S2708 — Relates to advanced transmission technologies
Last action — In Assembly Committee
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed Assembly
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced January 22, 2025. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Prognosis
Where this bill stands today.
Odds of enactment
LowHow often bills like it became law.
Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
In plain language
The bill requires utilities to analyze costs and timelines for new transmission technologies.
This legislation mandates that electric and gas corporations submit a cost-effectiveness and timetable analysis during rate proceedings. It also instructs NYSERDA to study advanced transmission technologies.
What this means for you
- Environment: This bill may lead to improved energy transmission technologies, potentially benefiting environmental sustainability efforts.
Summary
Directs electric corporations and combination electric and gas corporations to file a cost-effectiveness and timetable analysis as part of any base rate proceeding with the public service commission; directs NYSERDA to conduct a study on the effectiveness of advanced transmission technologies.
Bill Text
- Full text View text Current
Action History
-
REFERRED TO WAYS AND MEANS
-
RETURNED TO ASSEMBLY
-
REPASSED SENATE
-
AMENDED ON THIRD READING (T) 2708B
-
VOTE RECONSIDERED - RESTORED TO THIRD READING
-
RETURNED TO SENATE
-
RECALLED FROM ASSEMBLY
-
REFERRED TO ENERGY
-
DELIVERED TO ASSEMBLY
-
PASSED SENATE
-
AMENDED ON THIRD READING (T) 2708A
-
ADVANCED TO THIRD READING
-
2ND REPORT CAL.
-
1ST REPORT CAL.454
-
REFERRED TO ENERGY AND TELECOMMUNICATIONS
-
RETURNED TO SENATE
-
DIED IN ASSEMBLY
-
REFERRED TO ENERGY
-
DELIVERED TO ASSEMBLY
-
PASSED SENATE
-
ADVANCED TO THIRD READING
-
2ND REPORT CAL.
-
1ST REPORT CAL.407
-
REFERRED TO ENERGY AND TELECOMMUNICATIONS
Sponsors
- Rachel May · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 218 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (218)
218 members have not signed on to this bill.
Show all 218 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does S2708 do?
- Directs electric corporations and combination electric and gas corporations to file a cost-effectiveness and timetable analysis as part of any base rate proceeding with the public service commission; directs NYSERDA to conduct a study on the effectiveness of advanced transmission technologies.
- Who sponsors S2708?
- S2708 is sponsored by Rachel May.
- What is the current status of S2708?
- This bill has been introduced in the Senate. Introduced January 22, 2025. It must pass committee before a floor vote.
- Where can I track S2708?
- Track S2708 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S2708
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S2708
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →