedure so established;
(6) (5) To establish a procedure to assist property owners in the sale of their property as provided in §5B-2A-11 of this code and to administer the procedure so established;
(6) In conjunction with the department, to maintain and operate a system to receive and address questions, concerns, and complaints relating to surface mining;
(7) (6) In conjunction with the department, to maintain and operate a system to receive and address questions, concerns, and complaints relating to surface mining;
and (7) On its own initiative or at the request of a community in close proximity to a mining operation, or a mining operation, offer assistance to facilitate the development of economic or community assets.
and (8) (7) On its own initiative or at the request of a community in close proximity to a mining operation, or a mining operation, offer assistance to facilitate the development of economic or community assets.
Community impact statement review.
Community impact review.
(a)(1) The office shall, no less frequently than quarterly, either consult with representatives of the department’s Office of Mining and Reclamation or review the department’s permit application database(s) to determine whether newly proposed surface mines or significant modifications to existing surface mining operations may present opportunities for mine operators to cooperate with local landowners and local governmental officials to mine and reclaim properties so as to develop community assets or secure developable land and infrastructure pursuant to this article.  The operator shall develop a community impact statement, as described in this section, which shall be submitted to the office within sixty days of the filing of a surface mining application pursuant to the provisions of article three, chapter twenty-two of this code.
(a) The office shall, no less frequently than quarterly, either consult with representatives of the department’s Office of Mining and Reclamation or review the department’s permit application database(s) to determine whether newly proposed surface mines or significant modifications to existing surface mining operations may present opportunities for mine operators to cooperate with local landowners and local governmental officials to mine and reclaim properties so as to develop community assets or secure developable land and infrastructure pursuant to this article.
Failure to submit a community impact statement to the office shall be considered a violation under the provisions of section seventeen of said article;
(b) The provisions of this section shall apply to all surface mining permit applications granted after July 1, 2018.
and (2) The operator shall provide copies of the community impact statement to the department’s Office of Mining Reclamation and Office of Explosives and Blasting and to the county commissions, county clerks’ offices and local, county or regional development or redevelopment authorities of the areas to be affected by the surface mining operations.
(b) The community impact statement, where practicable, shall not be a highly technical or legalistic document, but shall be written in a clear and concise manner understandable to all citizens.
The community impact statement shall include the following:
(1) The amount and location of land to be mined or used in the actual mining operations;
(2) The expected duration of the mining operations in each area of the community;
(3) The extent of anticipated mining-related property acquisitions, to the extent that such acquisitions are known or knowable;
(4) The intentions of the surface and mineral owners relative to the acquired property, to the extent that such intentions are known or knowable;
(5) A statement of the post-mining land use for all land within the permit boundary;
(6) The intended blasting plan and the expected time and duration it will affect each community;
(7) Information concerning the extent and nature of valley fills and the watersheds to be affected;
(8) Economic information, such as the number of jobs created and annual coal production resulting from the surface mining operation, the anticipated life of the mining operation and such other information as may be deemed appropriate;
and (9) An acknowledgment of the recommendations of any approved master land use plan that pertains to the land proposed to be mined, including an acknowledgment of the infrastructure components needed to accomplish the designated post-mine land use required by the plan.
(c) Where the operator makes any significant revision to the permit application under section eighteen, article three, chapter twenty-two of this code, which revision substantially affects any of the information provided in subsection (b) of this section, the operator shall revise the affected provisions of its community impact statement and shall submit such revisions as set forth in subsection (a) of this section.
(d) Within thirty days of receipt of a community impact statement pursuant to subdivision (2), subsection (a) of this section or a revised community impact statement pursuant to subsection (c) of this section, the local, county or regional development or redevelopment authorities of the areas to be affected by the surface mining operations shall provide a written acknowledgment of the receipt of this community impact statement or revised community impact statement to the department’s Division of Mining Reclamation, to the county commission or county commissions and to the office.
Show all 228 changed rows (188 more)
Previous
Latest
(e) (b) The provisions of this section shall apply as follows:
to all surface mining permit applications granted after July 1, 2018.
(1) To all surface mining permits granted after June 11, 1999;
and (2) At the first renewal date of all previously issued permits:
Provided, That the permittee shall be afforded ninety days from said date to comply with the provisions of this section.
(c) The operator shall be required to prepare and submit to the office the information set forth in this subsection as follows:
(c) In determining the nature and extent of the needed community assets, the office shall consider at least the following:
(1) A map of the area for which a permit under article three, chapter twenty-two of this code is being sought or has been obtained;
(2) The names of the surface and mineral owners of the property to be mined pursuant to the permit;
and (3) A statement of the post-mining land use for all land which may be affected by the mining operations.
(d) (c) In determining the nature and extent of the needed community assets, the office shall consider at least the following:
(a) The office shall determine the land and infrastructure needs in the general area of the surface mining operations.
(a) The office shall determine the land and infrastructure needs in the general area of the surface mining operations for which it makes the determination authorized in §5B-2A-6 of this code.
for which it makes the determination authorized in §5B-2A-6 of this code.
(i) The property use is compatible with adjacent land uses;
(A) The property use is compatible with adjacent land uses;
(ii) the use satisfies the relevant county or development or redevelopment authority’s anticipated need and market use;
(B) The use satisfies the relevant county or development or redevelopment authority’s anticipated need and market use;
(iii) the property has in place necessary infrastructure components needed to achieve the anticipated use;
(C) The property has in place necessary infrastructure components needed to achieve the anticipated use;
(iv) the use is supported by all other appropriate public agencies;
(D) The use is supported by all other appropriate public agencies;
(v) the property is eligible for bond release in accordance with section twenty-three, article three, chapter twenty-two of this code;
(E) The property is eligible for bond release in accordance with §22-3-23 of this code;
and (vi) the use is feasible.
and (F) The use is feasible.
Required infrastructure component standards require approval of the relevant county commission, commissions or other county governing body before such standards are accepted.
County commission or other county governing body approval may be rendered only after a reasonable public comment period;
(A)  The property use is compatible with adjacent land uses;
(B)  The use satisfies the relevant county or development or redevelopment authority’s anticipated need and market use;
(C)  The property has in place necessary infrastructure components needed to achieve the anticipated use;
(D)  The use is supported by all other appropriate public agencies;
(E)  The property is eligible for bond release in accordance with §22-3-23 of this code;
and (F)  The use is feasible.
(5) The provisions of this subsection shall not take effect until legislative rules are promulgated pursuant to paragraph (C), subdivision (1), subsection (c), section twenty-three, article three, chapter twenty-two of this code governing bond releases which assure sound future maintenance by the local or regional economic development, redevelopment, or planning agencies.
(5) The provisions of this subsection shall not take effect until legislative rules are promulgated pursuant to this code governing bond releases which assure sound future maintenance by the local or regional economic development, redevelopment, or planning agencies.
Chapter 11.
Taxation.
ARTICLE 28.
Post-Coal minE Site Business Credit.
§11-28-1.
Definitions.
For purposes of this article:
“Business entity” or “person” means an individual, firm, sole proprietorship, partnership, corporation, association, or other entity entitled to a post-coal mine site business credit.
“Coal mining operation” means the business of developing, producing, preparing, or loading bituminous coal, subbituminous coal, anthracite, or lignite.
“Post-coal mine site” means property that has remained undeveloped for business purposes, subsequent to coal mining operations on the property within the bonded area of the last issued coal mine permit.
“Principal place of business” means the physical location from which the entity’s direction, control, and coordination of the operations of the business are primarily exercised, with consideration given, but not limited to:
(1) The physical location at which the primary executive and administrative headquarters of the entity is located;
and (2) From which the management of overall operations of the entity is directed.
“Undeveloped for business purposes” means land has been previously used for coal mining operations and has not been built or developed for use for other activities in the commercial or manufacturing sectors of the economy.
§11-28-2.
Eligibility for credit.
For those tax years beginning on or after January 1, 2020, a business entity will be allowed a credit against certain taxes imposed by this chapter, as described in §11-28-3 of this code, if the business entity meets the following requirements:
(1) The entity is a corporation, small business corporation, limited liability company, partnership, or unincorporated business entity as defined in this code that also has a principal place of business in the state;
(2) The entity employs at the post-coal mine site a minimum of 10 full-time (32 hours a week or more) employees;
and (3) The entity’s principal place of business is located on a post-coal mine site within this state.
§11-28-3.
Application of credit.
(a) Amount of credit.
— For those tax years beginning on or after January 1, 2020, an eligible business entity will be allowed a tax credit in the amount of 50 percent of that entity’s capital expenditures (as defined in Section 263 of the United States Internal Revenue Code of 1986, as amended) at the post-coal mine site for the first five taxable years during which the entity’s principal place of business is located on the post-coal mine site within this state.
The dollar amount of the credit claimed by an eligible business entity may not exceed the amount of 50 percent of the entity’s state income tax for a single year.
(b) Application of annual credit allowance.
— The credit created by this article is allowed as a credit against the taxpayer’s state tax liability applied as provided in subdivisions (1) and (2) of this subsection, and in that order.
(1) Corporation net income taxes.
— Any credit is first applied to reduce the taxes imposed by §11-24-1 et seq.
of this code for the taxable year.
(2) Personal income taxes.
— After application of §11-28-3(b)(1) of this code, any unused credit is next applied as follows:
(A) If the person making the qualified investment is an electing small business corporation (as defined in Section 1361 of the United States Internal Revenue Code of 1986, as amended), a partnership or a limited liability company that is treated as a partnership for federal income tax purposes, then any unused credit (after application of §11-28-3(b)(1) of this code) is allowed as a credit against the taxes imposed by §11-21-1 et seq.
of this code on the income from business or other activity subject to tax under §11-23-1 et seq.
of this code.
(B) Electing small business corporations, limited liability companies, partnerships, and other unincorporated organizations shall allocate the credit allowed by this article among its members in the same manner as profits and losses are allocated for the taxable year.
(3) A credit is not allowed under this section against any employer withholding taxes imposed by §11-21-1 et seq.
of this code.
(c) Unused credit.
— A carryback to a prior taxable year is not allowed for the amount of any unused portion of any annual credit allowance.
If the amount of the allowable credit exceeds the taxpayer’s tax liability for the taxable year, the amount which exceeds the tax liability may be carried over and applied as a credit against the tax liability of the taxpayer pursuant to §11-21-1 et seq.
or §11-24-1 et seq.
of this code for each of the next 10 taxable years following the year of creation of the tax credit unless sooner used.
(d) Eligibility requirements.
— Those businesses that benefit from other state economic development programs or incentives that result in a reduction of their income tax liability due shall not be eligible for this tax credit.
(e) Rule-making authority.
— The State Tax Division shall promulgate emergency rules pursuant to the provisions of §29A-3-15 of this code.
These rules shall include, at a minimum, forms for use in claiming the credit authorized in this article, administration of the credit authorized in this article, and any other matter seen necessary by the State Tax Division for the administration of this article.
(5) Design, locate, construct, operate, maintain, enlarge, modify, and remove or abandon, in accordance with the standards and criteria developed pursuant to §22-3-13 of this article code, all existing and new coal mine waste piles consisting of mine wastes, tailings, coal processing wastes, and solid wastes and used either temporarily or permanently as dams or embankments;
(5) Design, locate, construct, operate, maintain, enlarge, modify, and remove or abandon, in accordance with the standards and criteria developed pursuant to §22-3-13 of this code, all existing and new coal mine waste piles consisting of mine wastes, tailings, coal processing wastes, and solid wastes and used either temporarily or permanently as dams or embankments;
(6) Establish on regraded areas and all other disturbed areas a diverse and permanent vegetative cover capable of self-regeneration and plant succession and at least equal in extent of cover to the natural vegetation of the area within the time period prescribed in §22-3-13(b)(20) of this article code;
(6) Establish on regraded areas and all other disturbed areas a diverse and permanent vegetative cover capable of self-regeneration and plant succession and at least equal in extent of cover to the natural vegetation of the area within the time period prescribed in §22-3-13(b)(20) of this code;
(e) The secretary shall promulgate for review and consideration by the West Virginia Legislature during the regular session of the Legislature, 2020, revisions to legislative rules (38 CSR 2) pertaining to surface owner protection from material damage due to subsidence under this article.  The secretary shall specifically consider adoption of the federal standards codified at 30 C.F.R.
(e) The secretary shall promulgate for review and consideration by the West Virginia Legislature during the regular session of the Legislature, 2020, revisions to legislative rules (38 CSR 2) pertaining to surface owner protection from material damage due to subsidence under this article.
The secretary shall specifically consider adoption of the federal standards codified at 30 C.F.R.
of this code, to establish a schedule of permit fees to be assessed annually upon each person holding a state water pollution control permit or national pollutant discharge elimination system permit issued pursuant to this article except for permits held by surface coal mining operations as defined in §22-3-1 et seq.
of this code to establish a schedule of permit fees to be assessed annually upon each person holding a state water pollution control permit or national pollutant discharge elimination system permit issued pursuant to this article except for permits held by surface coal mining operations as defined in §22-3-1 et seq.
of this chapter code.
of this code.
Provided, That no person holding a permit for a home aerator of six hundred 600 gallons and under shall be required to pay an annual permit fee.
Provided, That no person holding a permit for a home aerator of 600 gallons and under shall be required to pay an annual permit fee.
The secretary may declare any permit issued pursuant to this article void when the annual permit fee is more than ninety days past due pursuant to the rules promulgated under this section.
The secretary may declare any permit issued pursuant to this article void when the annual permit fee is more than 90 days past due pursuant to the rules promulgated under this section.
Five hundred dollars $500 for the fiscal year beginning on July 1, 2002, and $1,000 for each fiscal year thereafter.  For all other categories of permitting actions pursuant to this article related to surface coal mining operations, the secretary shall propose for promulgation legislative rules in accordance with the provisions of §29A-1-1 et seq.
$500 for the fiscal year beginning on July 1, 2002, and $1,000 for each fiscal year thereafter.
For all other categories of permitting actions pursuant to this article related to surface coal mining operations, the secretary shall propose for promulgation legislative rules in accordance with the provisions of §29A-1-1 et seq.
THe Aboveground Storage Tank Act.
The Aboveground Storage Tank Act.
(1) “Aboveground storage tank” or “tank” or “AST” means a device made to contain an accumulation of more than one thousand three hundred twenty 1,320 gallons of fluids that are liquid at standard temperature and pressure, which is constructed primarily of nonearthen materials, including concrete, steel, plastic, or fiberglass reinforced plastic, which provide structural support, more than ninety percent 90 percent of the capacity of which is above the surface of the ground, and includes all ancillary pipes and dispensing systems up to the first point of isolation.
(1) “Aboveground storage tank” or “tank” or “AST” means a device made to contain an accumulation of more than 1,320 gallons of fluids that are liquid at standard temperature and pressure, which is constructed primarily of nonearthen materials, including concrete, steel, plastic, or fiberglass reinforced plastic, which provide structural support, more than 90 percent of the capacity of which is above the surface of the ground, and includes all ancillary pipes and dispensing systems up to the first point of isolation.
The term includes stationary devices which are permanently affixed, and mobile devices which remain in one location on a continuous basis for three hundred sixty-five 365 or more days.
The term includes stationary devices which are permanently affixed, and mobile devices which remain in one location on a continuous basis for 365 or more days.
§§20101-2015, as amended, including, but not limited to, federal regulations promulgated thereunder at 49 C.
§20101-2015, as amended, including, but not limited to, federal regulations promulgated thereunder at 49 C.
Parts §§172, 173, or 174;
§§172, 173, or 174;
1, et seq.
1 et seq.
or subject to other federal law governing the transportation of hazardous materials.;
or subject to other federal law governing the transportation of hazardous materials;
(G) Except when located in a zone of critical concern, a device located on a farm, the contents of which are used exclusively for farm purposes and not for commercial distribution.;
(G) Except when located in a zone of critical concern, a device located on a farm, the contents of which are used exclusively for farm purposes and not for commercial distribution;
(M) Devices having a capacity of two hundred ten barrels or less, containing brine water or other fluids produced in connection with hydrocarbon production activities, that are not located in a zone of critical concern;
(M) Devices having a capacity of 210 barrels or less, containing brine water or other fluids produced in connection with hydrocarbon production activities, that are not located in a zone of critical concern;
(A) Any water supply or system which regularly supplies or offers to supply water for human consumption through pipes or other constructed conveyances, if serving at least an average of twenty-five 25 individuals per day for at least sixty 60 days per year, or which has at least fifteen 15 service connections, and shall include:
(A) Any water supply or system which regularly supplies or offers to supply water for human consumption through pipes or other constructed conveyances, if serving at least an average of 25 individuals per day for at least 60 days per year, or which has at least 15 service connections, and shall include:
(13) “Regulated level 1 aboveground storage tank” or “level regulated tank” means:
(13) “Regulated level 1 aboveground storage tank” or “level 1 regulated tank” means:
(14) “Regulated level 2 aboveground storage tank” or “level regulated tank” means an AST that is located within a zone of peripheral concern that is not a level 1 regulated tank.
(14) “Regulated level 2 aboveground storage tank” or “level 2 regulated tank” means an AST that is located within a zone of peripheral concern that is not a level 1 regulated tank.
Earthen dikes and similar containment structures must be designed and constructed to contain, for a minimum of seventy-two 72 hours, fluid that escapes from a tank.
Earthen dikes and similar containment structures must be designed and constructed to contain, for a minimum of 72 hours, fluid that escapes from a tank.
(19) “Source water protection area” for a public groundwater supply source is the area within an aquifer that supplies water to a public water supply well within a five-year time of travel, and is determined by the mathematical calculation of the locations from which a drop of water placed at the edge of the protection area would theoretically take five years to reach the well.
(19) “Source water protection area” for a public groundwater supply source is the area within an aquifer that supplies water to a public water supply well within a five-year time of travel and is determined by the mathematical calculation of the locations from which a drop of water placed at the edge of the protection area would theoretically take five years to reach the well.
The width of the zone of critical concern is one thousand 1,000 feet measured horizontally from each bank of the principal stream and five hundred 500 feet measured horizontally from each bank of the tributaries draining into the principal stream.
The width of the zone of critical concern is 1,000 feet measured horizontally from each bank of the principal stream and 500 feet measured horizontally from each bank of the tributaries draining into the principal stream.
The length of the zone of peripheral concern is based on an additional five-hour time of travel of water in the streams beyond the perimeter of the zone of critical concern, which creates a protection zone of ten 10 hours above the water intake.
The length of the zone of peripheral concern is based on an additional five-hour time of travel of water in the streams beyond the perimeter of the zone of critical concern, which creates a protection zone of 10 hours above the water intake.
The width of the zone of peripheral concern is one thousand 1,000 feet measured horizontally from each bank of the principal stream and five hundred 500 feet measured horizontally from each bank of the tributaries draining into the principal stream.
The width of the zone of peripheral concern is 1,000 feet measured horizontally from each bank of the principal stream and 500 feet measured horizontally from each bank of the tributaries draining into the principal stream.
(3) Any miner who knowingly violates any health or safety provision of this chapter or health or safety rule promulgated pursuant to this chapter is subject to a civil penalty assessed by the director under subdivision (4) of this subsection which shall not be more than $250 for each occurrence of the violation.  Any miner issued a violation under this subsection shall either appeal the violation or pay the civil penalty within 30 days after receipt of the violation.  Any violation not appealed or paid within days shall become delinquent.
(3) Any miner who knowingly violates any health or safety provision of this chapter or health or safety rule promulgated pursuant to this chapter is subject to a civil penalty assessed by the director under subdivision (4) of this subsection which shall not be more than $250 for each occurrence of the violation.
Any miner issued a violation under this subsection shall either appeal the violation or pay the civil penalty within 30 days after receipt of the violation.
Any violation not appealed or paid within 30 days shall become delinquent.
(b) (1) Any operator who knowingly violates a health or safety provision of this chapter or health or safety rule promulgated pursuant to this chapter, or knowingly violates or fails or refuses to comply with any order issued under §22A-1-15 of this article code, or any order incorporated in a final decision issued under this article, except an order incorporated in a decision under §22A-1-22(a) or §22A-1-22(b) of this article code, shall be assessed a civil penalty by the director under subdivision (5), subsection (a) of this section of not more than $5,000 and for a second or subsequent violation assessed a civil penalty of not more than $10,000, unless the director determines that it is appropriate to impose a special assessment for the violation, pursuant to the provisions of subdivision (2) of this subsection.
(b) (1) Any operator who knowingly violates a health or safety provision of this chapter or health or safety rule promulgated pursuant to this chapter, or knowingly violates or fails or refuses to comply with any order issued under §22A-1-15 of this code, or any order incorporated in a final decision issued under this article, except an order incorporated in a decision under §22A-1-22(a) or §22A-1-22(b) of this code, shall be assessed a civil penalty by the director under subdivision (5), subsection (a) of this section of not more than $5,000 and for a second or subsequent violation assessed a civil penalty of not more than $10,000, unless the director determines that it is appropriate to impose a special assessment for the violation, pursuant to the provisions of subdivision (2) of this subsection.
(c) Whenever a corporate operator knowingly violates a health or safety provision of this chapter or health or safety rules promulgated pursuant to this chapter, or knowingly violates or fails or refuses to comply with any order issued under this law or any order incorporated in a final decision issued under this law, except an order incorporated in a decision issued under §22A-1-22(a) or §22A-1-22(b) of this article code, any director, officer, or agent of the corporation who knowingly authorized, ordered or carried out the violation, failure or refusal is subject to the same civil penalties that may be imposed upon a person under subsections (a) and (b) of this section.
(c) Whenever a corporate operator knowingly violates a health or safety provision of this chapter or health or safety rules promulgated pursuant to this chapter, or knowingly violates or fails or refuses to comply with any order issued under this law or any order incorporated in a final decision issued under this law, except an order incorporated in a decision issued under §22A-1-22(a) or §22A-1-22(b) of this code, any director, officer, or agent of the corporation who knowingly authorized, ordered or carried out the violation, failure or refusal is subject to the same civil penalties that may be imposed upon a person under subsections (a) and (b) of this section.
(f) Any person who willfully violates any safety standard pursuant to this chapter or a rule promulgated thereunder that causes a fatality or who willfully orders or carries out such violation that causes a fatality is guilty of a felony and, upon conviction thereof, shall be fined not more than $10,000 or confined in a state correctional facility not less than one year and not more than five years, or both fined and imprisoned confined.
(f) Any person who willfully violates any safety standard pursuant to this chapter or a rule promulgated thereunder that causes a fatality or who willfully orders or carries out such violation that causes a fatality is guilty of a felony and, upon conviction thereof, shall be fined not more than $10,000 or confined in a state correctional facility not less than one year and not more than five years, or both fined and confined.
(a)  The operator shall provide mine rescue coverage at each active underground mine.
(a) The operator shall provide mine rescue coverage at each active underground mine.
(3) A West Virginia Office of Miners’ Health, Safety, and Training Mine Rescue Team may shall serve as a second or backup team for mines within the state and qualify as one of the two teams required under subdivision (1) of this subsection and in accordance with 30 CFR, Part 49.20(4) for all mines with no backup team available within a one-hour drive to the mine.
(3) A West Virginia Office of Miners’ Health, Safety, and Training Mine Rescue Team shall serve as a second or backup team for mines within the state and qualify as one of the two teams required under subdivision (1) of this subsection and in accordance with 30 CFR, Part 49.20(4) for all mines with no backup team available within a one-hour drive to the mine.
The operator shall contact the office and obtain the state’s agreement to serve as a backup team in the form of a written notification signed by the director and this notification shall be kept posted at the mine notify them of the need for mine rescue services beginning July 1, 2019.
The operator shall contact the office and notify them of the need for mine rescue services beginning July 1, 2019.
To ensure adequate rescue coverage for all underground mines, no mine rescue station may provide coverage for more than seventy 70 mines within the two-hour ground travel limit as defined in this subsection.
To ensure adequate rescue coverage for all underground mines, no mine rescue station may provide coverage for more than 70 mines within the two-hour ground travel limit as defined in this subsection.
(i) Upon completion of the initial training, all mine rescue team members shall receive at least forty 40 hours of refresher training annually.
(i) Upon completion of the initial training, all mine rescue team members shall receive at least 40 hours of refresher training annually.
(3)  The mine operator shall provide two-way communication and a lifeline or its equivalent at each fresh air base for all mine rescue or recovery teams and no mine rescue team member shall advance more than 1,000 feet inby the fresh air base:
(3) The mine operator shall provide two-way communication and a lifeline or its equivalent at each fresh air base for all mine rescue or recovery teams and no mine rescue team member shall advance more than 1,000 feet inby the fresh air base:
Provided, however, That the mine operator shall provide a lifeline or its equivalent  in each fresh air base for all mine rescue or recovery teams.
Provided, however, That the mine operator shall provide a lifeline or its equivalent in each fresh air base for all mine rescue or recovery teams.
(4) A rescue or recovery team shall immediately return to the fresh air base when the atmospheric pressure of any member’s breathing apparatus depletes to sixty 60 atmospheres, or its equivalent.
(4) A rescue or recovery team shall immediately return to the fresh air base when the atmospheric pressure of any member’s breathing apparatus depletes to 60 atmospheres, or its equivalent.
The communication system shall be at least one thousand 1,000 feet in length;
The communication system shall be at least 1,000 feet in length;
A person trained in the use and care of breathing apparatuses shall inspect and test the apparatuses at intervals not exceeding thirty 30 days and shall certify by signature and date that the inspections and tests were done.
A person trained in the use and care of breathing apparatuses shall inspect and test the apparatuses at intervals not exceeding 30 days and shall certify by signature and date that the inspections and tests were done.
(o) When an authorized representative finds a violation of any of the mine rescue requirements, the representative shall take appropriate corrective action in accordance with §22A-1-15 of this article code.
(o) When an authorized representative finds a violation of any of the mine rescue requirements, the representative shall take appropriate corrective action in accordance with §22A-1-15 of this code.
The operators shall have twenty-four hours to submit to the director a revised mine rescue program.
The operators shall have 24 hours to submit to the director a revised mine rescue program.
(q) Every operator of an underground mine shall develop and adopt a mine rescue program for submission to the director within thirty 30 days of the effective date of this statute:
(q) Every operator of an underground mine shall develop and adopt a mine rescue program for submission to the director within 30 days of the effective date of this statute:
(a) If any injury or death shall occur to any person who has entered any mine, whether active workings or abandoned workings, without permission, neither:
(a) If any injury or death shall occur to any person who has entered any mine, whether active workings, inactive workings, or abandoned workings, without permission, neither:
In the event of an unauthorized entry by any person or persons into any mine whether active workings or abandoned workings, neither the owner of that mine or property, nor any other person, organization, or entity involved in any rescue or attempted rescue of such person, may be held liable for any violation of any environmental regulation, if such violation occurred as part of any rescue efforts.
In the event of an unauthorized entry by any person or persons into any mine whether active workings, inactive workings, or abandoned workings, neither the owner of that mine or property, nor any other person, organization, or entity involved in any rescue or attempted rescue of such person, may be held liable for any violation of any environmental regulation, if such violation occurred as part of any rescue efforts.
 (a) Every employer of certified persons, as defined in §22A-1-2 of this chapter code, shall implement a substance abuse screening policy and program that shall, at a minimum, include:
 (a) Every employer of certified persons, as defined in §22A-1-2 of this code, shall implement a substance abuse screening policy and program that shall, at a minimum, include:
(1) A preemployment, ten 10-panel urine test for the following and any other substances as set out in rules adopted by the Office of Miners’ Health, Safety, and Training:
(1) A preemployment, 10-panel urine test for the following and any other substances as set out in rules adopted by the Office of Miners’ Health, Safety, and Training:
(c)  Any employee involved in an accident that results in physical injuries or damage to equipment or property may be subject to a drug test by his or her employer.
(c) Any employee involved in an accident that results in physical injuries or damage to equipment or property may be subject to a drug test by his or her employer.
(c) (d) (1) Every employer shall notify the director, on a form prescribed by the director, within seven days of any of the following:
(d) (1) Every employer shall notify the director, on a form prescribed by the director, within seven days of any of the following:
(A) A Any positive drug or alcohol test of a certified person., whether it be a preemployment test, random test, reasonable suspicion test or post-accident test.
(A) Any positive drug or alcohol test of a certified person.
(A) A Any positive drug or alcohol test of a certified person, whether it be a preemployment test, random test, reasonable suspicion test or post-accident test.
(A) Any positive drug or alcohol test of a certified person.
(4) Notice shall result in the immediate temporary suspension of all certificates held by the certified person who failed the screening, pending a hearing before the board of appeals pursuant to §22A-1-2 of this article code.
(4) Notice shall result in the immediate temporary suspension of all certificates held by the certified person who failed the screening, pending a hearing before the board of appeals pursuant to §22A-1-2 of this code.
(d) (e) Suspension or revocation of a certified person’s certificate as a miner or other miner specialty in another jurisdiction by the applicable regulatory or licensing authority for substance abuse-related matters shall result in the director’s immediately and temporarily suspending the certified person’s West Virginia certificate until such time as the certified person’s certification is reinstated in the other jurisdiction.
(e) Suspension or revocation of a certified person’s certificate as a miner or other miner specialty in another jurisdiction by the applicable regulatory or licensing authority for substance abuse-related matters shall result in the director’s immediately and temporarily suspending the certified person’s West Virginia certificate until such time as the certified person’s certification is reinstated in the other jurisdiction.
(e) (f) The provisions of this article shall not be construed to preclude an employer from developing or maintaining a drug and alcohol abuse policy, testing program, or substance abuse program that exceeds the minimum requirements set forth in this section.
(f) The provisions of this article shall not be construed to preclude an employer from developing or maintaining a drug and alcohol abuse policy, testing program, or substance abuse program that exceeds the minimum requirements set forth in this section.
(a) Any hearing conducted after the temporary suspension of a certified person’s certificate pursuant to this article, shall be conducted within sixty 60 days of the temporary suspension.
(a) Any hearing conducted after the temporary suspension of a certified person’s certificate pursuant to this article shall be conducted within 60 days of the temporary suspension.
The Board of Appeals shall make every effort to hold the hearing within forty 40 days of the temporary suspension.
The Board of Appeals shall make every effort to hold the hearing within 40 days of the temporary suspension.
(b) All hearings of the Board of Appeals pursuant to this section shall be conducted in accordance with the provisions of §22A-1-31 of this chapter code.  In addition to the rules and procedures in §22A-1-31 of this chapter code in hearings under this section, the Board of Appeals may accept as evidence a notarized affidavit of drug testing procedures and results from a Medical Review Officer (MRO) in lieu of live testimony by the MRO.  If the Board of Appeals desires testimony in lieu of a notarized affidavit, the MRO may testify under oath telephonically or by an Internet-based program in lieu of physically attending the hearing.  The Board of Appeals may suspend the certificate or certificates of a certified person for violation of this article or for any other violation of this chapter pertaining to substance abuse.
(b) All hearings of the Board of Appeals pursuant to this section shall be conducted in accordance with the provisions of §22A-1-31 of this code.
In addition to the rules and procedures in §22A-1-31 of this code in hearings under this section, the Board of Appeals may accept as evidence a notarized affidavit of drug testing procedures and results from a Medical Review Officer (MRO) in lieu of live testimony by the MRO.
If the Board of Appeals desires testimony in lieu of a notarized affidavit, the MRO may testify under oath telephonically or by an Internet-based program in lieu of physically attending the hearing.
The Board of Appeals may suspend the certificate or certificates of a certified person for violation of this article or for any other violation of this chapter pertaining to substance abuse.
of this code to establish the disciplinary actions referenced in this section following the receipt of recommendations from the Board of Coal Mine Health and Safety following completion of the study required pursuant to §22A-6-14 of this chapter code.
of this code to establish the disciplinary actions referenced in this section following the receipt of recommendations from the Board of Coal Mine Health and Safety following completion of the study required pursuant to §22A-6-14 of this code.
(c) No person whose certification is suspended or revoked under this section may perform any duties under any other certification issued under this chapter, during the period of the suspension imposed by the Board of Appeals.  For all miners determined to have a positive drug or alcohol test as determined pursuant to the provisions of this article, the board shall suspend the miner’s certification card(s) for a minimum of six months from the date of the drug test.  This six-month minimum suspension shall also apply to miners who enter into a treatment program after testing positive in a drug test administered pursuant to the provisions of this article and are placed under probationary treatment and testing agreements by the board.
(c) No person whose certification is suspended or revoked under this section may perform any duties under any other certification issued under this chapter during the period of the suspension imposed by the Board of Appeals.
For all miners determined to have a positive drug or alcohol test as determined pursuant to the provisions of this article, the board shall suspend the miner’s certification card(s) for a minimum of six months from the date of the drug test.
This six-month minimum suspension shall also apply to miners who enter into a treatment program after testing positive in a drug test administered pursuant to the provisions of this article and are placed under probationary treatment and testing agreements by the board.
 (a) A mine operator shall submit a detailed ventilation plan and any addenda to the director for review and comment.
(a) A mine operator shall give the director a copy of the United States Department of Labor’s Mine Safety and Health Administration (MSHA)-approved plan and any addenda as soon as the operator receives the approval from MSHA.
The mine operator shall review the plan with the director and address concerns to the extent practicable.
The operator shall deliver to the miners’ representative employed by the operator at the mine, if any, a copy of the operator’s proposed annual ventilation plan at least 10 days prior to the date of submission.
The miners’ representative, if any, shall be afforded the opportunity to submit written comments to the operator prior to such submission;
in addition, the miners’ representative, if any, may submit written comments to the director.
The director shall submit any concern that is not addressed to the United States Department of Labor - Mine Safety and Health Administration (MSHA) through comments to the plan.
The mine operator shall provide a copy of the plan to the director 10 days prior to the submittal of the plan to MSHA.
Provided, That the MSHA-approved plan shall comply with all provisions of state mining law as set forth in state code or code of state rules.
Provided, That the MSHA-approved plan shall comply with all provisions of state mining law as set forth in this code or state rules.
 (b) (a) The A mine operator shall give the director a copy of the MSHA United States Department of Labor’s Mine Safety and Health Administration (MSHA)-approved plan and any addenda as soon as the operator receives the approval from MSHA.  The MSHA-approved plan shall serve as the state-approved plan:  Provided, That the MSHA-approved plan shall comply with all provisions of state mining law as set forth in this code or state rules.
(b) In the event of an unforeseen situation requiring immediate action on a plan revision, the operator shall submit the proposed revision to the director and the miners’ representative, if any, employed by the operator at the mine when the proposed revision is submitted to MSHA.
(c) (b) In the event of an unforeseen situation requiring immediate action on a plan revision, the operator shall submit the proposed revision to the director and the miners’ representative, if any, employed by the operator at the mine when the proposed revision is submitted to MSHA.
(d) (c) Upon approval by MSHA, the plan is enforceable by the director.
(c) Upon approval by MSHA, the plan is enforceable by the director.
 (a) The Office of Miners’ Health, Safety, and Training shall prescribe and establish a course of instruction in mine safety and particularly in dangers incident to employment in mines and in mining laws and rules, which course of instruction shall be successfully completed within twelve weeks after any person is first employed as a miner.
 (a) The Office of Miners’ Health, Safety, and Training shall prescribe and establish a course of instruction in mine safety and particularly in dangers incident to employment in mines and in mining laws and rules, which course of instruction shall be successfully completed within 12 weeks after any person is first employed as a miner.
In addition to other enforcement actions available to the director, upon a finding by the director of the existence of a pattern of conduct creating a hazardous condition at a mine, the director shall notify the Board of Miners’ Training, Education and Certification Board of Coal Mine Health and Safety, which shall cause additional training to occur at the mine addressing such safety issue or issues identified by the director, pursuant to §22A-7-1 et seq.
In addition to other enforcement actions available to the director, upon a finding by the director of the existence of a pattern of conduct creating a hazardous condition at a mine, the director shall notify the Board of Coal Mine Health and Safety, which shall cause additional training to occur at the mine addressing such safety issue or issues identified by the director, pursuant to §22A-7-1 et seq.
of this chapter code.  The Office of Miners’ Health, Safety, and Training is authorized to promulgate emergency and legislative rules establishing a course of instruction.
of this code.
The Director of the Office of Miners’ Health, Safety, and Training is authorized to promulgate emergency and legislative rules in consultation with the Board of Coal Mine Health and Safety establishing a course of instruction.
It is the duty of every mine operator who employs apprentices, as that term is used in §22A-8-3 and §22A-8-4 of this chapter code to ensure that the apprentices are effectively supervised with regard to safety practices and to instruct apprentices in safe mining practices.
It is the duty of every mine operator who employs apprentices, as that term is used in §22A-8-3 and §22A-8-4 of this code to ensure that the apprentices are effectively supervised with regard to safety practices and to instruct apprentices in safe mining practices.
During the first one hundred twenty 90 days of employment in a mine, the apprentice shall work within sight and sound of the mine foreman, assistant mine foreman, or an experienced miner, and in a location that the mine foreman, assistant mine foreman, or experienced miner can effectively respond to cries for help of the apprentice.
During the first 120 days of employment in a mine, the apprentice shall work within sight and sound of the mine foreman, assistant mine foreman, or an experienced miner, and in a location that the mine foreman, assistant mine foreman, or experienced miner can effectively respond to cries for help of the apprentice:
Provided, That if the apprentice has completed an approved training program as approved by the Board of Coal Mine Health and Safety, this period may be reduced by an amount not to exceed 30 days.
of this chapter code or any regulation or any plan or agreement promulgated or entered into thereunder shall arrange for the prompt correction thereof.
of this code or any regulation or any plan or agreement promulgated or entered into thereunder shall arrange for the prompt correction thereof.
Should the mine foreman or his or her assistants find a place to be in a dangerous condition, they shall not leave the place until it is made safe, or shall remove the persons working therein until the place is made safe by some competent person designated for that purpose.
Should the mine foreman or his or her assistants find a place to be in a dangerous condition, they shall not leave the place until it is made safe or shall remove the persons working therein until the place is made safe by some competent person designated for that purpose.
            Notwithstanding any other law to the contrary, the director may use any data collected from a tracking device as evidence that a person designated to perform daily examinations under this section neglected or failed to perform a duty mandated by this section under §22A-1-31 of this code and may decertify any miner who is found to have failed to perform his or her duties.
Article 2A.
Use of Diesel-Powered Equipment in Underground Coal Mines.
§22A-2A-405.
Exhaust gas monitoring and control.
 (a) For monitoring and controlling exhaust gases, the director shall establish the maximum allowable ambient concentration of exhaust gases in the mine atmosphere.
Standards for exhaust gases, stated in parts per million, shall be established for carbon monoxide and oxides of nitrogen.
The rules shall establish the location in the mine at which the concentration of these exhaust gases is to be measured, the frequency at which measurements are to be made, and requirements prescribing the sampling instruments to be used in the measurement of exhaust gases:
Provided, That the measurement of nitrogen oxide shall not be required for any operator in the state unless the measurement of ambient concentrations is required for those miners working within sight and sound of the equipment.
(b) The director shall establish the concentration of exhaust gas, stated as a percentage of an exposure limit, that when present will require changes to be made in the use of diesel-powered equipment or the methods of mine ventilation, or will require other modifications in the mining process.
(c) The director shall provide for the remedial action to be taken if the concentration of any of the gases listed in subsection (a) of this section exceeds the exposure limit.
(d) In addition to the other maintenance requirements required by this article, the director shall establish requirements provide for service, maintenance and tests which are specific to an engine’s fuel delivery system, timing, or exhaust emissions control and conditioning system.
Any miner holding a certificate of competency and qualification may have one two persons working with him or her, and under his or her supervision and direction, as an apprentice, for the purpose of learning and being instructed in the duties and calling of mining.
Any miner holding a certificate of competency and qualification may have one person working with him or her, and under his or her supervision and direction, as an apprentice, for the purpose of learning and being instructed in the duties and calling of mining.
Provided, That a mine foreman, assistant mine foreman, or fire boss supervising apprentices in an area where no coal is being produced or which is outby the working section may have as many as five apprentices under his or her supervision and direction, as apprentices, for the purpose of learning and being instructed in the duties and calling of mining or where the operator is using a production section under program for training of apprentice miners, approved by the Board of Miner Training, Education and Certification Board of Coal Mine Health and Safety.
Provided, That a mine foreman, assistant mine foreman, or fire boss supervising apprentices in an area where no coal is being produced or which is outby the working section may have as many as five apprentices under his or her supervision and direction, as apprentices, for the purpose of learning and being instructed in the duties and calling of mining or where the operator is using a production section under program for training of apprentice miners, approved by the Board of Coal Mine Health and Safety.
If any person shall, at any time, break and enter, or shall enter without breaking, any office, shop, underground coal mine, storehouse, warehouse, banking house, or any house or building, other than a dwelling house or outhouse adjoining thereto or occupied therewith, any railroad or traction car, propelled by steam, electricity or otherwise, any steamboat or other boat or vessel, or any commercial, industrial or public utility property enclosed by a fence, wall, or other structure erected with the intent of the property owner of protecting or securing the area within and its contents from unauthorized persons, within the jurisdiction of any county in this state, with intent to commit a felony or any larceny, he or she shall be deemed guilty of a felony and, upon conviction, shall be confined in a state correctional facility not less than one nor more than 10 years.
If any person shall, at any time, break and enter, or shall enter without breaking, any office, shop, storehouse, warehouse, banking house, or any house or building, other than a dwelling house or outhouse adjoining thereto or occupied therewith, any railroad or traction car, propelled by steam, electricity or otherwise, any steamboat or other boat or vessel, or any commercial, industrial or public utility property enclosed by a fence, wall, or other structure erected with the intent of the property owner of protecting or securing the area within and its contents from unauthorized persons, within the jurisdiction of any county in this state, with intent to commit a felony or any larceny, he or she shall be deemed guilty of a felony and, upon conviction, shall be confined in a state correctional facility not less than one nor more than 10 years.
(a) A person who willfully enters an underground coal mine, whether active workings or abandoned workings, without permission, and the underground mine is either:
(a) A person who willfully enters an underground coal mine, whether active workings, inactive workings, or abandoned workings, without permission, is guilty of a felony and, upon conviction thereof shall be imprisoned in a correctional facility not less than one year and nor more than 10 years and shall be fined not less than $5,000 nor more than $10,000:
Provided, That for any conviction pursuant to this subsection, any inactive or abandoned underground workings must be either:
or (2) clearly identified by signage at some conspicuous place near the entrance of the mine that includes a notice that the unauthorized entry into the mine is a felony criminal offense, is guilty of a felony and, upon conviction thereof shall be imprisoned in a correctional facility not less than one year and nor more than 10 years and shall be fined not less than $5,000 nor more than $10,000.
or (2) clearly identified by signage at some conspicuous place near the entrance of the mine that includes a notice that the unauthorized entry into the mine is a felony criminal offense.
(b) A person who willfully enters a surface coal mine, whether active workings or abandoned workings, without permission, and with the intent to commit a felony or any larceny, is guilty of a misdemeanor and, upon conviction thereof, shall be confined in jail not less than one week and not more than one month and shall be fined not less than $1,000 nor more than $5,000.
(b) A person who willfully enters a surface coal mine, whether active workings, inactive workings or abandoned workings, without permission, and with the intent to commit a felony or any larceny, is guilty of a misdemeanor and, upon conviction thereof, shall be confined in jail not less than one week and not more than one month and shall be fined not less than $1,000 nor more than $5,000.
For a second conviction the person shall be guilty of a felony and shall be confined in a correctional facility not less than one year and not more than five years and shall be fined not less than $5,000 nor more than $10,000.
For a second conviction, pursuant to this subsection, the person shall be guilty of a felony and shall be confined in a correctional facility not less than one year and not more than five years and shall be fined not less than $5,000 nor more than $10,000.
For a third or subsequent conviction, the person is guilty of a felony and shall be confined in a correctional facility not less than five year and not more than 10 years and shall be fined not less than $10,000, nor more than $25,000.
For a third or subsequent conviction, pursuant to this subsection, the person shall be guilty of a felony and shall be confined in a correctional facility not less than five years and not more than 10 years and shall be fined not less than $10,000, nor more than $25,000.
 (c) A person who violates subsections (a) or (b) of this section, and during any rescue efforts for any such person, there occurs an injury that causes substantial physical pain, illness, or any impairment of physical condition to any person other than himself or herself, is guilty of a misdemeanor and, upon conviction thereof, shall be confined in jail for not less than one week and not more than one year and shall be fined not less than $1,000 nor more than $5,000:
 (c) If a person violates subsections (a) or (b) of this section, and during any rescue efforts for any such person, there occurs an injury that causes substantial physical pain, illness, or any impairment of physical condition to any person other than himself or herself, then that person is guilty of a misdemeanor and, upon conviction thereof, shall be confined in jail for not less than one week and not more than one year and shall be fined not less than $1,000 nor more than $5,000:
(d) A person who violates subsections (a) or (b) of this section, and during any rescue efforts for any such person, there occurs an injury that creates a substantial risk of death, causes serious or prolonged disfigurement, prolonged impairment of health, or prolonged loss or impairment of the function of any bodily organ to any person other than himself or herself, is guilty of a felony and, upon conviction thereof, shall be imprisoned in a correctional facility for not less than two nor more than 10 years and shall be fined not less than $5,000 nor more than $10,000.
(d) If a person violates subsections (a) or (b) of this section, and during any rescue efforts for any such person, there occurs an injury that creates a substantial risk of death, causes serious or prolonged disfigurement, prolonged impairment of health, or prolonged loss or impairment of the function of any bodily organ to any person other than himself or herself, then that person is guilty of a felony and, upon conviction thereof, shall be imprisoned in a correctional facility for not less than two nor more than 10 years and shall be fined not less than $5,000 nor more than $10,000.
(e) A person who violates subsections (a) or (b) of this section, and during any rescue efforts of such person, the death of any person occurs, is guilty of a felony and, upon conviction thereof, shall be imprisoned in a correctional facility for not less than three nor more than 15 years and shall be fined not less than $10,000 nor more than $25,000.
(e) If a person violates subsections (a) or (b) of this section, and during any rescue efforts of such person, the death of any other person occurs, then that person is guilty of a felony and, upon conviction thereof, shall be imprisoned in a correctional facility for not less than three nor more than 15 years and shall be fined not less than $10,000 nor more than $25,000.
 (g) The terms “mine”, “active workings”, and “abandoned workings” have the same meaning ascribed to such terms as set forth in §22A-1-2 of this code.
 (g) The terms “mine”, “active workings”, “inactive workings”, and “abandoned workings” have the same meaning ascribed to such terms as set forth in §22A-1-2 of this code.
(h) Nothing in this section shall be construed to prevent lawful assembly and petition for the lawful redress of grievances, including, but not limited to, activities protected by the West Virginia Constitution or the United States Constitution or any statute of this state or the United States.
(h) Nothing in this section shall be construed to prevent lawful assembly and petition for the lawful redress of grievances, during any dispute, including, but not limited to, activities protected by the West Virginia Constitution or the United States Constitution or any statute of this state or the United States.
View plain text versions (5)

Action History

  1. Chapter 170, Acts, Regular Session, 2019

  2. Approved by Governor 3/27/19

  3. To Governor 3/20/19

  4. Approved by Governor 3/27/19 - Senate Journal

  5. Approved by Governor 3/27/19 - House Journal

  6. To Governor 3/20/19 - House Journal

  7. To Governor 3/20/19 - Senate Journal

  8. Completed legislative action

  9. Communicated to House

  10. Effective from passage (Roll No. 544)

  11. Senate concurred in House amendments and passed bill (Roll No. 544)

  12. House Message received

  13. Communicated to Senate

  14. Effective from passage (Roll No. 697)

  15. Title amendment adopted (Voice vote)

  16. House concurred in Senate amendment and passed bill (Roll No. 696)

  17. House received Senate message

  18. Senate requests House to concur

  19. Effective from passage (Roll No. 428)

  20. Senate amends House amendment and passed bill (Roll No. 428)

  21. House Message received

  22. Communicated to Senate

  23. Effective from passage (Roll No. 429)

  24. Title amendment adopted (Voice vote)

  25. Passed House (Roll No. 428)

  26. Read 3rd time

  27. On 3rd reading, Special Calendar

  28. Committee amendment adopted (Voice vote)

  29. Read 2nd time

  30. On 2nd reading, Special Calendar

  31. Read 1st time

  32. On 1st reading, Special Calendar

  33. With amendment, do pass

  34. To House Energy

  35. To Energy

  36. Introduced in House

  37. Ordered to House

  38. Effective from passage (Roll No. 188)

  39. Passed Senate with amended title (Roll No. 188)

  40. Read 3rd time

  41. Floor amendments adopted (Voice vote)

  42. On 3rd reading with right to amend

  43. Read 2nd time

  44. Laid over on 2nd reading 2/19/19

  45. On 2nd reading

  46. Read 1st time

  47. On 1st reading

  48. Reported do pass

  49. Originating in Senate Energy, Industry and Mining

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 151 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (151)

151 members have not signed on to this bill.

Show all 151 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

PASSAGE

Passed 98 Yea · 0 Nay · 2 Other
Party YeaNayPresentNot Voting
Republican 22002
Unaffiliated 71000
Democrat 5000
Total 98002
% of votes cast 98%0%0%2%
How each member voted (100)
Member Party Vote
Foster — Yea
Brown, N. — Yea
Brown, S. — Yea
Maynard — Yea
Atkinson — Yea
Bates — Yea
Bibby — Yea
Boggs — Yea
Fleischauer — Yea
Hamrick — Yea
Hanna — Yea
Hardy — Yea
Harshbarger — Yea
Lavender-Bowe — Yea
Linville — Yea
Lovejoy — Yea
Mandt — Yea
Rowan — Yea
Shott — Yea
Sponaugle — Yea
Staggers — Yea
Storch — Yea
Swartzmiller — Yea
Hartman — Yea
Sypolt — Yea
Thompson, C. — Yea
Thompson, R. — Yea
Nelson — Yea
Tomblin — Yea
Walker — Yea
Phillips — Yea
Diserio — Yea
Jeffries, J. — Yea
Evans — Yea
Cadle — Yea
Capito — Yea
Caputo — Yea
Cowles — Yea
Estep-Burton — Yea
Higginbotham — Yea
Hill — Yea
Pack — Yea
Paynter — Yea
Pethtel — Yea
Pyles — Yea
Robinson — Yea
Rodighiero — Yea
Westfall — Yea
Wilson — Yea
Zukoff — Yea
Angelucci — Yea
Byrd — Yea
Canestraro — Yea
Doyle — Yea
Espinosa — Yea
Fast — Yea
Graves — Yea
Hicks — Yea
Hollen — Yea
Householder — Yea
Kessinger — Yea
Kump — Yea
Longstreth — Yea
Malcolm — Yea
Miley — Yea
Porterfield — Yea
Rowe — Yea
Skaff — Yea
Steele — Yea
Summers — Yea
Waxman — Yea
Evan Hansen Democrat Yea
John Williams Democrat Yea
Mike Pushkin Democrat Yea
Sean Hornbuckle Democrat Yea
Shawn Fluharty Democrat Yea
Ben Queen Republican Yea
Betsy Kelly Republican Yea
Betsy Kelly Republican Yea
Carl Martin Republican Yea
Christopher W. Toney Republican Yea
D. Rolland Jennings Republican Yea
Dean Jeffries Republican Yea
Evan Worrell Republican Yea
Gary G. Howell Republican Yea
George Miller Republican Yea
Jason Barrett Republican Yea
Jeff Campbell Republican Yea
Jim Butler Republican Yea
Joe Ellington Republican Not Voting
John Paul Hott Republican Yea
Mark Dean Republican Yea
Matthew Rohrbach Republican Yea
Mike Azinger Republican Yea
Pat McGeehan Republican Yea
Patrick Martin Republican Yea
Roger Hanshaw Republican Yea
Roy Cooper Republican Not Voting
Vernon Criss Republican Yea
William Anderson Republican Yea

Official roll call →

EFFECT FROM PASSAGE

Passed 98 Yea · 0 Nay · 2 Other
Party YeaNayPresentNot Voting
Republican 22002
Unaffiliated 71000
Democrat 5000
Total 98002
% of votes cast 98%0%0%2%
How each member voted (100)
Member Party Vote
Atkinson — Yea
Fast — Yea
Kump — Yea
Linville — Yea
Rowan — Yea
Shott — Yea
Foster — Yea
Brown, N. — Yea
Brown, S. — Yea
Maynard — Yea
Hartman — Yea
Sypolt — Yea
Thompson, C. — Yea
Thompson, R. — Yea
Nelson — Yea
Tomblin — Yea
Walker — Yea
Phillips — Yea
Diserio — Yea
Jeffries, J. — Yea
Bibby — Yea
Boggs — Yea
Byrd — Yea
Cadle — Yea
Capito — Yea
Caputo — Yea
Espinosa — Yea
Graves — Yea
Hanna — Yea
Harshbarger — Yea
Hicks — Yea
Hill — Yea
Hollen — Yea
Householder — Yea
Longstreth — Yea
Malcolm — Yea
Mandt — Yea
Pack — Yea
Paynter — Yea
Pethtel — Yea
Porterfield — Yea
Pyles — Yea
Sponaugle — Yea
Storch — Yea
Swartzmiller — Yea
Waxman — Yea
Westfall — Yea
Wilson — Yea
Evans — Yea
Robinson — Yea
Angelucci — Yea
Bates — Yea
Canestraro — Yea
Cowles — Yea
Doyle — Yea
Estep-Burton — Yea
Fleischauer — Yea
Hamrick — Yea
Hardy — Yea
Higginbotham — Yea
Kessinger — Yea
Lavender-Bowe — Yea
Lovejoy — Yea
Miley — Yea
Rodighiero — Yea
Rowe — Yea
Skaff — Yea
Staggers — Yea
Steele — Yea
Summers — Yea
Zukoff — Yea
Evan Hansen Democrat Yea
John Williams Democrat Yea
Mike Pushkin Democrat Yea
Sean Hornbuckle Democrat Yea
Shawn Fluharty Democrat Yea
Ben Queen Republican Yea
Betsy Kelly Republican Yea
Betsy Kelly Republican Yea
Carl Martin Republican Yea
Christopher W. Toney Republican Yea
D. Rolland Jennings Republican Yea
Dean Jeffries Republican Yea
Evan Worrell Republican Yea
Gary G. Howell Republican Yea
George Miller Republican Yea
Jason Barrett Republican Yea
Jeff Campbell Republican Yea
Jim Butler Republican Yea
Joe Ellington Republican Not Voting
John Paul Hott Republican Yea
Mark Dean Republican Yea
Matthew Rohrbach Republican Yea
Mike Azinger Republican Yea
Pat McGeehan Republican Yea
Patrick Martin Republican Yea
Roger Hanshaw Republican Yea
Roy Cooper Republican Not Voting
Vernon Criss Republican Yea
William Anderson Republican Yea

Official roll call →

EFFECT FROM PASSAGE

Passed 99 Yea · 0 Nay · 1 Other
Party YeaNayPresentNot Voting
Unaffiliated 70001
Republican 24000
Democrat 5000
Total 99001
% of votes cast 99%0%0%1%
How each member voted (100)
Member Party Vote
Evans — Yea
Foster — Yea
Brown, N. — Yea
Brown, S. — Yea
Maynard — Yea
Hartman — Yea
Sypolt — Yea
Atkinson — Yea
Bates — Yea
Bibby — Yea
Boggs — Yea
Byrd — Yea
Fast — Yea
Fleischauer — Yea
Graves — Yea
Hamrick — Yea
Hardy — Yea
Kump — Yea
Lavender-Bowe — Yea
Linville — Yea
Longstreth — Yea
Malcolm — Yea
Mandt — Yea
Rowan — Yea
Rowe — Yea
Shott — Yea
Skaff — Yea
Sponaugle — Yea
Storch — Yea
Swartzmiller — Yea
Thompson, C. — Yea
Thompson, R. — Yea
Nelson — Yea
Tomblin — Yea
Walker — Yea
Phillips — Yea
Diserio — Yea
Jeffries, J. — Yea
Cadle — Yea
Canestraro — Yea
Caputo — Yea
Espinosa — Yea
Hicks — Yea
Hill — Yea
Hollen — Yea
Householder — Yea
Pack — Yea
Paynter — Yea
Porterfield — Yea
Robinson — Yea
Waxman — Yea
Wilson — Yea
Angelucci — Yea
Capito — Not Voting
Cowles — Yea
Doyle — Yea
Estep-Burton — Yea
Hanna — Yea
Harshbarger — Yea
Higginbotham — Yea
Kessinger — Yea
Lovejoy — Yea
Miley — Yea
Pethtel — Yea
Pyles — Yea
Rodighiero — Yea
Staggers — Yea
Steele — Yea
Summers — Yea
Westfall — Yea
Zukoff — Yea
Evan Hansen Democrat Yea
John Williams Democrat Yea
Mike Pushkin Democrat Yea
Sean Hornbuckle Democrat Yea
Shawn Fluharty Democrat Yea
Ben Queen Republican Yea
Betsy Kelly Republican Yea
Betsy Kelly Republican Yea
Carl Martin Republican Yea
Christopher W. Toney Republican Yea
D. Rolland Jennings Republican Yea
Dean Jeffries Republican Yea
Evan Worrell Republican Yea
Gary G. Howell Republican Yea
George Miller Republican Yea
Jason Barrett Republican Yea
Jeff Campbell Republican Yea
Jim Butler Republican Yea
Joe Ellington Republican Yea
John Paul Hott Republican Yea
Mark Dean Republican Yea
Matthew Rohrbach Republican Yea
Mike Azinger Republican Yea
Pat McGeehan Republican Yea
Patrick Martin Republican Yea
Roger Hanshaw Republican Yea
Roy Cooper Republican Yea
Vernon Criss Republican Yea
William Anderson Republican Yea

Official roll call →

PASSAGE

Passed 99 Yea · 0 Nay · 1 Other
Party YeaNayPresentNot Voting
Unaffiliated 70001
Republican 24000
Democrat 5000
Total 99001
% of votes cast 99%0%0%1%
How each member voted (100)
Member Party Vote
Evans — Yea
Foster — Yea
Brown, N. — Yea
Brown, S. — Yea
Maynard — Yea
Hartman — Yea
Sypolt — Yea
Thompson, C. — Yea
Thompson, R. — Yea
Nelson — Yea
Tomblin — Yea
Walker — Yea
Atkinson — Yea
Bates — Yea
Bibby — Yea
Boggs — Yea
Byrd — Yea
Cadle — Yea
Caputo — Yea
Fast — Yea
Fleischauer — Yea
Graves — Yea
Hamrick — Yea
Hardy — Yea
Hicks — Yea
Higginbotham — Yea
Hollen — Yea
Kessinger — Yea
Kump — Yea
Linville — Yea
Longstreth — Yea
Malcolm — Yea
Mandt — Yea
Pack — Yea
Paynter — Yea
Pethtel — Yea
Shott — Yea
Sponaugle — Yea
Staggers — Yea
Storch — Yea
Swartzmiller — Yea
Phillips — Yea
Diserio — Yea
Jeffries, J. — Yea
Capito — Not Voting
Doyle — Yea
Estep-Burton — Yea
Porterfield — Yea
Pyles — Yea
Waxman — Yea
Westfall — Yea
Wilson — Yea
Zukoff — Yea
Angelucci — Yea
Canestraro — Yea
Cowles — Yea
Espinosa — Yea
Hanna — Yea
Harshbarger — Yea
Hill — Yea
Householder — Yea
Lavender-Bowe — Yea
Lovejoy — Yea
Miley — Yea
Robinson — Yea
Rodighiero — Yea
Rowan — Yea
Rowe — Yea
Skaff — Yea
Steele — Yea
Summers — Yea
Evan Hansen Democrat Yea
John Williams Democrat Yea
Mike Pushkin Democrat Yea
Sean Hornbuckle Democrat Yea
Shawn Fluharty Democrat Yea
Ben Queen Republican Yea
Betsy Kelly Republican Yea
Betsy Kelly Republican Yea
Carl Martin Republican Yea
Christopher W. Toney Republican Yea
D. Rolland Jennings Republican Yea
Dean Jeffries Republican Yea
Evan Worrell Republican Yea
Gary G. Howell Republican Yea
George Miller Republican Yea
Jason Barrett Republican Yea
Jeff Campbell Republican Yea
Jim Butler Republican Yea
Joe Ellington Republican Yea
John Paul Hott Republican Yea
Mark Dean Republican Yea
Matthew Rohrbach Republican Yea
Mike Azinger Republican Yea
Pat McGeehan Republican Yea
Patrick Martin Republican Yea
Roger Hanshaw Republican Yea
Roy Cooper Republican Yea
Vernon Criss Republican Yea
William Anderson Republican Yea

Official roll call →

Passage

Passed 32 Yea · 1 Nay · 1 Other
Party YeaNayPresentNot Voting
Republican 2000
Unaffiliated 30101
Total 32101
% of votes cast 94%3%0%3%
How each member voted (34)
Member Party Vote
JEFFRIES — Yea
SMITH — Yea
BALDWIN — Yea
LINDSAY — Nay
STOLLINGS — Yea
BEACH — Yea
MANN — Yea
SWOPE — Yea
BLAIR — Yea
MARONEY — Yea
SYPOLT — Yea
BOLEY — Yea
MAYNARD — Yea
TAKUBO — Yea
BOSO — Yea
PALUMBO — Yea
TARR — Yea
PLYMALE — Yea
TRUMP — Yea
CLINE — Not Voting
PREZIOSO — Yea
UNGER — Yea
FACEMIRE — Yea
ROBERTS — Yea
WELD — Yea
HAMILTON — Yea
ROMANO — Yea
WOELFEL — Yea
HARDESTY — Yea
RUCKER — Yea
MR PRESIDENT — Yea
IHLENFELD — Yea
Charles H. Clements Republican Yea
Mike Azinger Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 635?
SB 635 is sponsored by Randy E. Smith (Republican).
What is the current status of SB 635?
This bill has been enacted into law. Introduced February 15, 2019. Enacted.
Where can I track SB 635?
Track SB 635 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 635

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 635

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →