Virginia 2018 Regular Session Status: In Committee

SB 191 — Net energy metering; eligibility limits.

Last action — Left in Commerce and Labor

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House of Delegates
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2018 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Increases the cap on the amount of capacity a renewable electric generating facility in an area served by an investor-owned electric utility may have and remain eligible to participate in the net energy metering program. The measure increases such a facility's capacity from the expected annual energy consumption to 125 percent of that consumption based on billing history. In areas served by electric cooperatives, a facility is ineligible to participate in a net energy metering program if its capacity exceeds expected annual energy consumption. If the building to be served by the generating facility is newly constructed, the expected annual energy consumption is based on annual energy consumption at similar buildings. The measure also provides that net metering periods runs from June 1 through May 30 and provides that excess generation shall be purchased at a wholesale price determined in accordance with regulations of the State Corporation Commission.

Bill Text

What changed in the latest version

132 added · 112 removed

Plain-language change summary

The amendment to Bill SB 191 includes clarifications regarding how small agricultural energy generators can connect to the electric grid. Specifically, it allows these generators to choose how they connect, with a clear timeline for changes in regulations starting July 1, 2017, and 2019. This matters because it provides a structured approach for agricultural customers to manage their renewable energy generation and ensures they can still benefit from interconnection while adapting to new standards.

→
Previous
Latest
SESSION history | hilite | pdf | print version 18102658D SENATE BILL NO.
SESSION history | hilite | pdf | print version 18106596D SENATE BILL NO.
191 Offered January 10, 2018 Prefiled December 29, 2017 A BILL to amend and reenact § 56-594 of the Code of Virginia, relating to net energy metering.
191 AMENDMENT IN THE NATURE OF A SUBSTITUTE (Proposed by the Senate Committee on Commerce and Labor on February 5, 2018) (Patron Prior to Substitute--Senator Favola) A BILL to amend and reenact § 56-594 of the Code of Virginia, relating to net energy metering.
---------- Patrons-- Favola;
Be it enacted by the General Assembly of Virginia:
Delegate:
Lopez ---------- Referred to Committee on Commerce and Labor ---------- Be it enacted by the General Assembly of Virginia:
In addition to the electrical generating facility size limitations in clause (i), the capacity of any generating facility installed under this section after July 1, 2015 2018, shall not exceed (a) 125 percent of the expected annual energy consumption based on the previous months of billing history or an annualized calculation of billing history if 12 months of billing history is not available or (b) the projected energy consumption based on annual energy consumption at similar buildings if the building to be served by the generating facility is newly constructed.
In addition to the electrical generating facility size limitations in clause (i), the capacity of any generating facility installed under this section after July 1, 2015 2018, shall not exceed (a) for an investor-owned utility 125 percent or (b) for an electric cooperative 100 percent, of the expected annual energy consumption based on the previous 12 months of billing history or an annualized calculation of billing history if 12 months of billing history is not available or (b) the projected energy consumption based on annual energy consumption at similar buildings if the building to be served by the generating facility is newly constructed.
"Excess generation" means the amount of electrical energy generated in excess of the electrical energy consumed by the eligible agricultural customer-generator or eligible customer-generator over the course of the net metering period.
For time-of-use eligible agricultural customer generators or eligible customer-generators, excess generation is determined separately for each time-of-use tier.
"Net metering period" means the 12-month period following the date of final interconnection of the eligible customer-generator's or eligible agricultural customer-generator's system with an electric service provider, and each 12-month period thereafter.
"Net metering period" means the 12-month period following the date of final interconnection of the beginning June 1 of each year and ending May 31 of the next year.
Notwithstanding the foregoing, for the first year an eligible customer-generator's customer-generator or eligible agricultural customer-generator's system with an electric service provider, and each 12-month period thereafter customer-generator is interconnected, the net metering period shall consist of at least one full 12-month period and shall end on the May 31 following that period and begin anew on June 1.
The Commission shall establish minimum requirements for contracts to be entered into by the parties to net metering arrangements.
The Except as otherwise required by this section, the Commission shall establish minimum requirements for contracts to be entered into by the parties to net metering arrangements.
If electricity generated by an eligible customer-generator or eligible agricultural customer-generator over the net metering period exceeds the electricity consumed by the eligible customer-generator or eligible agricultural customer-generator, the customer-generator or eligible agricultural customer-generator shall be compensated for the excess electricity if the entity contracting to receive such electric energy and the eligible customer-generator or eligible agricultural customer-generator enter into a power purchase agreement for such excess electricity.
If electricity generated by an eligible customer-generator or eligible agricultural customer-generator over the net metering period exceeds the electricity consumed by the eligible customer-generator or eligible agricultural customer-generator, the customer-generator or eligible agricultural customer-generator shall be compensated for the excess electricity generation at the end of the net metering period if the entity contracting to receive such electric energy and the eligible customer-generator or eligible agricultural customer-generator enter into a power purchase agreement for such excess electricity generation.
For investor-owned electric utilities only, excess generation for which compensation has been received shall not be carried forward into the next net metering period.
If the eligible customer-generator or eligible agricultural customer-generator does not enter into a power purchase agreement for such excess generation, then any excess generation remaining at the end of the net metering period is forfeited by eligible customer-generator or eligible agricultural customer-generator and surrendered to the supplier.
The power purchase agreement shall obligate the supplier to purchase such excess electricity at the rate that is provided for such purchases in a net metering standard contract or tariff approved by the Commission, unless the parties agree to a higher rate.
The power purchase agreement shall obligate the supplier to purchase such excess electricity generation at the rate that is provided for such purchases in a net metering standard contract or tariff approved by the Commission, unless the parties agree to a higher rate price determined by the method set forth in 20VAC5-315-50 as of July 1, 2018.
Nothing in this section shall prevent the eligible customer-generator or eligible agricultural customer-generator and the supplier from voluntarily entering into an agreement for the sale and purchase of excess electricity or renewable energy certificates at mutually-agreed upon prices if the eligible customer-generator or eligible agricultural customer-generator does not exercise its option to sell its renewable energy certificates to its supplier at Commission-approved prices at the time that the eligible customer-generator or eligible agricultural customer-generator enters into a power purchase agreement with its supplier.
Nothing in this section shall prevent the eligible customer-generator or eligible agricultural customer-generator and the supplier from voluntarily entering into an agreement for the sale and purchase of excess electricity generation or renewable energy certificates at mutually-agreed upon prices if the eligible customer-generator or eligible agricultural customer-generator does not exercise its option to sell its renewable energy certificates to its supplier at Commission-approved prices at the time that the eligible customer-generator or eligible agricultural customer-generator enters into a power purchase agreement with its supplier.
All costs incurred by the supplier to purchase excess electricity and renewable energy certificates from eligible customer-generators or eligible agricultural customer-generators shall be recoverable through its Renewable Energy Portfolio Standard (RPS) rate adjustment clause, if the supplier has a Commission-approved RPS plan.
All costs incurred by the supplier to purchase excess electricity generation and renewable energy certificates from eligible customer-generators or eligible agricultural customer-generators shall be recoverable through its Renewable Energy Portfolio Standard (RPS) rate adjustment clause, if the supplier has a Commission-approved RPS plan.
For purposes of this section, "all costs" shall be defined as the rates paid to the eligible customer-generator or eligible agricultural customer-generator for the purchase of excess electricity and renewable energy certificates and any administrative costs incurred to manage the eligible customer-generator's or eligible agricultural customer-generator's power purchase arrangements.
For purposes of this section, "all costs" shall be defined as the rates prices paid to the eligible customer-generator or eligible agricultural customer-generator for the purchase of excess electricity generation and renewable energy certificates and any administrative costs incurred to manage the eligible customer-generator's or eligible agricultural customer-generator's power purchase arrangements.
The net metering standard contract or tariff shall be available to eligible customer-generators or eligible agricultural customer-generators on a first-come, first-served basis in each electric distribution company's Virginia service area until the rated generating capacity owned and operated by eligible customer-generators, eligible agricultural customer-generators, and small agricultural generators in the state reaches one percent of each electric distribution company's adjusted Virginia peak-load forecast for the previous year, and shall require the supplier to pay the eligible customer-generator or eligible agricultural customer-generator for such excess electricity in a timely manner at a rate to be established by the Commission.
The net metering standard contract or tariff shall be available to eligible customer-generators or eligible agricultural customer-generators on a first-come, first-served basis in each electric distribution company's Virginia service area until the rated generating capacity owned and operated by eligible customer-generators, eligible agricultural customer-generators, and small agricultural generators in the state reaches one percent of each electric distribution company's adjusted Virginia peak-load forecast for the previous year, and shall require the supplier to pay the eligible customer-generator or eligible agricultural customer-generator for such excess electricity generation in a timely manner at a rate to be established by the Commission the price determined by the method set forth in 20VAC5-315-50 as of July 1, 2018.
View plain text versions (2)

Action History

  1. Left in Commerce and Labor

  2. Assigned C & L sub: Subcommittee #3

  3. Referred to Committee on Commerce and Labor

  4. Read first time

  5. Placed on Calendar

  6. Engrossed by Senate - committee substitute SB191S1

  7. Committee substitute agreed to 18106596D-S1

  8. Reading of substitute waived

  9. Read second time

  10. Referred to Committee on Commerce and Labor

  11. Prefiled and ordered printed; offered 01/10/18 18102658D

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 1 co-sponsors · 146 not signed on

Sponsors (1)

Co-sponsors (1)

Not signed on (146)

146 members have not signed on to this bill.

Show all 146 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 191 do?
Increases the cap on the amount of capacity a renewable electric generating facility in an area served by an investor-owned electric utility may have and remain eligible to participate in the net energy metering program. The measure increases such a facility's capacity from the expected annual energy consumption to 125 percent of that consumption based on billing history. In areas served by electric cooperatives, a facility is ineligible to participate in a net energy metering program if its capacity exceeds expected annual energy consumption. If the building to be served by the generating facility is newly constructed, the expected annual energy consumption is based on annual energy consumption at similar buildings. The measure also provides that net metering periods runs from June 1 through May 30 and provides that excess generation shall be purchased at a wholesale price determined in accordance with regulations of the State Corporation Commission.
Who sponsors SB 191?
SB 191 is sponsored by Alfonso H. Lopez and Barbara A. Favola.
What is the current status of SB 191?
This bill died with 2018 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 191?
Track SB 191 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 191

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 191

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →