Washington 2017-2018 Regular Session Status: Passed House 9 D cosponsors

HB 2280 — Concerning community solar gardens.

Last action — Referred to Rules 2 Consideration.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2017-2018 Regular Session. It reached “Passed House” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Bill Text

What changed in the latest version

1 added · 1 removed

Plain-language change summary

The amended version of Bill HB 2280 establishes a framework for community solar gardens, now requiring electrical companies to submit detailed plans that include not only the setup of these gardens but also how they will benefit the distribution system and allow for community engagement. Notably, the changes clarify that while subscribers should receive bill credits for their shares in the solar garden, the criteria for credit calculations and interconnection standards have been refined. This matters because it emphasizes fair compensation for energy produced while ensuring that plan implementation is transparent, beneficial to the community, and encourages the development of solar energy in Washington State.

→
Previous
Latest
H-4014.2SUBSTITUTE HOUSE BILL 2280State of Washington65th Legislature2018 Regular SessionBy House Technology & Economic Development (originally sponsored by Representatives Morris, Hudgins, Goodman, Santos, Slatter, Lytton, Tharinger, Senn, Frame, Kloba, Ryu, and Doglio)READ FIRST TIME 02/01/18.AN ACT Relating to community solar gardens;
H-3303.1HOUSE BILL 2280State of Washington65th Legislature2018 Regular SessionBy Representatives Morris, Hudgins, Goodman, Santos, Slatter, Lytton, Tharinger, Senn, Frame, Kloba, Ryu, and DoglioPrefiled 12/13/17.
Read first time 01/08/18.
Referred to Committee on Technology & Economic Development.AN ACT Relating to community solar gardens;
The legislature finds that community solar gardens represent a lower-cost point of entry for Washington consumers who want access to solar electricity generated on their behalf, as well as for consumers who do not have access to a sun regime that would make a residential solar energy system viable.NEW SECTION.  Sec. 2.  The definitions in this section apply throughout this chapter unless the context clearly requires otherwise.(1) "Commission" means the utilities and transportation commission.(2) "Community solar garden" means a facility, including a community solar project as defined in RCW 82.16.110 and 82.16.160, that generates electricity by means of a ground-mounted or roof-mounted solar photovoltaic device whereby subscribers receive a bill credit for the electricity generated in proportion to the size of their subscription, and has a capacity of no more than five hundred kilowatts.(3) "Electric utility" means any electrical company, public utility district, irrigation district, port district, electric cooperative, or municipal electric utility that is engaged in the business of distributing electricity to retail electric customers in the state.(4) "Electrical company" has the same meaning as defined in RCW 80.04.010.(5) "Subscriber" means a retail electric customer of an electric utility who owns one or more subscriptions of a community solar garden facility interconnected with that utility.(6) "Subscriber organization" means any for-profit or nonprofit entity that owns or operates one or more community solar gardens.(7) "Subscription" means a contract between a subscriber and the owner of a community solar garden.NEW SECTION.  Sec. 3.  (1) A community solar garden:(a) May not have fewer than five subscribers, with no single subscriber having more than forty percent interest in the project;(b) Must be located in the service territory and on the distribution system of an electric utility such that the community solar garden is located in an area that provides the most benefit on the distribution system in accordance with the community solar garden plan developed under section 4 of this act;
The legislature finds that community solar gardens represent a low-cost point of entry for Washington consumers who want solar electricity, as well as for consumers who do not have access to a sun regime that would make a residential solar energy system viable.NEW SECTION.  Sec. 2.  The definitions in this section apply throughout this chapter unless the context clearly requires otherwise.(1) "Commission" means the utilities and transportation commission.(2) "Community solar garden" means a facility, including a community solar project as defined in RCW 82.16.160, that generates electricity by means of a ground-mounted or roof-mounted solar photovoltaic device whereby subscribers receive a bill credit for the electricity generated in proportion to the size of their subscription.(3) "Electric utility" means any electrical company, public utility district, irrigation district, port district, electric cooperative, or municipal electric utility that is engaged in the business of distributing electricity to retail electric customers in the state.(4) "Electrical company" has the same meaning as defined in RCW 80.04.010.(5) "Subscriber" means a retail electric customer of an electric utility who owns one or more subscriptions of a community solar garden facility interconnected with that utility.(6) "Subscriber organization" means any for-profit or nonprofit entity that owns or operates one or more community solar gardens.(7) "Subscription" means a contract between a subscriber and the owner of a community solar garden.NEW SECTION.  Sec. 3.  (1) A community solar garden:(a) May not have fewer than five subscribers, with no single subscriber having more than forty percent interest in the project;(b) Must be located in the service territory and on the distribution system of an electric utility filing a plan under section 4 of this act such that, if the electric utility has a distributed energy resources plan or other distribution system plan, the community solar garden is located in an area that provides the most benefit on the distribution system in accordance with the distributed energy resources plan or other distribution system plan;
and(c) Must allocate not less than forty percent of project capacity to residential and small business customers under twenty-five kilowatts.(2)(a) A subscriber must be located in the same electric utility service territory as the community solar garden facility.(b) A subscription must be sized to represent at least one kilowatt of the generating capacity of the community solar garden and may supply, when combined with other distributed generation resources serving the premises, no more than one hundred five percent of the average annual consumption of electricity by each subscriber at the premises to which the subscription is attributed.(3)(a) A subscriber organization must, on a monthly basis, provide to the electric utility the total kilowatt-hours of generation attributable to each of the utility's retail electric customers participating in a community solar garden project in accordance with the subscriber's share of the output of the community solar garden.
and(c) Must allocate not less than forty percent of project capacity to residential and small business customers under twenty-five kilowatts.(2)(a) A subscriber must be located in the same electric utility service territory as the community solar garden facility.(b) A subscription must be sized to represent at least one kilowatt of the generating capacity of the community solar garden and may supply, when combined with other distributed generation resources serving the premises, no more than one hundred twenty percent of the average annual consumption of electricity by each subscriber at the premises to which the subscription is attributed.(3)(a) A subscriber organization must, on a monthly basis, provide to the electric utility the total kilowatt-hours of generation attributable to each of the utility's retail electric customers participating in a community solar garden project in accordance with the subscriber's share of the output of the community solar garden.
The subscriber organization shall electronically submit the information and associated documentation to the utility monthly.(b) An electric utility must provide a monetary credit or other compensatory mechanism to a subscriber's monthly electric bill for the proportional output of a community solar garden attributable to that subscriber in the same form and manner as provided for utility-owned community solar gardens.
The subscriber organization shall electronically submit, in a format approved by the commission, the information and associated documentation to the utility monthly.(b) An electric utility must provide a monetary credit or other compensatory mechanism to a subscriber's monthly electric bill for the proportional output of a community solar garden attributable to that subscriber.
The monetary credit must reflect the value per kilowatt-hour of the electric output of the community solar garden as determined in accordance with the community solar garden plan developed under section 4 of this act, and be provided for not less than twenty-five years from the date the community solar garden becomes interconnected and energized.
The monetary credit must be equivalent to the subscriber's applicable retail rate, and be provided for not less than twenty-five years from the date the community solar garden becomes interconnected and energized.
Subscription credits that exceed a subscriber's monthly bill must be carried over and applied to the next month's bill.(4) An electric utility must purchase all unsubscribed electricity generated by a community solar garden in the electric utility's service territory at a rate that reflects the value per kilowatt-hour of the electric output of the community solar garden and for a length of time as determined in accordance with the community solar garden plan developed under section 4 of this act.(5) The number or cumulative generating capacity of community solar garden facilities is not limited under this section.(6) All environmental attributes associated with a community solar garden, including but not limited to renewable energy credits under chapter 19.285 RCW, are considered property of the community solar garden subscribers and may be distributed, sold, accumulated, or retired at the discretion of the community solar garden subscribers.(7) A subscriber organization that is not subject to the requirements under RCW 82.16.170 or 80.28.375 must have a process in place for dispute resolution between the subscriber organization and its subscribers.NEW SECTION.  Sec. 4.  (1) An investor-owned utility must submit a community solar garden plan to the commission by January 1, 2019, in order to operate a community solar garden program.
Subscription credits that exceed a subscriber's monthly bill must be carried over and applied to the next month's bill.(4) An electric utility must purchase all unsubscribed electricity generated by a community solar garden in the electric utility's service territory for a period of not less than twenty-five years at the electric utility's avoided cost rate.(5) The number or cumulative generating capacity of community solar garden facilities is not limited under this section.(6) All environmental attributes associated with a community solar garden, including but not limited to renewable energy credits under chapter 19.285 RCW, are considered property of the community solar garden owner and may be distributed, sold, accumulated, or retired at the discretion of the community solar garden owner.(7) A subscriber organization that is not subject to the requirements under RCW 82.16.170 or 80.28.375 must have a process in place for dispute resolution between the subscriber organization and its subscribers.NEW SECTION.  Sec. 4.  (1) An electrical company must file a plan by January 1, 2019, with the commission to operate a community solar garden program.
The commission may approve, disapprove, or modify a community solar garden plan as submitted by an investor-owned utility.(2) A consumer-owned utility must submit a community solar garden plan to its governing authority by January 1, 2019, in order to operate a community solar garden program.
The commission may approve, disapprove, or modify a community solar garden program plan as submitted by an electrical company.(2) An electric utility that is not an electrical company must file a plan by January 1, 2019, with the department of commerce to operate a community solar garden program.
The governing authority of a consumer-owned utility may approve, disapprove, or modify a community solar garden plan as submitted under this subsection.(3) Any community solar garden plan approved by the commission or the governing authority of a consumer-owned utility under this section must:(a) Reasonably allow for the creation, financing, and accessibility of community solar gardens;(b) Establish uniform standards, fees, and processes for the interconnection of community solar garden facilities that allow the utility to recover reasonable interconnection costs for each community solar garden;(c) Be consistent with the public interest;(d) Identify the information that must be provided to potential subscribers to ensure fair disclosure of future costs and benefits of subscriptions;(e) Include a program implementation schedule;(f) Identify all proposed rules, fees, and charges;(g) Identify the means by which the program will be promoted;(h) Identify the value per kilowatt-hour of the electric output of a community solar garden as calculated in accordance with the principles of a plan developed under subsection (4) of this section;
The department of commerce may approve, disapprove, or modify a community solar garden program plan as submitted under this subsection.(3) Any community solar garden program plan approved by the commission or the department of commerce under this section must:(a) Reasonably allow for the creation, financing, and accessibility of community solar gardens;(b) Establish uniform standards, fees, and processes for the interconnection of community solar garden facilities that allow the utility to recover reasonable interconnection costs for each community solar garden;(c) Be consistent with the public interest;(d) Identify the information that must be provided to potential subscribers to ensure fair disclosure of future costs and benefits of subscriptions;(e) Include a program implementation schedule;(f) Identify all proposed rules, fees, and charges;(g) Identify the means by which the program will be promoted;
and(i) Include a description of the system used to apply credit to each subscriber's monthly bill.(4) In order to develop a community solar garden plan, the electric utility must first engage in a distributed energy resources planning process that accomplishes the following:(a) Identifies the data gaps that impede a robust planning process as well as any upgrades, such as but not limited to advanced metering and grid monitoring equipment, needed to obtain data that would allow the electric utility to quantify the locational and temporal value of resources on the distribution system;(b) Proposes monitoring and metering upgrades that are supported by a business case identifying how those upgrades will be leveraged to provide net benefits for customers;(c) Identifies potential programs and tariffs to fairly compensate customers for the value of their distributed energy resources, which may both produce and consume electricity and capacity from the distribution system individually or in groups, and ensure their optimal usage, including programs targeted at low-income customers;(d) Forecasts, using probabilistic models, the growth of distributed energy resources on the utility's distribution system;(e) Provides, at a minimum, a ten-year plan for distribution system investments and an analysis of nonwires alternatives for major investments.
and(h) Include a description of the system used to apply credit to each subscriber's monthly bill.(4) Within one hundred eighty days of approval of a plan under this section, an electric utility must begin crediting subscriber accounts of each community solar garden facility in its service territory.(5) The commission and department of commerce may coordinate in developing rules as necessary to implement this chapter.
This plan should include a process whereby near-term assumptions regularly inform and adjust the long-term projections of the plan.
To the extent practicable, the commission and the department of commerce must apply the same requirements on community solar garden program plans, regardless of utility type.(6) A subscriber or subscriber organization may not be considered an electric utility solely as a result of participation in a community solar garden program.
The goal of the plan should be to provide the most affordable investments for all customers and avoid reactive expenditures to accommodate unanticipated growth in distributed energy resources.
NEW SECTION.  Sec. 5.  Sections 1 through 4 of this act constitute a new chapter in Title 80 RCW.--- END ---
An analysis that fairly considers wire-based and nonwires alternatives on equal terms is foundational to achieving this goal.
The electric utility should be indifferent to the technology that is used to meet a particular resource need.
The distribution system investment planning process should utilize a transparent approach that involves opportunities for stakeholder input and feedback;(f) Competitively procures the distributed energy resources needs identified in the plan through detailed requests for proposals that identify the specific needs at each identified location.
Competitive procurements that are tailored to solve specific needs, rather than to procure a specific resource, increase an electric utility's ability to identify the lowest cost, most efficient means of meeting distribution system needs.
If the projected cost of a procurement is more than the calculated system net benefit, the electric utility should then establish a pilot process that mimics the efficiencies of a competitive procurement;(g) Includes the distributed energy resources identified in the plan in the electric utility's integrated resource plan developed under this chapter.
Distribution system plans should be used as inputs to the integrated resource planning process.
Distributed energy resources may be used to meet system needs when they are not needed to meet a local distribution need.
Including select distributed energy resources in the integrated resource planning process allows those resources to displace or delay system resources in the integrated resource plan;(h) Includes a high level discussion of how the electric utility is adapting cybersecurity and data privacy practices to the changing distribution system and the internet of things, including an assessment of the costs associated with ensuring customer privacy;(i) Includes a discussion of lessons learned from the planning cycle and identify process and data improvements planned for the next cycle.(5) Within one hundred eighty days of approval of a community solar garden plan under this section, an electric utility must begin crediting subscriber accounts of each community solar garden facility in its service territory.(6) The commission may adopt rules as necessary to implement this chapter.(7) A subscriber or subscriber organization may not be considered an electric utility solely as a result of participation in a community solar garden program.NEW SECTION.  Sec. 5.  Any community solar garden interconnected and energized before the effective date of this section is excluded from the requirements of this chapter.
The requirements of this chapter apply if the community solar garden issues new subscriptions after the effective date of this section.NEW SECTION.  Sec. 6.  Sections 1 through 5 of this act constitute a new chapter in Title 80 RCW.--- END ---
View plain text versions (2)

Action History

  1. Referred to Rules 2 Consideration.

  2. Referred to Rules 2 Consideration.

  3. Rules Committee relieved of further consideration. Placed on second reading.

  4. Rules Committee relieved of further consideration. Placed on second reading.

  5. Referred to Rules 2 Review.

  6. Referred to Rules 2 Review.

  7. Minority; without recommendation.

  8. Minority; do not pass.

  9. TED - Majority; 1st substitute bill be substituted, do pass.

  10. Minority; without recommendation.

  11. Minority; do not pass.

  12. TED - Majority; 1st substitute bill be substituted, do pass.

  13. First reading, referred to Technology & Economic Development (Not Officially read and referred until adoption of Introduction report).

  14. Prefiled for introduction.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 11 co-sponsors · 139 not signed on

Sponsors (1)

  • Morris

Co-sponsors (11)

Not signed on (139)

139 members have not signed on to this bill.

Show all 139 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors HB 2280?
HB 2280 is sponsored by Noel Frame (Democrat), Roger Goodman (Democrat), Hudgins, Shelley Kloba (Democrat), Morris, Cindy Ryu (Democrat), Beth Doglio (Democrat), Lytton, Sharon Tomiko Santos (Democrat), Vandana Slatter (Democrat), Steve Tharinger (Democrat), and Tana Senn (Democrat).
What is the current status of HB 2280?
This bill died with 2017-2018 Regular Session. It reached “Passed House” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track HB 2280?
Track HB 2280 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 2280

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 2280

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →