SB2196 — POWERING UP ILLINOIS ACT
Last action — Sponsor Removed Sen. Chris Balkema
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced February 07, 2025. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Odds of enactment
Low chanceBased on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
Summary
Creates the Powering Up Illinois Act. Defines terms. Sets forth findings. Requires an electric utility that operates within the State to (i) upgrade the State's electrical distribution systems as needed and in time to achieve the State's decarbonization goals, and implement federal, State, regional, and local air quality and decarbonization standards, plans, and regulations, (ii) conduct sufficient advance planning, engineering, and construction of increased distribution of system capacity by advance ordering transformers and other needed equipment so that customers can be energized without substantial delay, (iii) promptly energize new customers, including by ensuring that new housing, new businesses, and new charging for light-duty, medium-duty, and heavy-duty vehicles and off-road vehicles, vessels, trains, and equipment can be used without delay caused by a failure of the utility to implement energization projects, (iv) promptly upgrade service when needed by customers, (v) allow customers seeking energization to choose an optional flexible connection agreement, which shall provide a tariffed, voluntary utility offering that requires customers to agree to specified service levels as a requirement of energization or interconnection through the use of demand response technology that limits the net import and export of electricity at the point of common coupling to remain within the rated capacity limits of a customer's existing service connection or distribution circuit, either on a permanent basis or to allow for immediate project operations before service or distribution system upgrades are completed, and (vi) recruit, train, and retain an adequately sized and qualified workforce to carry out the planning, engineering, and construction of electrical distribution systems needed to promptly serve customers seeking energization and service upgrades without sacrificing other necessary activities of the workforce. Sets forth provisions concerning: the staffing of an electrification team; electric utility requirements; recovery of costs; and safety standards. Effective immediately.
Bill Text
We don't have the full text on file for this bill yet.
Read SB2196 on the official Illinois source →Action History
-
Sponsor Removed Sen. Chris Balkema
-
Rule 3-9(a) / Re-referred to Assignments
-
Rule 2-10 Committee/3rd Reading Deadline Established As June 1, 2025
-
Rule 2-10 Committee/3rd Reading Deadline Established As May 23, 2025
-
Added as Co-Sponsor Sen. Chris Balkema
-
Rule 2-10 Committee/3rd Reading Deadline Established As May 9, 2025
-
Added as Co-Sponsor Sen. Graciela Guzmán
-
Rule 2-10 Committee Deadline Established As April 11, 2025
-
Assigned to Energy and Public Utilities
-
Added as Co-Sponsor Sen. Mike Simmons
-
Added as Co-Sponsor Sen. Laura M. Murphy
-
Added as Co-Sponsor Sen. Javier L. Cervantes
-
Referred to Assignments
-
First Reading
-
Filed with Secretary by Sen. Adriane L. Johnson
Sponsors
- Adriane L. Johnson · Primary
- Javier L. Cervantes · Cosponsor
- Laura M. Murphy · Cosponsor
- Mike Simmons · Cosponsor
- Graciela Guzmán · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 4 co-sponsors · 178 not signed on
Sponsors (1)
- Adriane L. Johnson Democrat
Co-sponsors (4)
- Javier L. Cervantes Democrat
- Laura M. Murphy Democrat
- Mike Simmons Democrat
- Graciela Guzmán Democrat
Not signed on (178)
178 members have not signed on to this bill.
Show all 178 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does SB2196 do?
- Creates the Powering Up Illinois Act. Defines terms. Sets forth findings. Requires an electric utility that operates within the State to (i) upgrade the State's electrical distribution systems as needed and in time to achieve the State's decarbonization goals, and implement federal, State, regional, and local air quality and decarbonization standards, plans, and regulations, (ii) conduct sufficient advance planning, engineering, and construction of increased distribution of system capacity by advance ordering transformers and other needed equipment so that customers can be energized without substantial delay, (iii) promptly energize new customers, including by ensuring that new housing, new businesses, and new charging for light-duty, medium-duty, and heavy-duty vehicles and off-road vehicles, vessels, trains, and equipment can be used without delay caused by a failure of the utility to implement energization projects, (iv) promptly upgrade service when needed by customers, (v) allow customers seeking energization to choose an optional flexible connection agreement, which shall provide a tariffed, voluntary utility offering that requires customers to agree to specified service levels as a requirement of energization or interconnection through the use of demand response technology that limits the net import and export of electricity at the point of common coupling to remain within the rated capacity limits of a customer's existing service connection or distribution circuit, either on a permanent basis or to allow for immediate project operations before service or distribution system upgrades are completed, and (vi) recruit, train, and retain an adequately sized and qualified workforce to carry out the planning, engineering, and construction of electrical distribution systems needed to promptly serve customers seeking energization and service upgrades without sacrificing other necessary activities of the workforce. Sets forth provisions concerning: the staffing of an electrification team; electric utility requirements; recovery of costs; and safety standards. Effective immediately.
- Who sponsors SB2196 ?
- SB2196 is sponsored by Adriane L. Johnson (Democrat), Javier L. Cervantes (Democrat), Laura M. Murphy (Democrat), Mike Simmons (Democrat), and Graciela Guzmán (Democrat).
- What is the current status of SB2196 ?
- This bill has been introduced in the Senate. Introduced February 07, 2025. It must pass committee before a floor vote.
- Where can I track SB2196 ?
- Track SB2196 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB2196
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB2196
Last checked for changes about 2 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →