SB2497 — ENERGY-VARIOUS
Last action — Rule 3-9(a) / Re-referred to Assignments
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced February 07, 2025. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Odds of enactment
Low chanceBased on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
Summary
Amends the Illinois Power Agency Act. Adds and modifies definitions of terms. Authorizes the Illinois Power Agency to conduct competitive solicitations to procure contracted energy storage credits sufficient to achieve certain energy storage standards; to request, review, and accept proposals; to execute contracts; and to procure energy storage credits. Requires the Agency to develop a storage procurement plan. Authorizes the Agency to develop and implement a firm energy resource procurement plan. Makes other changes. Amends the Public Utilities Act. Requires each electric utility to demonstrate sufficient resources devoted to interconnection. Requires the Illinois Commerce Commission to perform specified actions regarding interconnection within 90 days after the effective date of the amendatory Act. In a provision regarding virtual power plant programs, requires each electric utility serving more than 300,000 customers as of January 1, 2023 to propose an initial tariff within 60 days after the effective date of the amendatory Act. In a provision regarding peak remediation programs, requires each electric utility serving more than 300,000 retail customers as of January 1, 2023 to propose an initial tariff within 90 days after the effective date of the amendatory Act. Requires the Commission to establish a working group with relevant stakeholders to develop a stand-alone energy storage distribution deployment program. Provides that, beginning on June 1, 2024, the electric utility shall be entitled to recover through tariffed charges all of the costs associated with the purchase of energy storage credits to meet specified energy storage standards. Requires the Agency to prepare an energy storage resources procurement plan for the procurement of energy storage credits. Requires the Commission to establish an Office of Interconnection and Renewable Development, which shall (i) actively seek input from all interested parties and shall develop a thorough understanding and critical analyses of the tools and techniques used to promote development and remove barriers to development of the projects and devices, and (ii) monitor interconnection between electric utilities and applicants for interconnection and interconnection customers. Sets forth reporting requirements for the Office. Makes other changes. Effective immediately.
Bill Text
We don't have the full text on file for this bill yet.
Read SB2497 on the official Illinois source →Action History
-
Rule 3-9(a) / Re-referred to Assignments
-
Added as Co-Sponsor Sen. Graciela Guzmán
-
Rule 2-10 Committee/3rd Reading Deadline Established As June 1, 2025
-
Added as Co-Sponsor Sen. Mary Edly-Allen
-
Rule 2-10 Committee/3rd Reading Deadline Established As May 23, 2025
-
Added as Co-Sponsor Sen. Adriane L. Johnson
-
Rule 2-10 Committee/3rd Reading Deadline Established As May 9, 2025
-
Rule 2-10 Committee Deadline Established As April 11, 2025
-
Rule 2-10 Committee Deadline Established As April 4, 2025
-
Added as Chief Co-Sponsor Sen. David Koehler
-
Assigned to Energy and Public Utilities
-
Referred to Assignments
-
First Reading
-
Filed with Secretary by Sen. Bill Cunningham
Sponsors
- Bill Cunningham · Primary
- David Koehler · Cosponsor
- Adriane L. Johnson · Cosponsor
- Mary Edly-Allen · Cosponsor
- Graciela Guzmán · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 4 co-sponsors · 178 not signed on
Sponsors (1)
- Bill Cunningham Democrat
Co-sponsors (4)
- David Koehler Democrat
- Adriane L. Johnson Democrat
- Mary Edly-Allen Democrat
- Graciela Guzmán Democrat
Not signed on (178)
178 members have not signed on to this bill.
Show all 178 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does SB2497 do?
- Amends the Illinois Power Agency Act. Adds and modifies definitions of terms. Authorizes the Illinois Power Agency to conduct competitive solicitations to procure contracted energy storage credits sufficient to achieve certain energy storage standards; to request, review, and accept proposals; to execute contracts; and to procure energy storage credits. Requires the Agency to develop a storage procurement plan. Authorizes the Agency to develop and implement a firm energy resource procurement plan. Makes other changes. Amends the Public Utilities Act. Requires each electric utility to demonstrate sufficient resources devoted to interconnection. Requires the Illinois Commerce Commission to perform specified actions regarding interconnection within 90 days after the effective date of the amendatory Act. In a provision regarding virtual power plant programs, requires each electric utility serving more than 300,000 customers as of January 1, 2023 to propose an initial tariff within 60 days after the effective date of the amendatory Act. In a provision regarding peak remediation programs, requires each electric utility serving more than 300,000 retail customers as of January 1, 2023 to propose an initial tariff within 90 days after the effective date of the amendatory Act. Requires the Commission to establish a working group with relevant stakeholders to develop a stand-alone energy storage distribution deployment program. Provides that, beginning on June 1, 2024, the electric utility shall be entitled to recover through tariffed charges all of the costs associated with the purchase of energy storage credits to meet specified energy storage standards. Requires the Agency to prepare an energy storage resources procurement plan for the procurement of energy storage credits. Requires the Commission to establish an Office of Interconnection and Renewable Development, which shall (i) actively seek input from all interested parties and shall develop a thorough understanding and critical analyses of the tools and techniques used to promote development and remove barriers to development of the projects and devices, and (ii) monitor interconnection between electric utilities and applicants for interconnection and interconnection customers. Sets forth reporting requirements for the Office. Makes other changes. Effective immediately.
- Who sponsors SB2497 ?
- SB2497 is sponsored by Bill Cunningham (Democrat), David Koehler (Democrat), Adriane L. Johnson (Democrat), Mary Edly-Allen (Democrat), and Graciela Guzmán (Democrat).
- What is the current status of SB2497 ?
- This bill has been introduced in the Senate. Introduced February 07, 2025. It must pass committee before a floor vote.
- Where can I track SB2497 ?
- Track SB2497 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB2497
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB2497
Last checked for changes about 2 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →