Illinois 104th General Assembly Status: Introduced 1 R cosponsors

SB2686      — ENERGY PRODUCTION ZONES ACT

Last action — Referred to Assignments

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the Senate. Introduced October 14, 2025. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Odds of enactment

Low chance

Based on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Not enough signal yet

Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Summary

Creates the Energy Production Zones Act. Defines terms. Provides that a project owner is not required to obtain a permit or any other land use or zoning approval from a local authority for the construction of an electric generation facility if: (1) the Illinois Commerce Commission grants the project owner a certificate under the Public Utilities Act for the construction, the Commission declines jurisdiction over the construction under the Public Utilities Act, or the electric generation facility files notice with the Commission to not use a certificate under the Public Utilities Act; (2) the electric generating facility will be located on a premise of land that is an energy production zone; and (3) the project owner complies with other provisions of the Act. Provides that no later than 270 days before beginning construction, a project owner shall provide notice of the construction to the local authority with planning authority for the premise of land on which the construction will occur. Sets forth requirements for the content of the notice. Provides that, no later than 60 days after a project owner's provision of notice, the project owner shall hold a public hearing in the unit of local government in which the electric generation facility will be located, during which the project owner shall provide information to the public and receive public comment regarding the electric generation facility and the construction of the electric generation facility. Makes other changes. Effective immediately.

Bill Text

We don't have the full text on file for this bill yet.

Read SB2686 on the official Illinois source →

Action History

  1. Referred to Assignments

  2. First Reading

  3. Filed with Secretary by Sen. Sue Rezin

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 182 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (182)

182 members have not signed on to this bill.

Show all 182 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB2686      do?
Creates the Energy Production Zones Act. Defines terms. Provides that a project owner is not required to obtain a permit or any other land use or zoning approval from a local authority for the construction of an electric generation facility if: (1) the Illinois Commerce Commission grants the project owner a certificate under the Public Utilities Act for the construction, the Commission declines jurisdiction over the construction under the Public Utilities Act, or the electric generation facility files notice with the Commission to not use a certificate under the Public Utilities Act; (2) the electric generating facility will be located on a premise of land that is an energy production zone; and (3) the project owner complies with other provisions of the Act. Provides that no later than 270 days before beginning construction, a project owner shall provide notice of the construction to the local authority with planning authority for the premise of land on which the construction will occur. Sets forth requirements for the content of the notice. Provides that, no later than 60 days after a project owner's provision of notice, the project owner shall hold a public hearing in the unit of local government in which the electric generation facility will be located, during which the project owner shall provide information to the public and receive public comment regarding the electric generation facility and the construction of the electric generation facility. Makes other changes. Effective immediately.
Who sponsors SB2686     ?
SB2686      is sponsored by Sue Rezin (Republican).
What is the current status of SB2686     ?
This bill has been introduced in the Senate. Introduced October 14, 2025. It must pass committee before a floor vote.
Where can I track SB2686     ?
Track SB2686      free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB2686     

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB2686     

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →