Nevada 2025 Regular Session Status: Enacted

AB 502 — Revises provisions relating to public works. (BDR 28-401)

Last action — Chapter 331.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Assembly
  4. ✓
    Passed Senate
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced March 24, 2025. Enacted.

Signed by Governor Joe Lombardo (Republican) on June 05, 2025.

Prognosis

Advancing 50% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

528 added · 566 removed

Plain-language change summary

The main changes in Assembly Bill 502 include the introduction of a new Public Works Compliance Division within the Office of Labor Commissioner, which will focus on enforcing compliance with public works regulations. Additionally, the bill updates the rules around penalties for violations and clarifies the disqualification period for contractors who breach these rules. These changes aim to strengthen oversight and ensure that public contracts are awarded fairly, which is important for maintaining the integrity of projects funded by taxpayer money.

→
Previous
Latest
EXEMPT (Reprinted with amendments adopted on April 17, 2025) FIRST REPRINT A.B.
Assembly Bill No.
502 A SSEMBLY B ILLN O.
502–Committee on Government Affairs CHAPTER..........
502–COMMITTEE ON GOVERNMENT AFFAIRS (O N BEHALF OF THE JOINT NTERIM STANDING C OMMITTEE ON G OVERNMENT A FFAIRS) M ARCH 24, 2025 ____________ Referred to Committee on Government Affairs SUMMARY—Revises provisions relating to public works.
(BDR 28-401) FISCAL NOTE:
Effect on Local Government:
May have Fiscal Impact.
Effect on the State:
Yes.
~ EXPLANATION – Matter in bolded italics is new;
matter between brackets [omitted material] is material to be omitted.
Legislative Counsel’s Digest:
LegiExisting law sets forth the requirements for the State and its political subdivisions to award a contract for the new construction, repair or reconstruction of specified projects that are financed in whole or in part from public money, known as public works.
Existing law sets forth the requirements for the State and its political subdivisions to award a contract for the new construction, repair or reconstruction of specified projects that are financed in whole or in part from public money, known as public works.
(Chapter 338 of NRS) Existing law creates the Office of Labor Commissioner and requires the Labor Commissioner to enforce specified provisions relating to employment on public works.
(Chapter 338 of NRS) Existing law creates the Office of Labor Commissioner and requires the Labor Commissioner to enforce specified 607.010) Existing law requires contractors or subcontractors engaged on public works to use apprentices for a certain percentage of the total hours performed on a - *AB502_R1* – 2 – report certain information regarding the public works for the previous year to the Labor Commissioner, except identifying information about a public work or an apprentice or employee.
(NRS 338.010-338.130, works to use apprentices for a certain percentage of the total hours performed on a public work, depending on certain conditions related to the public work, and to report certain information regarding the public works for the previous year to the Labor Commissioner, except identifying information about a public work or an apprentice or employee.
Existing law further requires a contractor or subcontractor on a public work to maintain and provide to the Labor Commissioner any supporting documentation to show that the contractor or subcontractor made a good faith effort to comply with the apprenticeship requirement.
Existing law further requires a contractor or subcontractor on a public work to maintain and provide to the Labor Commissioner any supporting documentation to show that the contractor or subcontractor made a good includes submitting to an apprenticeship program a request for an apprentice:
Such a good faith effort includes submitting to an apprenticeship program a request for an apprentice:
(1)ort not earlier than 10 days before the contractor or subcontractor is scheduled to begin work on the public work;
(1) not earlier than 10 days before the contractor or subcontractor is scheduled to begin continuously on a public work, not earlier than 10 days before the contractor or subcontractor is scheduled to resume work on the public work.
and (2) if a contractor or subcontractor does not work continuously on a public work, not earlier than 10 days before the contractor or subcontractor is scheduled to resume work on the public work.
(NRS 338.01165) Section 1 of this bill removes the 10-day time limitation on requesting an apprentice, thereby allowing for an apprentice to be requested by a contractor or subcontractor at any time before work on a public work is scheduled to begin or resume.
(NRS 338.01165) Section 1 of this bill increases the 10-day time limitation on requesting an apprentice to 30 days.
Section 1 also removes the exception for not reporting identifying information about a public work, thereby requiring the reporting of such information to the Labor Commissioner.
Section 1 also removes the exception for not reporting information to the Labor Commissioner.
Existing law, in part, requires a public body that undertakes a public work to:
work, thereby requiring the reporting of such Existing law, in part, requires a public body that undertakes a public work to:
number in any advertisement or other type of solicitation;
(1) request an identifying number with a designation of the work and include the number in any advertisement or other type of solicitation;
(NRS 338.013) Section 2 of this bill requires that a public body request such an identifying number not less than 3 business days before any advertisement or other type of solicitation for the public work is published or made, as applicable.
(NRS 338.013) not less than 3 business days before any advertisement or other type of solicitationr - 83rd Session (2025) – 2 – for the public work is published or made, as applicable.
Under existing law, if an administrative penalty is imposed against a person for is authorized to prohibit the person from being awarded a contract for a publicner work:
Under existing law, if an administrative penalty is imposed against a person for a violation of certain provisions relating to public works, the Labor Commissioner is authorized to prohibit the person from being awarded a contract for a public of the administrative penalty;
(1) for the first offense, for a period of 3 years after the date of the imposition of the administrative penalty;
and (2) for the second or subsequent offense, for aosition period of 5 years after the date of the imposition of the administrative penalty.
and (2) for the second or subsequent offense, for a period of 5 years after the date of the imposition of the administrative penalty.
(NRS 338.017) Section 4 of this bill revises the duration of the period of the disqualification as follows:
(NRS 338.017) Section 4 of this bill instead provides for the issuance of a warning for the first offense and revises the duration of the period of the disqualification as follows:
(1) for the first offense, for a period of up to 180 days after the date of the imposition of the administrative penalty;
(1) for the second offense, a period of 180 days after the date of the imposition of the administrative penalty;
(2) for the second offense, for a period of up to 3 years but not less than 180 days after the date of the imposition of the administrative penalty;
(2) for the third offense, a period of 1 year after the date of the imposition of the administrative penalty;
(3) for the third offense, for a period of up to 5 years but not less than 3 years after the date of the imposition of the administrative penalty;
and (3) for the fourth administrative penalty.a period of 3 years after the date of the imposition of the Existing law requires any public body awarding a contract for a public work to investigate possible violations of certain laws relating to public works and determine whether a violation has been committed and inform the Labor Commissioner of any such violations.
and (4) for the fourth or subsequent offense, for a period of not less than 5 years after the date of the imposition of the administrative penalty.
Existing law requires any public body awarding a contract for a public work to investigate possible violations of certain laws relating to public works and determine whether a violation has been committed and inform the Labor Commissioner of any such violations.
(1) conduct an investigation and make a determination regarding any violation;
(1) conduct an investigation and make a determination regarding any created within the Office of Labor Commissioner in section 8 of this bill.
or (2) refer the matter to the Public Works Compliance Division, which is created within the Office of Labor Commissioner in section 8 of this bill.
Section 7 of this bill requires the Division to:
Section 7 laws relating to public works at the direction of the Labor Commissioner or uponrtain receipt of a referral from a public body;
(1) investigate possible violations of certain laws relating to public works at the direction of the Labor Commissioner or upon receipt of a referral from a public body;
and (3) perform any other duties related to the enforcement of certain provisions relating to - *AB502_R1* – 3 – public works, as directed by the Labor Commissioner.
and (3) perform any other duties related to the enforcement of certain provisions relating to public works, as directed by the Labor Commissioner.
Existing law requires a public body to withhold and retain from payments to a contractor on a public work sums that are forfeited as a result of the violation of being withheld, retained or forfeited, except from the final payment, without a full investigation being made by the awarding public body.
Existing law requires a public body to withhold and retain from payments to a contractor on a public work sums that are forfeited as a result of the violation of certain laws relating to public works.
(NRS 338.070) Section 5 requires a public body who refers the investigation of possible offenses to the Division to withhold and retain all sums believed to be forfeited by the violation of such laws until an investigation has been completed by the Division and the Labor Commissioner has determined if any violations were committed.
Existing law also prohibits any sums from being withheld, retained or forfeited, except from the final payment, without a full investigation being made by the awarding public body.
Section 5 investigate possible violations of certain laws relating to a public work or refer possible violations to the Public Works Compliance Division within the prescribed time period:
(NRS 338.070) Section 5 requires a public body who refers the investigation of possible offenses to the Division to withhold and retain all sums believed to be forfeited by the violation of such laws until an investigation has been completed by the Division and the Labor authorizes the Labor Commissioner to impose against a public body that fails to investigate possible violations of certain laws relating to a public work or refer possible violations to the Public Works Compliance Division within the prescribed time period:
Section 5 also prohibits a public body from withholding from any contractor or subcontractor order to recover any fee or penalty assessed against the public body by the Labor Commissioner pursuant to section 5.
Section 5 also prohibits a public body from withholding from any contractor or subcontractor engaged on a public work any amount due to the contractor or subcontractor in order to recover any fee or penalty assessed against the public body by the Labor Commissioner pursuant to section 5.
- 83rd Session (2025) – 3 – EXPLANATION – Matter in bolded italics is new;
matter between brackets [omitted material] is material to be omitted.
2.
except as otherwise provided in this section, a contractor ord subcontractor engaged in horizontal construction who employs workers on one or more public works during a calendar year pursuant to NRS 338.040 shall use one or more apprentices for at least 3 percent, or any increased percentage established pursuant to subsection 3, of the total hours of labor worked for each apprenticed craft or type of work to be performed on those public works.
Show all 99 changed rows (59 more)
Previous
Latest
Notwithstanding any other provision of this chapter and except as otherwise provided in this section, a contractor or subcontractor engaged in horizontal construction who employs workers on one or more public works during a calendar year pursuant to NRS 338.040 shall use one or more apprentices for at least 3 percent, or any increased percentage established pursuant to subsection 3, of the total hours of labor worked for each apprenticed craft or type of work to be performed on those public works.
On or after January 1, 2021, the Labor Commissioner, in collaboration with the State Apprenticeship Council, may adopt regulations to increase the percentage of total hours of labor - *AB502_R1* – 4 – required to be performed by an apprentice pursuant to subsection 1 or 2 by not more than 2 percentage points.
On or after January 1, 2021, the Labor Commissioner, in collaboration with the State Apprenticeship Council, may adopt regulations to increase the percentage of total hours of labor required to be performed by an apprentice pursuant to subsection 1 or 2 by not more than 2 percentage points.
If a contractor or subcontractor who is a signatory to a collective bargaining agreement with a union that sponsors an apprenticeship program for an apprenticed craft or type of work for which the term of apprenticeship is not more than 3 years requests an apprentice from that apprenticeship program and an apprentice in the appropriate craft or type of work is not available, the contractor or subcontractor may utilize a person who graduated from the apprenticeship program in that craft or type of work within the 3 years immediately preceding the request from the contractor or subcontractor.
If a contractor or subcontractor who is a signatory to a collective bargaining agreement with a union that sponsors an which the term of apprenticeship is not more than 3 years requestsr an apprentice from that apprenticeship program and an apprentice in the appropriate craft or type of work is not available, the contractor - 83rd Session (2025) – 4 – apprenticeship program in that craft or type of work within the 3 years immediately preceding the request from the contractor or subcontractor.
A contractor or subcontractor engaged on a public work shall maintain and provide to the Labor Commissioner any supporting documentation to show that the contractor or subcontractor made a good faith effort to comply with subsection 1 or 2, as applicable, as determined by the Labor Commissioner.
A contractor or subcontractor engaged on a public work shall maintain and provide to the Labor Commissioner any supporting documentation to show that the contractor or subcontractor made a good faith effort to comply with subsection 1 purposes of this subsection, a contractor or subcontractor:r.
For purposes of this subsection, a contractor or subcontractor:
For (a) Makes a good faith effort to comply with subsection 1 or 2, as applicable, if the contractor or subcontractor:
(a) Makes a good faith effort to comply with subsection 1 or 2, as applicable, if the contractor or subcontractor:
(1) Submits to the apprenticeship program, on the form prescribed by the Labor Commissioner, a request for an apprentice not earlier than [10] 30 days before the contractor or subcontractor is scheduled to begin work on the public work and not later than 5 days after the contractor or subcontractor actually begins work on the public work.
(1) Submits to the apprenticeship program, on the form prescribed by the Labor Commissioner, a request for an apprentice [not earlier than 10 days] before the contractor or subcontractor is scheduled to begin work on the public work and not later than 5 days after the contractor or subcontractor actually begins work on the public work.
(2) If the apprenticeship program does not provide an apprentice for the appropriate apprenticed craft or type of work upon a request pursuant to subparagraph (1), submits additional requests to the apprenticeship program, on the form prescribed by the Labor Commissioner, at least once every 30 days during the period that the contractor or subcontractor is working on the public on the public work, the contractor or subcontractor shall submit an additional request each time that the contractor or subcontractor resumes work on the public work not earlier than [10] 30 days before the contractor or subcontractor is scheduled to resume work on the public work and not later than 5 days after the contractor or subcontractor actually resumes work on the public work.
(2) If the apprenticeship program does not provide an apprentice for the appropriate apprenticed craft or type of work - *AB502_R1* – 5 – upon a request pursuant to subparagraph (1), submits additional requests to the apprenticeship program, on the form prescribed by the Labor Commissioner, at least once every 30 days during the period that the contractor or subcontractor is working on the public work.
The requirement for the submission of an additional request in this subparagraph does not apply whenever a contractor or subcontractor - 83rd Session (2025) – 5 – has one or more apprentices employed for that apprenticed craft or type of work.
If a contractor or subcontractor does not work continuously on the public work, the contractor or subcontractor shall submit an additional request each time that the contractor or subcontractor resumes work on the public work [not earlier than 10 days] before the contractor or subcontractor is scheduled to resume work on the public work and not later than 5 days after the contractor or subcontractor actually resumes work on the public work.
(b) Does not make a good faith effort to comply with subsection or 2, as applicable, as determined by the Labor Commissioner, if apprenticeship agreement pursuant to subsection 16 and refuses to do so.
The requirement for the submission of an additional request in this subparagraph does not apply whenever a contractor or subcontractor has one or more apprentices employed for that apprenticed craft or type of work.
(b) Does not make a good faith effort to comply with subsection 1 or 2, as applicable, as determined by the Labor Commissioner, if the contractor or subcontractor is required to enter into an apprenticeship agreement pursuant to subsection 16 and refuses to do so.
(b) For each apprenticed craft or type of work, the total number of hours worked on horizontal construction.
of hours worked on horizontal construction.f work, the total number (c) For each apprenticed craft or type of work, the total number of hours worked by apprentices on vertical construction.
(c) For each apprenticed craft or type of work, the total number of hours worked by apprentices on vertical construction.
(d) For each apprenticed craft or type of work, the total number of hours worked by apprentices on horizontal construction.
- *AB502_R1* – 6 – (d) For each apprenticed craft or type of work, the total number of hours worked by apprentices on horizontal construction.
12.
- 83rd Session (2025) – 6 – based on a complaint, makes a determination based on theiative or information submitted pursuant to subsection 10 that a contractor or subcontractor did not make a good faith effort to comply with the provisions of subsection 1 or 2, as applicable, the Labor Commissioner shall notify the contractor or subcontractor in writing of the determination and:
If the Labor Commissioner, on his or her own initiative or based on a complaint, makes a determination based on the information submitted pursuant to subsection 10 that a contractor or subcontractor did not make a good faith effort to comply with the provisions of subsection 1 or 2, as applicable, the Labor Commissioner shall notify the contractor or subcontractor in writing of the determination and:
(II) More than 4 percent but less than 7.5 percent of the total hours of labor worked for an apprenticed craft or type of work, a penalty of $3,000 or $4 for each hour below the percentage required, whichever is higher.
(II) More than 4 percent but less than 7.5 percent of the total hours of labor worked for an apprenticed craft or type of work, required, whichever is higher.each hour below the percentage (III) Four percent or less of the total hours of labor worked for an apprenticed craft or type of work, a penalty of $5,000 or $6 for each hour below the percentage required, whichever is higher.
(III) Four percent or less of the total hours of labor worked for an apprenticed craft or type of work, a penalty of $5,000 or $6 for each hour below the percentage required, whichever is higher.
- *AB502_R1* – 7 – (III) One percent or less of the total hours of labor worked for an apprenticed craft or type of work, a penalty of $5,000 or $6 for each hour below the percentage required, whichever is higher.
for an apprenticed craft or type of work, a penalty of $5,000 or $6ked for each hour below the percentage required, whichever is higher.
13.
- 83rd Session (2025) – 7 – 13.
Except for good cause, the Labor Commissioner may not initiate his or her own investigation or accept a complaint based on the information submitted by a contractor or subcontractor pursuant to subsection 10 after May 1 immediately following the date on which the report was received by the Labor Commissioner.
Except for good cause, the Labor Commissioner may not initiate his or her own investigation or accept a complaint based on the information submitted by a contractor or subcontractor pursuant to subsection 10 after May 1 immediately following the date on whi14.
14.
A contractor or subcontractor who is not a signatory to a collective bargaining agreement with the union sponsoring the apprenticeship program for an apprenticed craft or type of work engaged on a public work shall enter into an apprenticeship agreement for each apprentice required to be used in the construction of a public work.
A contractor or subcontractor who is not a signatory to a collective bargaining agreement with the union sponsoring the engaged on a public work shall enter into an apprenticeshipwork agreement for each apprentice required to be used in the construction of a public work.
- *AB502_R1* – 8 – (b) “Apprenticed craft or type of work” means a craft or type of work for which there is an existing apprenticeship program recognized by the State Apprenticeship Council.
(b) “Apprenticed craft or type of work” means a craft or type of work for which there is an existing apprenticeship program recognized by the State Apprenticeship Council.
Sec.
- 83rd Session (2025) – 8 – Sec.
A public body that undertakes a public work shall request from the Labor Commissioner [, and include in any advertisement or other type of solicitation,] an identifying number with a designation of the work [.] not less than 3 business days before any advertisement or other type of solicitation is published or made for the public work.
A public body that undertakes a public work shall request from the Labor Commissioner [, and include in any advertisement or other type of solicitation,] an identifying number before any advertisement or other type of solicitation is published or made for the public work.
If a public body fails to comply with subsection 2 or 4, the Labor Commissioner may impose against the public body a penalty of $50 for each calendar day or portion thereof that the public body is not in compliance.
If a public body fails to comply with subsection 2 or 4, the Labor Commissioner may impose against the public body a public body is not in compliance.day or portion thereof that the Sec.
Sec.
If any administrative penalty is imposed pursuant to this chapter against a [person] contractor or subcontractor for the commission of an offense, [that person,] the Labor Commissioner may take the following actions against the contractor or subcontractor and the corporate officers, if any, of - *AB502_R1* – 9 – [that person, may not be awarded a contract for a public work:] the contractor or subcontractor:
If any administrative penalty is imposed pursuant to this chapter against a [person] contractor or subcontractor for the commission of an offense, [that person,] the Labor Commissioner may disqualify the contractor or subcontractor and the corporate officers, if any, of [that person, may not be awarded a contract for a public work:] the contractor or subcontractor from being awarded a contract for a public work or entering into a contract to perform work on a public work:
(a) [For] Issue a warning for the first offense .
(a) For the first offense, for a period of up to 180 days after the date of the imposition of the administrative penalty;
[,] (b) Disqualify the contractor or subcontractor and any corporate officers thereof from being awarded a contract for a public work or entering into a contract to perform work on a public work, as applicable:
- 83rd Session (2025) – 9 – (b) For the second offense, for a period of up to 3 years but not less than 180 days after the date of the imposition of the administrative penalty;
(1) For the second offense, for a period of [3 years] 180 days after the date of the imposition of the administrative penalty;
[and (b)] (c) For the third offense, for a period of up to 5 years but administrative penalty;
[and (b)] (2) For the third offense, for a period of 1 year after the date of the imposition of the administrative penalty;
and the date of the imposition of the (d) For the [second] fourth or subsequent offense, for a period of not less than 5 years after the date of the imposition of the administrative penalty.
and (3) For the [second] fourth or subsequent offense, for a period of [5] 3 years after the date of the imposition of the administrative penalty.
A person, and the corporate officers, if any, of that person, who is identified in the System for Award Management Exclusions operated by the General Services Administration as being excluded from receiving contracts from the Federal Government pursuant to 48 C.F.R.
A person, and the corporate officers, if any, of that person, who is identified in the System for Award Management Exclusions operated by the General Services Administration as being excluded from receiving contracts from the Federal Government pursuant to C.F.R.
338.070 1.
within 90 days after substantial completion of the contract:[:] , (a) Investigate possible violations of the provisions of NRS 338.010 to 338.090, inclusive, committed in the course of the execution of the contract, and determine whether a violation has been committed and inform the Labor Commissioner of any such violations;
Any public body awarding a contract shall [:] , within 90 days after substantial completion of the contract:
(a) Investigate possible violations of the provisions of NRS 338.010 to 338.090, inclusive, committed in the course of the execution of the contract, and determine whether a violation has been committed and inform the Labor Commissioner of any such violations;
- *AB502_R1* – 10 – 2.
2.
[2.] No sum may be withheld, retained or forfeited, except from the final payment, without a full investigation being made by the awarding public body [.] or the Public Works Compliance Division pursuant to section 7 of this act.
- 83rd Session (2025) – 10 – from the final payment, without a full investigation being made by the awarding public body [.] or the Public Works Compliance Division pursuant to section 7 of this act.
(1) Whether the worker wishes to specify voluntarily his or her gender;
her gender;
and (2) Whether the worker wishes to specify voluntarily his or her ethnicity;
andher the worker wishes to specify voluntarily his or (2) Whether the worker wishes to specify voluntarily his or her ethnicity;
Before inquiring as to whether a worker wishes to specify voluntarily his or her gender or ethnicity, the applicable contractor or subcontractor must inform the worker that such information, if provided, will be open to public inspection as set forth in subsection 6.
Before inquiring as to whether a worker wishes to specify voluntarily his or her gender or ethnicity, that such information, if provided, will be open to public inspection as set forth in subsection 6.
- *AB502_R1* – 11 – (a) An accurate record showing, for each worker employed by the contractor or subcontractor in connection with the public work:
(a) An accurate record showing, for each worker employed by the contractor or subcontractor in connection with the public work:
(3) The gender of the worker, if the worker voluntarily agreed to specify that information pursuant to subsection 4, or an entry indicating that the worker declined to specify such information;
- 83rd Session (2025) – 11 – agreed to specify that information pursuant to subsection 4, or an entry indicating that the worker declined to specify such information;
(2) The driver’s license number or identification card number of the worker;
of the worker;
and (3) The state or other jurisdiction that issued the license or card.
andver’s license number or identification card number (3) The state or other jurisdiction that issued the license or card.
The records in the possession of the public body awarding the contract may be discarded by the public body 2 years after final payment is made by the public body for the public work.
The records in the possession of the public body awarding the contract may be discarded by the public body 2 years The Labor Commissioner shall adopt regulations authorizing andwork.
The Labor Commissioner shall adopt regulations authorizing and prescribing the procedures for the electronic filing of the copies of the records required to be provided monthly by a contractor or subcontractor to a public body pursuant to this subsection.
prescribing the procedures for the electronic filing of the copies of the records required to be provided monthly by a contractor or subcontractor to a public body pursuant to this subsection.
A contractor engaged on a public work shall not withhold from a subcontractor engaged on the public work the sums necessary to cover any penalties provided pursuant to subsection 3 - *AB502_R1* – 12 – of NRS 338.060 that may be withheld from the contractor by the public body awarding the contract because the public body did not receive a copy of the record maintained by the subcontractor pursuant to subsection 5 for a calendar month by the time specified in subsection 6 if:
A contractor engaged on a public work shall not withhold from a subcontractor engaged on the public work the sums necessary to cover any penalties provided pursuant to subsection 3 of NRS 338.060 that may be withheld from the contractor by the public body awarding the contract because the public body did not - 83rd Session (2025) – 12 – receive a copy of the record maintained by the subcontractor pursuant to subsection 5 for a calendar month by the time specified in subsection 6 if:
(a) The subcontractor provided to the contractor, for submission to the public body by the contractor, a copy of the record not later than the later of:
(a) The subcontractor provided to the contractor, for submission than the later of:
(1) Ten days after the end of the month;
by the contractor, a copy of the record not later (1) Ten days after the end of the month;
A public body shall not withhold from a contractor or subcontractor engaged on a public work any amount due to the contractor or subcontractor in order to recover any fee or penalty assessed by the Labor Commissioner pursuant to subsection 9.
A public body shall not withhold from a contractor or contractor or subcontractor in order to recover any fee or penalty assessed by the Labor Commissioner pursuant to subsection 9.
and - *AB502_R1* – 13 – (b) Submit to the Labor Commissioner a written report concerning an investigation conducted pursuant to paragraph (a).
and - 83rd Session (2025) – 13 – (b) Submit to the Labor Commissioner a written report concerning an investigation conducted pursuant to paragraph (a).
The Office consists of the Labor Commissioner and the Public Works Compliance Division.
The Office consists of the Labor Commissioner and the Public WorSec.
Sec.
9.liaNRS 607.060 is hereby amended to read as follows:
9.
NRS 607.060 is hereby amended to read as follows:
H - *AB502_R1*
~~~~~ 25 - 83rd Session (2025)
View plain text versions (4)

Amendments

2 amendments

Click Show changes on an amendment above to see how it modifies the bill.

Action History

  1. Chapter 331.

  2. Approved by the Governor.

  3. Enrolled and delivered to Governor.

  4. In Assembly. Senate Amendment No. 914 concurred in. To enrollment.

  5. From printer. To re-engrossment. Re-engrossed. Second reprint. Read third time. Passed, as amended. Title approved. (Yeas: 21, Nays: None.) To Assembly.

  6. From committee: Amend, and do pass as amended. Placed on Second Reading File. Read second time. Amended. (Amend. No. 914.) To printer.

  7. From committee: Do pass, as amended. Placed on General File. Read third time. Passed, as amended. Title approved. (Yeas: 39, Nays: 2, Excused: 1.) To Senate. In Senate. Read first time. Referred to Committee on Government Affairs. To committee.

  8. From printer. To engrossment. Engrossed. First reprint. To committee.

  9. Read second time. Amended. (Amend. No. 284.) Taken from General File. Rereferred to Committee on Ways and Means. To printer.

  10. From committee: Amend, and do pass as amended.

  11. Notice of exemption.

  12. From printer. To committee.

  13. Read first time. Referred to Committee on Government Affairs. To printer.

Sponsors

  • Assembly Committee on Government Affairs · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 66 not signed on

Sponsors (1)

  • Assembly Committee on Government Affairs

Co-sponsors (0)

None.

Not signed on (66)

66 members have not signed on to this bill.

Show all 66 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors AB 502?
AB 502 is sponsored by Assembly Committee on Government Affairs.
What is the current status of AB 502?
This bill has been enacted into law. Introduced March 24, 2025. Enacted.
Where can I track AB 502?
Track AB 502 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 502

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 502

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →