Relating to powers and duties of PSC
Do you support it?
Want to know if it passes?
We'll email you when SB 600 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on SB 600.
You're tracking SB 600
We'll email you the moment it moves.
SB 600 — Relating to powers and duties of PSC
Last action — Rejected by Senate (Roll No. 262)
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
3Passed Senate
-
4Passed House of Delegates
-
5To Executive
-
6Enacted
This bill died with 2018 Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Bill Text
What changed in the latest version
110 added · 116 removedPlain-language change summary
The amendment to Bill SB 600 introduces new provisions for setting special electricity rates for energy-intensive industries in West Virginia. It emphasizes that these lower rates are crucial for maintaining the state's competitive edge and economic opportunities, as they have eroded over time. This change matters because it aims to support job retention and growth in the manufacturing sector, potentially boosting the local economy.
NEWS RELEASES HELPFUL LINKS IntroducedSB600 VersionSUB1 « Senate Bill 600 History OTHER VERSIONS — CommitteeIntroduced SubstituteVersion (1) | | Email Key:
Red = new code to be enacted WEST virginia legislature regular session IntroducedCommittee Substitute for Senate Bill 600 By Senators Smith, Ferns, and Weld [Introduced[Originating Februaryin 19,the 2018;Committee on Energy, Industry, and Mining;
ReferredReported on February 23, 2018] A BILL to amend and reenact §24-2-1j of the CommitteeCode onof Energy,West Industry,Virginia, 1931, as amended, relating to powers and Mining;duties of the Public Service Commission;
andestablishing thenspecial torates theand Committeeprovisions onfor Governmentenergy Organization]intensive Aindustrial BILL to amend and reenactmanufacturing §24-2-1jconsumers of theelectric Codepower; of West Virginia, 1931, as amended, relating to powers and duties of the Public Service Commission;
specialadding ratesnew anddefinitions; provisions for energy intensive industrial and manufacturing consumers of electric power;
newand definitions;establishing the procedure required for approval of these rates for manufacturing consumers by the commission.
and the procedure required for approval of these rates for manufacturing consumers by the commission.
(3) Energy intensive industrial and manufacturing consumers of electric power create jobs, provide a substantial tax basebase, and enhance the productive capacity, competitivenesscompetitiveness, and economic opportunities of West Virginia and all of its citizens;
(5) It is in the best interests of West Virginia, the citizens of West Virginia, electric public utilities in West Virginia, and all consumers of electric power in West Virginia, including residential customers, to encourage the continued development, construction, operation, maintenancemaintenance, and expansion in West Virginia of industrial and manufacturing plants and facilities which are energy intensive consumers of electric power, thereby increasing the creation, preservationpreservation, and retention of jobs, retaining and expanding the tax base, helping keep power rates low for all consumers of electric power, and enhancing the productive capacity, competitivenesscompetitiveness, and economic opportunities of all citizens of West Virginia and;
(6) To encourage the continued development, construction, operation, maintenancemaintenance, and expansion in West Virginia of industrial and manufacturing plants and facilities which are energy intensive consumers of electric power, the commission may accept special contracts and establish special rates and other supply arrangements under this section that in its judgment are necessary or appropriate for the continued, newnew, or expanded operation of energy intensive industrial and manufacturing consumers and that can reasonably be expected to support the long-term operation of energy intensive industrial and manufacturing consumers, and that do not impose an unreasonable burden upon electric public utilities or their other customers.
(1) “Energy intensive industrial and manufacturing consumer” means an industrial or manufacturing facility, plantplant, or enterprise located or to be located in West Virginia that has an actual demand in the past 12 months, or or a projected contract demand of at least fifty thousand 10,000 kilowatts of electric power at its West Virginia facilitiesfacilities, and the cost of electricity consumed in the industrial or manufacturing process constitutes at least 10 percent of the cost of production under normal operating conditions.
In setting a special rate by reference to fluctuations in market prices for the goods and products produced by an energy intensive industrial or manufacturing consumer of electric power, the commission may establish variable rates including, but not limited to, ceilings and floors on the special rate, banking or crediting mechanisms, caps, limitslimits, or other similar types of safeguards that are intended by the commission, in its reasonable judgment, to provide appropriate flexibility and predictability in the special rate over time, to permit the energy intensive industrial or manufacturing consumer customer the ability to make the capital investments and other commitments necessary to support the continued operation of the facility.
If the utility may implement the provisions of the agreement pursuant to the provisions of subsections§24-2-1j(f) (f) and (h)§24-2-1j(h) of this section. code. Nothing herein limits the legal rights of the energy intensive industrial or manufacturing consumer if the negotiations are unsuccessful.
Nothing herein limits the legal rights of the energy intensive industrial or manufacturing consumer if the negotiations are unsuccessful.
(5) Provide reasonable evidence that, with the special rate, the energy intensive industrial or manufacturing consumer intends to operate the industrial or manufacturing facility or facilities in West Virginia for an extended period of time, and that the operation or continued operation of the industrial or manufacturing facility or facilities for an extended period of time appears economically viable, under reasonable assumptions and projections regarding the market in which the energy intensive industrial or manufacturing consumer operates and regarding the operation of the industrial or manufacturing facility or facilities;
and (6) Provide information and data setting forth how the energy intensive industrial or manufacturing consumer meets the qualifications of this section, and how the special rate advances the policy goals set forth in subsection§24-2-1j(a) (a) of this section.code.
If the commission takes no action during the 60-day review period to further suspend the effectiveness by setting the agreement for hearing, the rates and any other provisions set forth in the agreement shall be considered reasonable and may be implemented by the utility. utility. The special rate or special contract may not provide any discount on the variable cost recovery component that the utility would have received under the applicable tariff rates for which the consumer would otherwise qualify (g) If the commission determines that:
The special rate or special contract may not provide any discount on the variable cost recovery component that the utility would have received under the applicable tariff rates for which the consumer would otherwise qualify.
(g) If the commission determines that:
The allocated share shall be calculated by the affected public utility, subject to the approval of the commission A utility entering into a special rate or special contract under the provisions of subsection§24-2-1j(f) (f) of this sectioncode may not seek recovery outside of a general rate proceeding filed pursuant to Rule 42 of the commission's rules for the construction and filing of tariffs of any revenue differential attributable to the difference between the fixed cost recovery component of the special rate or special contract and the fixed cost recovery component of the applicable approved tariff rate for which the consumer would otherwise qualify.
(h) The commission shall include in the annual report to the Legislature which it makes pursuant to subsection (d), section one, article one of this chapter a report on the tax credits being employed pursuant to article thirteen-cc, chapter eleven of this code to help fund special rates created under this section section A special rate or special contract under this subsection related to existing electrical load of the consumer shall become effective 60 days after the filing of the agreement with the commission under its Rules,rules, unless upon review the commission finds cause within the 60-day period to suspend the effectiveness of the agreement and sets the agreement for further consideration or hearing.
(i) A utility entering into a special rate or special contract under subsection§24-2-1j(h) (h) of this sectioncode shall recover in a timely manner the revenue differential attributable to the difference between the special rate or special contract and the rates previously applicable to the consumer in a general rate proceeding, a special purpose rate proceeding, or other proceeding specific to the special rate or special contract.
(j) Notwithstanding the capacity limit for energy intensive industrial or manufacturing consumers set forth in subsection§24-2-1j(b)(1) (b)(1) of this section,code, individual consumers with capacities less than 10,000 kilowatts and for which the cost of electricity consumed in the industrial or manufacturing process constitutes at least 10 percent of the cost of production under normal operating conditions may qualify for a special rate or special contract under this subsection provided that the aggregate capacity for consumers participating in a special rate or special contract under this subsection (j) of this section does not exceed 20,000 kilowatts for affiliated regulated utilities operating in West Virginia.
Bill Status | Bill Tracking | Legacy WV Code | Bulletin Board | District Maps | Senate Roster | House Roster | Live | Blog | Jobs | Links | Home This Web site is maintained by the West Virginia Legislature's Office of Reference & Information.
View plain text versions (2)
- Committee Substitute View text Current html
- Introduced Introduced Version html
Action History
-
Rejected by Senate (Roll No. 262)
-
Read 3rd time
-
Laid over on 3rd reading 2/27/18
-
On 3rd reading
-
Senator Jeffries requests to be removed as sponsor of bill
-
Senator Prezioso requests to be removed as sponsor of bill
-
Read 2nd time
-
On 2nd reading
-
Reported do pass
-
Having been read 1st time 2/23/18
-
On 2nd reading to Government Organization
-
Read 1st time
-
Immediate consideration
-
Committee substitute reported, but first to Government Organization
-
To Energy, Industry and Mining
-
Introduced in Senate
-
To Energy, Industry and Mining then Government Organization
-
Filed for introduction
Sponsors
- Ferns · Cosponsor
- Ryan Weld · Cosponsor
- Randy E. Smith · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 2 co-sponsors · 131 not signed on
Sponsors (1)
- Randy E. Smith Republican
Co-sponsors (2)
- Ferns
- Ryan Weld Republican
Not signed on (131)
131 members have not signed on to this bill.
Show all 131 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- Who sponsors SB 600?
- SB 600 is sponsored by Ferns, Ryan Weld (Republican), and Randy E. Smith (Republican).
- What is the current status of SB 600?
- This bill died with 2018 Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track SB 600?
- Track SB 600 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 600
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 600
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →