West Virginia 2018 Regular Session Status: Passed Senate 2 R cosponsors

SB 600 — Relating to powers and duties of PSC

Last action — Rejected by Senate (Roll No. 262)

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House of Delegates
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2018 Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Bill Text

What changed in the latest version

110 added · 116 removed

Plain-language change summary

The amendment to Bill SB 600 introduces new provisions for setting special electricity rates for energy-intensive industries in West Virginia. It emphasizes that these lower rates are crucial for maintaining the state's competitive edge and economic opportunities, as they have eroded over time. This change matters because it aims to support job retention and growth in the manufacturing sector, potentially boosting the local economy.

→
Previous
Latest
NEWS RELEASES HELPFUL LINKS Introduced Version « Senate Bill 600 History OTHER VERSIONS  —  Committee Substitute (1)  |   |  Email Key:
NEWS RELEASES HELPFUL LINKS SB600 SUB1 « Senate Bill 600 History OTHER VERSIONS  —  Introduced Version  |   |  Email Key:
Red = new code to be enacted WEST virginia legislature regular session Introduced Senate Bill 600 By Senators Smith, Ferns, and Weld [Introduced February 19, 2018;
Red = new code to be enacted WEST virginia legislature regular session Committee Substitute for Senate Bill 600 By Senators Smith, Ferns, and Weld [Originating in the Committee on Energy, Industry, and Mining;
Referred to the Committee on Energy, Industry, and Mining;
Reported on February 23, 2018]     A BILL to amend and reenact §24-2-1j of the Code of West Virginia, 1931, as amended, relating to powers and duties of the Public Service Commission;
and then to the Committee on Government Organization] A BILL to amend and reenact §24-2-1j of the Code of West Virginia, 1931, as amended, relating to powers and duties of the Public Service Commission;
establishing special rates and provisions for energy intensive industrial and manufacturing consumers of electric power;
special rates and provisions for energy intensive industrial and manufacturing consumers of electric power;
adding new definitions;
new definitions;
and establishing the procedure required for approval of these rates for manufacturing consumers by the commission.
and the procedure required for approval of these rates for manufacturing consumers by the commission.
(3) Energy intensive industrial and manufacturing consumers of electric power create jobs, provide a substantial tax base and enhance the productive capacity, competitiveness and economic opportunities of West Virginia and all of its citizens;
(3) Energy intensive industrial and manufacturing consumers of electric power create jobs, provide a substantial tax base, and enhance the productive capacity, competitiveness, and economic opportunities of West Virginia and all of its citizens;
(5) It is in the best interests of West Virginia, the citizens of West Virginia, electric public utilities in West Virginia, and all consumers of electric power in West Virginia, including residential customers, to encourage the continued development, construction, operation, maintenance and expansion in West Virginia of industrial and manufacturing plants and facilities which are energy intensive consumers of electric power, thereby increasing the creation, preservation and retention of jobs, retaining and expanding the tax base, helping keep power rates low for all consumers of electric power, and enhancing the productive capacity, competitiveness and economic opportunities of all citizens of West Virginia and;
(5) It is in the best interests of West Virginia, the citizens of West Virginia, electric public utilities in West Virginia, and all consumers of electric power in West Virginia, including residential customers, to encourage the continued development, construction, operation, maintenance, and expansion in West Virginia of industrial and manufacturing plants and facilities which are energy intensive consumers of electric power, thereby increasing the creation, preservation, and retention of jobs, retaining and expanding the tax base, helping keep power rates low for all consumers of electric power, and enhancing the productive capacity, competitiveness, and economic opportunities of all citizens of West Virginia and;
(6) To encourage the continued development, construction, operation, maintenance and expansion in West Virginia of industrial and manufacturing plants and facilities which are energy intensive consumers of electric power, the commission may accept special contracts and establish special rates and other supply arrangements under this section that in its judgment are necessary or appropriate for the continued, new or expanded operation of energy intensive industrial and manufacturing consumers and that can reasonably be expected to support the long-term operation of energy intensive industrial and manufacturing consumers, and that do not impose an unreasonable burden upon electric public utilities or their other customers.
(6) To encourage the continued development, construction, operation, maintenance, and expansion in West Virginia of industrial and manufacturing plants and facilities which are energy intensive consumers of electric power, the commission may accept special contracts and establish special rates and other supply arrangements under this section that in its judgment are necessary or appropriate for the continued, new, or expanded operation of energy intensive industrial and manufacturing consumers and that can reasonably be expected to support the long-term operation of energy intensive industrial and manufacturing consumers, and that do not impose an unreasonable burden upon electric public utilities or their other customers.
(1) “Energy intensive industrial and manufacturing consumer” means an industrial or manufacturing facility, plant or enterprise located or to be located in West Virginia that has an actual demand in the past 12 months, or  a projected contract demand of at least fifty thousand 10,000 kilowatts of electric power at its West Virginia facilities and the cost of electricity consumed in the industrial or manufacturing process constitutes at least 10 percent of the cost of production under normal operating conditions.
(1) “Energy intensive industrial and manufacturing consumer” means an industrial or manufacturing facility, plant, or enterprise located or to be located in West Virginia that has an actual demand in the past 12 months, or a projected contract demand of at least fifty thousand 10,000 kilowatts of electric power at its West Virginia facilities, and the cost of electricity consumed in the industrial or manufacturing process constitutes at least 10 percent of the cost of production under normal operating conditions.
In setting a special rate by reference to fluctuations in market prices for the goods and products produced by an energy intensive industrial or manufacturing consumer of electric power, the commission may establish variable rates including, but not limited to, ceilings and floors on the special rate, banking or crediting mechanisms, caps, limits or other similar types of safeguards that are intended by the commission, in its reasonable judgment, to provide appropriate flexibility and predictability in the special rate over time, to permit the energy intensive industrial or manufacturing consumer customer the ability to make the capital investments and other commitments necessary to support the continued operation of the facility.
In setting a special rate by reference to fluctuations in market prices for the goods and products produced by an energy intensive industrial or manufacturing consumer of electric power, the commission may establish variable rates including, but not limited to, ceilings and floors on the special rate, banking or crediting mechanisms, caps, limits, or other similar types of safeguards that are intended by the commission, in its reasonable judgment, to provide appropriate flexibility and predictability in the special rate over time, to permit the energy intensive industrial or manufacturing consumer customer the ability to make the capital investments and other commitments necessary to support the continued operation of the facility.
If the utility may implement the provisions of the agreement pursuant to the provisions of subsections (f) and (h) of this section.  Nothing herein limits the legal rights of the energy intensive industrial or manufacturing consumer if the negotiations are unsuccessful.
If the utility may implement the provisions of the agreement pursuant to the provisions of §24-2-1j(f) and §24-2-1j(h) of this code.
Nothing herein limits the legal rights of the energy intensive industrial or manufacturing consumer if the negotiations are unsuccessful.
(5) Provide reasonable evidence that, with the special rate, the energy intensive industrial or manufacturing consumer intends to operate the industrial or manufacturing facility or facilities in West Virginia for an extended period of time, and that the operation or continued operation of the industrial or manufacturing facility or facilities for an extended period of time appears economically viable, under reasonable assumptions and projections regarding the market in which the energy intensive industrial or manufacturing consumer operates and regarding the operation of the industrial facility or facilities;
(5) Provide reasonable evidence that, with the special rate, the energy intensive industrial or manufacturing consumer intends to operate the industrial or manufacturing facility or facilities in West Virginia for an extended period of time, and that the operation or continued operation of the industrial or manufacturing facility or facilities for an extended period of time appears economically viable, under reasonable assumptions and projections regarding the market in which the energy intensive industrial or manufacturing consumer operates and regarding the operation of the industrial or manufacturing facility or facilities;
and (6) Provide information and data setting forth how the energy intensive industrial or manufacturing consumer meets the qualifications of this section, and how the special rate advances the policy goals set forth in subsection (a) of this section.
and (6) Provide information and data setting forth how the energy intensive industrial or manufacturing consumer meets the qualifications of this section, and how the special rate advances the policy goals set forth in §24-2-1j(a) of this code.
If the commission takes no action during the 60-day review period to further suspend the effectiveness by setting the agreement for hearing, the rates and any other provisions set forth in the agreement shall be considered reasonable and may be implemented by the utility.  The special rate or special contract may not provide any discount on the variable cost recovery component that the utility would have received under the applicable tariff rates for which the consumer would otherwise qualify (g) If the commission determines that:
If the commission takes no action during the 60-day review period to further suspend the effectiveness by setting the agreement for hearing, the rates and any other provisions set forth in the agreement shall be considered reasonable and may be implemented by the utility.
The special rate or special contract may not provide any discount on the variable cost recovery component that the utility would have received under the applicable tariff rates for which the consumer would otherwise qualify.
(g) If the commission determines that:
The allocated share shall be calculated by the affected public utility, subject to the approval of the commission A utility entering into a special rate or special contract under the provisions of subsection (f) of this section may not seek recovery outside of a general rate proceeding filed pursuant to Rule 42 of the commission's rules for the construction and filing of tariffs of any revenue differential attributable to the difference between the fixed cost recovery component of the special rate or special contract and the fixed cost recovery component of the applicable approved tariff rate for which the consumer would otherwise qualify.
The allocated share shall be calculated by the affected public utility, subject to the approval of the commission A utility entering into a special rate or special contract under the provisions of §24-2-1j(f) of this code may not seek recovery outside of a general rate proceeding filed pursuant to Rule 42 of the commission's rules for the construction and filing of tariffs of any revenue differential attributable to the difference between the fixed cost recovery component of the special rate or special contract and the fixed cost recovery component of the applicable approved tariff rate for which the consumer would otherwise qualify.
(h) The commission shall include in the annual report to the Legislature which it makes pursuant to subsection (d), section one, article one of this chapter a report on the tax credits being employed pursuant to article thirteen-cc, chapter eleven of this code to help fund special rates created under this section  A special rate or special contract under this subsection related to existing electrical load of the consumer shall become effective 60 days after the filing of the agreement with the commission under its Rules, unless upon review the commission finds cause within the 60-day period to suspend the effectiveness of the agreement and sets the agreement for further consideration or hearing.
(h) The commission shall include in the annual report to the Legislature which it makes pursuant to subsection (d), section one, article one of this chapter a report on the tax credits being employed pursuant to article thirteen-cc, chapter eleven of this code to help fund special rates created under this section A special rate or special contract under this subsection related to existing electrical load of the consumer shall become effective 60 days after the filing of the agreement with the commission under its rules, unless upon review the commission finds cause within the 60-day period to suspend the effectiveness of the agreement and sets the agreement for further consideration or hearing.
(i) A utility entering into a special rate or special contract under subsection (h) of this section shall recover in a timely manner the revenue differential attributable to the difference between the special rate or special contract and the rates previously applicable to the consumer in a general rate proceeding, a special purpose rate proceeding, or other proceeding specific to the special rate or special contract.
(i) A utility entering into a special rate or special contract under §24-2-1j(h) of this code shall recover in a timely manner the revenue differential attributable to the difference between the special rate or special contract and the rates previously applicable to the consumer in a general rate proceeding, a special purpose rate proceeding, or other proceeding specific to the special rate or special contract.
(j) Notwithstanding the capacity limit for energy intensive industrial or manufacturing consumers set forth in subsection (b)(1) of this section, individual consumers with capacities less than 10,000 kilowatts and for which the cost of electricity consumed in the industrial or manufacturing process constitutes at least 10 percent of the cost of production under normal operating conditions may qualify for a special rate or special contract under this subsection provided that the aggregate capacity for consumers participating in a special rate or special contract under this subsection (j) of this section does not exceed 20,000 kilowatts for affiliated regulated utilities operating in West Virginia.
(j) Notwithstanding the capacity limit for energy intensive industrial or manufacturing consumers set forth in §24-2-1j(b)(1) of this code, individual consumers with capacities less than 10,000 kilowatts and for which the cost of electricity consumed in the industrial or manufacturing process constitutes at least 10 percent of the cost of production under normal operating conditions may qualify for a special rate or special contract under this subsection provided that the aggregate capacity for consumers participating in a special rate or special contract under this subsection does not exceed 20,000 kilowatts for affiliated regulated utilities operating in West Virginia.
Bill Status  |  Bill Tracking  |  Legacy WV Code  |  Bulletin Board  |  District Maps  |  Senate Roster  |  House Roster  |  Live  |  Blog  |  Jobs  |  Links  |  Home This Web site is maintained by the West Virginia Legislature's Office of Reference & Information.
    Bill Status  |  Bill Tracking  |  Legacy WV Code  |  Bulletin Board  |  District Maps  |  Senate Roster  |  House Roster  |  Live  |  Blog  |  Jobs  |  Links  |  Home This Web site is maintained by the West Virginia Legislature's Office of Reference & Information.
View plain text versions (2)

Action History

  1. Rejected by Senate (Roll No. 262)

  2. Read 3rd time

  3. Laid over on 3rd reading 2/27/18

  4. On 3rd reading

  5. Senator Jeffries requests to be removed as sponsor of bill

  6. Senator Prezioso requests to be removed as sponsor of bill

  7. Read 2nd time

  8. On 2nd reading

  9. Reported do pass

  10. Having been read 1st time 2/23/18

  11. On 2nd reading to Government Organization

  12. Read 1st time

  13. Immediate consideration

  14. Committee substitute reported, but first to Government Organization

  15. To Energy, Industry and Mining

  16. Introduced in Senate

  17. To Energy, Industry and Mining then Government Organization

  18. Filed for introduction

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 2 co-sponsors · 131 not signed on

Sponsors (1)

Co-sponsors (2)

Not signed on (131)

131 members have not signed on to this bill.

Show all 131 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 600?
SB 600 is sponsored by Ferns, Ryan Weld (Republican), and Randy E. Smith (Republican).
What is the current status of SB 600?
This bill died with 2018 Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 600?
Track SB 600 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 600

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 600

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →