Nevada 2025 Regular Session Status: Enacted

SB 502 — Authorizes and provides funding for certain projects of capital improvement. (BDR S-1233)

Last action — Chapter 515.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. ✓
    Passed Assembly
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced May 19, 2025. Enacted.

Signed by Governor Joe Lombardo (Republican) on June 10, 2025.

Prognosis

Likely to advance 70% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

  • Cleared a recorded vote

    Passed 2 recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

845 added · 916 removed

845 line(s) added, 916 removed.

→
Previous
Latest
REQUIRES TWO-THIRDS MAJORITY VOTE (§ 21) EXEMPT (Reprinted with amendments adopted on May 27, 2025) FIRST REPRINT S.B.
Senate Bill No.
502 SENATE BILLN O .
502–Committee on Finance CHAPTER..........
502–COMMITTEE ON F INANCE M AY 19, 2025 ____________ Referred to Committee on Finance SUMMARY—Authorizes and provides funding for certain projects of capital improvement.
(BDR S-1233) FISCAL NOTE:
Effect on Local Government:
No.
Effect on the State:
Contains Appropriation included in Executive Budget.
~ EXPLANATION – Matter in bolded italics is new;
matter between brackets [omitted material] is material to be omitted.
EXPLANATION – Matter in bolded italics is new;
matter between brackets [omitted material] is material to be omitted.
There is hereby appropriated from the State General Fund to the State Public Works Division of the Department of Administration the sum of $99,514,255 to support the Division in carrying out the program of capital improvements as summarized in this section.
There is hereby appropriated from the State General Fund to the State Public Works Division of the Department of Administration the sum of $99,514,255 to support the Division in carrying out the program of capital improvements as summarized in described in the Executive Budget for the 2025-2027 biennium or otherwise described as follows:
The amount is allocated to projects numbered and described in the Executive Budget for the 2025-2027 biennium or otherwise described as follows:
Intermediate-Care Facility Building Purchases, Las Vegas........................................$7,500,0000 Advance Planning, HVAC and Site Sanitary Sewer Piping, Arrowhead Building.......................25-P0$977,919 - *SB502_R1* – 2 – Description Project No.
Intermediate-Care Facility Building Purchases, Las Vegas..........................................$7,500,000 Advance Planning, HVAC and Site Sanitary Sewer Piping, Arrowhead Building.......................25-P03 $977,919 Advance Planning, State Office Buildings, Capital Complex...........25-P08 $6,234,392 Statewide ADA Program.....................25-S02 $6,723,478 Statewide Fire and Life Safety Program........................................$4,068,049 Statewide Advance Planning Program........................................$2,088,656 Statewide Paving Program ..................25-S05 $5,924,427 Statewide Indoor Air Quality, Environmental Program.................25-S06 $201,838 Statewide Elevator Program................25-S07 $8,093,770 2.
Amount Advance Planning, State Office Buildings, Capital Complex...........25-P08 $6,234,392 Statewide ADA Program.....................25-S02$6,723,478 Statewide Fire and Life Safety Program......................................$4,068,049 Statewide Advance Planning Program......................................$2,088,656 Statewide Paving Program ..................25-S0$5,924,427 Statewide Indoor Air Quality, Environmental Program.................25-S06 $201,838 Statewide Elevator Program................25-S07$8,093,770 2.
HVAC System Renovation, Measurement Standards Building.....................................$1,359,582 Security Improvements, Interior Lighting and Power Distribution, Measurement Standards Building.......................
- 83rd Session (2025) – 2 – Description Project No.
25-M$951,046 3.
Amount HVAC System Renovation, Measurement Standards Building.......................................$1,359,582 SecLighting and Power, Interior Distribution, Measurement Standards Building.......................
25-M14$951,046 3.
HVAC System Replacement and Arc Flash Study, Data Center........................................$750,00013 4.
HVAC System Replacement and Arc Flash Study, Data Center..........................................$750,000 4.
Advance Planning, Culinary, Bakery and Laundry Building, Northern Nevada Correctional Center........................25$2,596,565 Facility Maintenance, Department of Corrections...........
Advance Planning, Culinary, Bakery and Laundry Building, Northern Nevada Correctional Center........................25-P$2,596,565 Facility Maintenance, Department of Corrections...........
25-M$10,321,349 5.
25-M15$10,321,349 5.
Facility Maintenance, Department of Human Services...................................$21,944,8992 6.
Facility Maintenance, Department of Human 6.
Capital Improvements for the Office of the Military:
Capital Improvements for the Office of the Military:44,899 Advance Planning, Camp Washoe Renovation, Nevada Army National Guard.....................25-P05 $1,200,108 Advance Planning, Civil Service Team Facility, Nevada Army National Guard...............................25-$310,810 Power Distribution and Lighting, Office of Adjutant General Building, Lawrence E.
Advance Planning, Camp Washoe Renovation, Nevada Army National Guard.....................25-P0$1,200,108 - *SB502_R1* – 3 – Description Project No.
Amount Advance Planning, Civil Service Team Facility, Nevada Army National Guard...............................2$310,810 Power Distribution and Lighting, Office of Adjutant General Building, Lawrence E.
25-$2,767,516 Re-roof Combined Support Maintenance Shop 2, Nevada Army National Guard...................25-S01g $574,196 Pavement Maintenance and Rehabilitation, Plumb Lane Readiness Center..........................25-S05$83,863 7.
25-M0$2,767,516 Re-roof Combined Support Maintenance Shop 2, Nevada Army National Guard...................25-S01g $574,196 - 83rd Session (2025) – 3 – Description Project No.
Capital Improvements for the Nevada System of Higher Education:
Amount Pavement Maintenance and Rehabilitation, Plumb Lane Readiness Center..........................25-S05g $83,863 Education:ital Improvements for the Nevada System of Higher Deferred Maintenance, Nevada System of Higher Education ........
Deferred Maintenance, Nevada System of Higher Education ........
HVAC System Replacement, Nevada State Museum Las Vegas........................................$2,267,1392 9.
HVAC System Replacement, Nevada State Museum Las Vegas..........................................$2,267,139 9.
25-M18 $1,315,815 Water Softener Replacement, Southern Nevada Veterans Home..........................................$274,0541 10.
25-M18 $1,315,815 Water Softener Replacement, Southern Nevada Veterans Home............................................$274,054 10.
Residential Water Intrusion Repairs, Key Pittman Wildlife Management Area..........
Residential Water Intrusion Repairs, Key Pittman Sec.
25-M23 $294,184 Sec.
2.ildAny remaining balance of any appropriation made by84 section 1 of this act must not be committed for expenditure after June 30, 2029, by the entity to which the appropriation is made or any entity to which money from the appropriation is granted or otherwise transferred in any manner, and any portion of the appropriated money remaining must not be spent for any purpose after September 21, 2029, by either the entity to which the money was appropriated or the entity to which the money was subsequently granted or transferred, and must be reverted to the State General Fund on or before September 21, 2029.
2.
Any remaining balance of any appropriation made by section 1 of this act must not be committed for expenditure after June 30, 2029, by the entity to which the appropriation is made or any entity to which money from the appropriation is granted or otherwise transferred in any manner, and any portion of the appropriated money remaining must not be spent for any purpose after September 21, 2029, by either the entity to which the money - *SB502_R1* – 4 – was appropriated or the entity to which the money was subsequently granted or transferred, and must be reverted to the State General Fund on or before September 21, 2029.
The amount is allocated to projects numbered and described in the Executive Budget for the 2025-2027 biennium or otherwise described as follows:
The amount is allocated to projects numbered and - 83rd Session (2025) – 4 – described in the Executive Budget for the 2025-2027 biennium or otherwise described as follows:
Facility Maintenance, Department of Administration, Highway Fund.........................................$4,241,449h Statewide Paving Program, Highway Fund..............................25-S$911,014 East Wing Elevator Modernization, Department of Motor Vehicles, Carson City..........................................$607,760S07h 2.
FaciDepartment ofnce, Administration, Highway Fund..........................................$4,241,449 Statewide Paving Program, Highway Fund..............................25-S05$911,014 East Wing Elevator Modernization, Department of Motor Vehicles, Carson City............................................$607,7607h 2.
25-M$745,652 Replace Surveillance Cameras, Department of Motor Vehicles, Sahara...........................
25-M20$745,652 Replace Surveillance Cameras, Department of Motor Vehicles, Sahara...........................
2$1,600,751 ADA Site Concrete Replacement, Department of Motor Vehicles, Carson City........25-S02h $594,765 3.
25$1,600,751 ADA Site Concrete Replacement, Department of Motor Vehicles, Carson City........25-S02h $594,765 3.
Evidence Impound Lot Expansion, Department of Public Safety, Training..................25-C$1,176,947 Sec.
Evidence Impound Lot Public Safety, Training..................25-C2$1,176,947 Sec.
Show all 156 changed rows (116 more)
Previous
Latest
Any remaining balance of any appropriation made by section 3 of this act must not be committed for expenditure after June 30, 2029, by the entity to which the appropriation is made or any entity to which money from the appropriation is granted or otherwise transferred in any manner, and any portion of the appropriated money remaining must not be spent for any purpose after September 21, 2029, by either the entity to which the money was appropriated or the entity to which the money was subsequently - *SB502_R1* – 5 – granted or transferred, and must be reverted to the State Highway Fund on or before September 21, 2029.
Any remaining balance of any appropriation made by section 3 of this act must not be committed for expenditure after June 30, 2029, by the entity to which the appropriation is made or any entity to which money from the appropriation is granted or otherwise transferred in any manner, and any portion of the appropriated money remaining must not be spent for any purpose after September 21, 2029, by either the entity to which the money was appropriated or the entity to which the money was subsequently granted or transferred, and must be reverted to the State Highway Fund on or before September 21, 2029.
The amounts appropriated by section 3 of this act from the State Highway Fund must be allocated by the State Controller as the money is required for the projects listed in section 3 of this act and must not be transferred to those projects until required to make contract payments.
The amounts appropriated by section 3 of this act from the State Highway Fund must be allocated by the State Controller as the money is required for the projects listed in section 3 of this act - 83rd Session (2025) – 5 – and must not be transferred to those projects until required to make contract payments.
The State Board of Finance shall issue general obligation bonds of the State of Nevada in the face amount of not more than $799,271,288 for capital improvements summarized in this section and use proceeds of general obligation bonds of the State of Nevada previously issued in the amount of $1,692,000 which are reallocated for capital improvements summarized in this section.
The State Board of Finance shall issue general obligation bonds of the State of Nevada in the face amount of not this section and use proceeds of general obligation bonds of the State of Nevada previously issued in the amount of $1,692,000 which are reallocated for capital improvements summarized in this section.
Hobart Dam Rehabilitation, Marlette Lake Water System.........25-C05 $14,589,720 State Office Buildings Purchase and Improvements, Las Vegas......................................$71,157,88926 State Office Building Purchase, Reno.......................................$22,240,00027 Facilities Maintenance, Department of Administration.............................$18,354,424 Building Repairs and West Plaza Replacement, Nevada State Library and Archives...........
HobaMarlette Lake Water System.........25-C05 $14,589,720 State Office Buildings Purchase and Improvements, Las Vegas.........................................$71,157,889 State Office Building Purchase, Reno..........................................$22,240,000 Facilities Maintenance, Department of Administration..............................
25-M0$12,416,436 - *SB502_R1* – 6 – Description Project No.
2$18,354,424 Building Repairs and West Plaza Replacement, Nevada State Library and Archives...........
Amount Statewide Roofing Program ................25-S$11,655,718 Statewide Fire and Life Safety Program, Nevada National Guard........................................$4,736,183g 2.
25-M08 $12,416,436 Statewide Roofing Program ................25-S01 $11,655,718 - 83rd Session (2025) – 6 – Description Project No.
Capital Improvements for the Governor’s Technology Office:
Amount Statewide Fire and Life Safety Program, Nevada National Guard.........................................$4,736,183 Office:Capital Improvements for the Governor’s Technology HVAC System Replacement and Arc Flash Study, Data Center........................................$5,000,974 Raised Server Room Floor Replacement, Data Center............
HVAC System Replacement and Arc Flash Study, Data Center.......................................$5,000,9743 Raised Server Room Floor Replacement, Data Center............
Replacement of Emergency Spillway Gate and Primary Outlet Gates, South Fork Dam..........................................$1,956,4190 4.
Replacement of Emergency Spillway Gate and Primary Outlet Gates, South Fork Dam...........................................$1,956,419 4.
Recreational Yards Upgrade, Ely State Prison.............................$2,814,398 Recreational Yard Enclosure Replacement, High Desert State Prison.................................$6,148,299 Recreational Yard Enclosures, Lovelock Correctional Center.......................................$5,724,4549 Facilities Maintenance, Department of Corrections...........
Recreational Yards Upgrade, Ely State Prison.............................2$2,814,398 Recreational Yard Enclosure Replacement, High Desert State Prison..................................$6,148,299 Recreational Yard Enclosures, Lovelock Correctional Center........................................$5,724,454 Facilities Maintenance, Evaporative Coolingorrections...........
25-M04$26,952,444 Evaporative Cooling Replacement for Housing Units 1 – 12, High Desert State Prison...............................$58,858,210 Underground Piping Replacement, High Desert State Prison...............................$22,760,463 Culinary Renovation, Lovelock Correctional Center......................
25-M04 $26,952,444 Replacement for Housing Units 1 – 12, High Desert State Prison.................................$58,858,210 Underground Piping Replacement, High Desert State Prison.................................$22,760,463 Culinary Renovation, Lovelock Correctional Center......................
2$10,799,516 5.
25-$10,799,516 5.
Southern Nevada Forensic Facility, Las Vegas.......................$381,797,319 Desert Regional Center Facilities, Las Vegas .....................$38,023,299 - *SB502_R1* – 7 – Description Project No.
Southern Nevada Forensic Facility, Las Vegas........................2$381,797,319 Desert Regional Center Facilities, Las Vegas .....................25$38,023,299 - 83rd Session (2025) – 7 – Description Project No.
Parking Apron Expansion, Nevada Air National Guard...........25-C06 $235,660 7.
Parking Apron Expansion, Nevada Air National Guard...........25-C06 $235,660 Cultural Affairs:provements for the Department of Tourism and Humidifier Reverse Osmosis System, Nevada State Museum, Las Vegas.....................
Capital Improvements for the Department of Tourism and Cultural Affairs:
Humidifier Reverse Osmosis System, Nevada State Museum, Las Vegas.....................
Exterior Quad Lighting, Stewart Facility......................................$427,880C21 9.
Exterior Quad Lighting, Stewart Facility........................................$427,8801 9.
North Las Vegas State Veterans Home.......................................$78,113,4473 Cemetery Committal Building Utility Extension Supplemental Funding, Northern Nevada Veterans Memorial Cemetery ......................25-C0$2,708,518 Sec.
North Las Vegas State Veterans Home.........................................$78,113,447 Cemetery Committal Building Utility Extension Supplemental Funding, Northern Nevada Veterans Memorial Cemetery ......................25-C08$2,708,518 Sec.
Any remaining balance of the allocated amounts authorized in section 6 of this act must not be committed for expenditure after June 30, 2029, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 21, 2029.
Any remaining balance of the allocated amounts authorized in section 6 of this act must not be committed for expenditure after June 30, 2029, and must be reverted to the Bond and Redemption Fund on or before September 21, 2029.Bond Interest Sec.
Sec.
- *SB502_R1* – 8 – Description Project No.
- 83rd Session (2025) – 8 – Description Project No.
Central Services and Records Division Renovation, Department of Motor Vehicles, Carson City....................25-$4,853,287 Renovate Customer Counter Casework, Department of Motor Vehicles, Decatur.....................25-$1,865,510 2.
Central Services and Records Division Renovation, Vehicles, Carson City....................25-C17$4,853,287 Renovate Customer Counter Casework, Department of Motor Vehicles, Decatur.....................25-C1$1,865,510 2.
The Legislature intends that the annual bond repayment costs of the bonds authorized by subsection 1, and any bonds directly or indirectly, through a series of refundings, refunding those bonds, will be paid from annually available money in the State Highway Fund.
The Legislature intends that the annual bond repayment costs of the bonds authorized by subsection 1, and any bonds bonds, will be paid from annually available money in the Stateing those Highway Fund.
As used in this subsection, “annually available money in the State Highway Fund” means money remaining in the State Highway Fund in any year after all amounts - *SB502_R1* – 9 – required to pay bonds issued pursuant to NRS 408.273 in that year have been paid or provision for such payment has been made.
As used in this subsection, “annually available money in the State Highway Fund” means money - 83rd Session (2025) – 9 – required to pay bonds issued pursuant to NRS 408.273 in that year have been paid or provision for such payment has been made.
The State Controller may advance temporarily from the State General Fund, upon the approval of the Director of the Office of Finance in the Office of the Governor, to the State Public Works Division of the Department of Administration, until the date on which the bonds authorized by section 6 of this act are sold, amounts necessary to facilitate, as applicable, the purchase of buildings or the start of the projects enumerated in section 6 of this act.
The State Controller may advance temporarily from the State General Fund, upon the approval of the Director of the Office of Finance in the Office of the Governor, to the State Public Works Division of the Department of Administration, until the date on which the bonds authorized by section 6 of this act are sold, buildings or the start of the projects enumerated in section 6 of this act.
The State Controller may advance temporarily from the State Highway Fund, upon the approval of the Director of the Office of Finance in the Office of the Governor, to the State Public Works Division of the Department of Administration, until the date on which the bonds authorized by section 8 of this act are sold, amounts necessary to facilitate the start of the projects enumerated in section 8 of this act.
The State Controller may advance temporarily from the State Highway Fund, upon the approval of the Director of the Office of Finance in the Office of the Governor, to the State Public Works Division of the Department of Administration, until the date on which the bonds authorized by section 8 of this act are sold, amounts necessary to facilitate the start of the projects enumerated State Controller must be advanced as the money is required for the projects and must not be transferred to the projects from the State Highway Fund until required to make contract payments.
The amounts temporarily advanced by the State Controller must be advanced as the money is required for the projects and must not be transferred to the projects from the State Highway Fund until required to make contract payments.
The Director of the Office of Finance in the Office of the Governor shall provide written notification to the State Controller, the State Treasurer and the Senate and Assembly Fiscal Analysts of the Fiscal Analysis Division of the Legislative Counsel Bureau of the approval of any advance from the State General Fund or the - *SB502_R1* – 10 – State Highway Fund to the State Public Works Division of the Department of Administration pursuant to subsection 2 or 3.
The Director of the Office of Finance in the Office of the Governor shall provide written notification to the State Controller, - 83rd Session (2025) – 10 – the Fiscal Analysis Division of the Legislative Counsel Bureaus of of the approval of any advance from the State General Fund or the State Highway Fund to the State Public Works Division of the Department of Administration pursuant to subsection 2 or 3.
The State Public Works Division of the Department of Administration shall transfer the sum of $11,762,261 from the amount appropriated by section 1 of chapter 1, Statutes of Nevada 2023, 34th Special Session, at page 1, for the project numbered and described in the Executive Budget for the 2023-2025 biennium or otherwise described as Project 23-P01, Advance Planning:
The State Public Works Division of the Department of Administration shall transfer the sum of $11,762,261 Nevada 2023, 34th Special Session, at page 1, for the projecttes of numbered and described in the Executive Budget for the 2023-2025 biennium or otherwise described as Project 23-P01, Advance Planning:
Any remaining balance of the amount transferred pursuant to section 11 of this act must not be committed for expenditure after June 30, 2029, and must be reverted to the State General Fund on or before September 21, 2029.
Any remaining balance of the amount transferred pursuant to section 11 of this act must not be committed for expenditure after June 30, 2029, and must be reverted to the State GenSec.
Sec.
1.
1.n orExpendituretemofr 2the202following sums not appropriated from the State General Fund or the State Highway Fund is hereby authorized for the following projects numbered and described in the Executive Budget for the 2025-2027 biennium or otherwise described as follows:
Expenditure of the following sums not appropriated from the State General Fund or the State Highway Fund is hereby authorized for the following projects numbered and described in the Executive Budget for the 2025-2027 biennium or otherwise described as follows:
- 83rd Session (2025) – 11 – Description Project No.
Description Project No.
Statewide Fire and Life Safety Program, Nevada National Guard........................................$4,301,549g Statewide Indoor Air Quality, Environmental Program.................25-S06 $100,000 Statewide Building Official Program......................................$4,000,000 - *SB502_R1* – 11 – Description Project No.
Statewide Fire and Life Safety Program, Nevada National Statewide Indoor Air Quality,.....................$4,301,549 Environmental Program.................25-S06 $100,000 Statewide Building Official Program.......................................$4,000,000 Capital Improvements for the Office of the Military:
Amount Capital Improvements for the Office of the Military:
Parking Apron Expansion, Nevada Air National Guard...........25-C06 $8,942,120 Advance Planning, Camp Washoe Renovation, Nevada Army National Guard.....................25-P05 $910,568 Advance Planning, Civil Service Team Facility, Nevada Army National Guard...............................25-$590,000 Power Distribution and Lighting, Office of Adjutant General Building, Lawrence E.
Parking Apron Expansion, Nevada Air National Guard...........25-C06 $8,942,120 Advance Planning, Camp Washoe Renovation, Nevada Army National Guard.....................25-P05$910,568 Advance Planning, Civil Service Team Facility, Nevada Army National Guard...............................2$590,000 Power Distribution and Lighting, Office of Adjutant General Building, Lawrence E.
25-M$908,229 Re-roof Combined Support Maintenance Shop 2, Nevada Army National Guard...................25-S01g $529,269 Pavement Maintenance and Rehabilitation, Plumb Lane Readiness Center..........................25-S$191,641 Capital Improvements for the Department of Veterans Services:
25-M09$908,229 Re-roof Combined Support Maintenance Shop 2, Nevada Army National Guard...................25-S01g $529,269 Pavement Maintenance and Rehabilitation, Plumb Lane Capital Improvements for the Department of Veterans Services:41 North Las Vegas State Veterans Home........................................$145,067,830 2.
North Las Vegas State Veterans Home......................................$145,067,8303 2.
Sec.
- 83rd Session (2025) – 12 – Sec.
All state and local governmental agencies involved in the design and construction of the projects enumerated in sections 1, 3, 6, 8, 13 and 25 of this act shall cooperate with the State Public Works Division of the Department of Administration to expedite completion of the project.
All state and local governmental agencies involved in the design and construction of the projects enumerated in sections 1, 3, 6, 8, 13 and 25 of this act shall cooperate with the State Public Works Division of the Department of Administration to expedite comSec.
Sec.
The State Board of Finance shall issue general obligation bonds of the State of Nevada in the face amount of not more than $6,000,000 in the 2025-2027 biennium as provided in NRS 383.530, the proceeds of which must be used for the program for awarding financial assistance to pay the actual expenses of - *SB502_R1* – 12 – preserving or protecting historical buildings to be used to develop a network of cultural centers and activities.
The State Board of Finance shall issue general obligation bonds of the State of Nevada in the face amount of not more than $6,000,000 in the 2025-2027 biennium as provided in NRS 383.530, the proceeds of which must be used for the program for awarding financial assistance to pay the actual expenses of preserving or protecting historical buildings to be used to develop a network of cultural centers and activities.
The State Board of Finance shall issue general obligation bonds of the State of Nevada in the face amount of not more than $33,900,000 in the 2025-2027 biennium as provided in NRS 349.986, the proceeds of which must be used for the program for providing grants for water conservation and capital improvements to certain water systems.
The State Board of Finance shall issue general obligation bonds of the State of Nevada in the face amount of not more than $33,900,000 in the 2025-2027 biennium as provided in NRS 349.986, the proceeds of which must be used for the program improvements to certain water systems.
2.
conservation and capital 2.
8.
- 83rd Session (2025) – 13 – 8.
Subparagraph (2) of paragraph (a) of subsection 10 of section 2;
Subparagraph (2) of paragraph (a) of subsection 10 of sec11.
11.
Paragraph (b) of subsection 10 of section 2, - *SB502_R1* – 13 – of chapter 480, Statutes of Nevada 2019, at page 2861.
Paragraph (b) of subsection 10 of section 2, of chapter 480, Statutes of Nevada 2019, at page 2861.
Sec.
assessed valuation of taxable property is hereby levied for Fiscalf Year 2025-2026, and an ad valorem tax of 16.18 cents on each $100 of assessed valuation of taxable property is hereby levied for Fiscal Year 2026-2027.
21.
1.
An ad valorem tax of 16.18 cents on each $100 of assessed valuation of taxable property is hereby levied for Fiscal Year 2025-2026, and an ad valorem tax of 16.18 cents on each $100 of assessed valuation of taxable property is hereby levied for Fiscal Year 2026-2027.
An ad valorem tax of 0.82 cents on each $100 of assessed valuation of taxable property is hereby levied for Fiscal Year 2025- 2026, and an ad valorem tax of 0.82 cents on each $100 of assessed valuation of taxable property is hereby levied for Fiscal Year 2026- 2027.
An ad valorem tax of 0.82 cents on each $100 of assessed valuation of taxable property is hereby levied for Fiscal Year 2025- 2026, and an ad valorem tax of 0.82 cents on each $100 of assessed - 83rd Session (2025) – 14 – 2027.
The taxes levied must be collected in the manner provided in chapter 361 of NRS on all taxable property in this State, including, without limitation, the net proceeds of minerals, and excluding such property as is by law exempt from taxation.
The taxes levied must be collected in the manner provided in6- chapter 361 of NRS on all taxable property in this State, including, without limitation, the net proceeds of minerals, and excluding such property as is by law exempt from taxation.
Notwithstanding the provisions of NRS 361.453 to the contrary, the levies imposed pursuant to this subsection must not be included - *SB502_R1* – 14 – in calculating the limitation set forth in subsection 1 of NRS 361.453 on the total ad valorem tax levied for all public purposes.
Notwithstanding the provisions of NRS 361.453 to the contrary, the levies imposed pursuant to this subsection must not be included in calculating the limitation set forth in subsection 1 of NRS 361.453 on the total ad valorem tax levied for all public purposes.
The proceeds of the taxes levied by this section are hereby appropriated in each fiscal year to the Consolidated Bond Interest and Redemption Fund to discharge the obligations of the State of Nevada as they are respectively due in that fiscal year.
The proceeds of the taxes levied by this section are hereby appropriated in each fiscal year to the Consolidated Bond Interest Nevada as they are respectively due in that fiscal year.
If the money in the Consolidated Bond Interest and Redemption Fund is insufficient to pay those obligations as they become due, the State Controller shall cause the money in reserve to be transferred from the State General Fund to the Consolidated Bond Interest and Redemption Fund.
If the money in the Consolidated Bond Interest and become due, the State Controller shall cause the money in reserve to be transferred from the State General Fund to the Consolidated Bond Interest and Redemption Fund.
3.
- 83rd Session (2025) – 15 – 3.
(a) The amount of any estimate made pursuant to subsection 1 and the amount of money reserved in the State General Fund based upon the estimate;
(a) The amount of any estimate made pursuant to subsection 1 and the amount of money reserved in the State General Fund based upo(b) The amount of money transferred from the State General Fund pursuant to subsection 2;
(b) The amount of money transferred from the State General Fund pursuant to subsection 2;
- *SB502_R1* – 15 – Sec.
Sec.
As used in this subsection, “bond repayment costs” means the principal, interest and related costs of issuance of the bonds and any other costs related to the payment of the bonds or compliance with covenants made in connection with those bonds, as estimated by the State Treasurer.
As used in this subsection, “bond repayment costs” means the principal, costs related to the payment of the bonds or compliance withother covenants made in connection with those bonds, as estimated by the State Treasurer.
Sec.
- 83rd Session (2025) – 16 – on slot machines imposed pursuant to NRS 463.385 that isl tax distributed to the Special Capital Construction Fund for Higher Education, except any amount of that money which is needed to pay the principal and interest on bonds, is appropriated to the State Public Works Division of the Department of Administration in the sum of $3,000,000 for the project numbered and described in the Executive Budget for the 2025-2027 biennium or otherwise described as project 25-M01, Deferred Maintenance, Nevada System of Higher Education.
26.
1.
The money collected pursuant to the annual tax on slot machines imposed pursuant to NRS 463.385 that is distributed to the Special Capital Construction Fund for Higher Education, except any amount of that money which is needed to pay the principal and interest on bonds, is appropriated to the State Public Works Division of the Department of Administration in the sum of $3,000,000 for the project numbered and described in the Executive Budget for the 2025-2027 biennium or otherwise described as project 25-M01, Deferred Maintenance, Nevada System of Higher Education.
Any remaining balance of the appropriation made by subsection 1 must not be committed for expenditure after June 30, 2029, by the entity to which the appropriation is made or any entity to which money from the appropriation is granted or otherwise transferred in any manner, and any portion of the appropriated money remaining must not be spent for any purpose after September 21, 2029, by either the entity to which the money was - *SB502_R1* – 16 – appropriated or the entity to which the money was subsequently granted or transferred, and must be reverted to the Special Capital Construction Fund for Higher Education on or before September 21, 2029.
Any remaining balance of the appropriation made by subsection 1 must not be committed for expenditure after June 30, 2029, by the entity to which the appropriation is made or any entity to which money from the appropriation is granted or otherwise transferred in any manner, and any portion of the appropriated money remaining must not be spent for any purpose after September 21, 2029, by either the entity to which the money was granted or transferred, and must be reverted to the Special Capital Construction Fund for Higher Education on or before September 21, 2029.
2.
design and construction of the capital improvement projects for the Legislative Department described in this act shall cooperate with the Legislative Department to expedite completion of the projects.
All state and local governmental agencies involved in the design and construction of the capital improvement projects for the Legislative Department described in this act shall cooperate with the Legislative Department to expedite completion of the projects.
Sec.
- 83rd Session (2025) – 17 – authorized pursuant to section 28 of this act at the time deemed appropriate by the Board based on the schedule established for the completion of the capital improvement projects described in that section.
29.
1.
The State Board of Finance may issue the bonds authorized pursuant to section 28 of this act at the time deemed appropriate by the Board based on the schedule established for the completion of the capital improvement projects described in that section.
The advanced amounts must be repaid immediately to the State General Fund upon the issuance of the bonds or not later than the last business day in August immediately following the end of the fiscal year during which the advance is made.
The advanced amounts must be repaid immediately to the State General Fund upon the issuance of the bonds or not later than the last business day in August immediately made.wing the end of the fiscal year during which the advance is 3.
- *SB502_R1* – 17 – 3.
The reconciliation must be provided not later than the last business day in August immediately following the end of the fiscal year during which an advance is made.
The reconciliation must be provided not later than the last business day in August immediately following the end of the fiscal year during whiSec.
Sec.
If bonds for projects described in section 28 and either section 6 or 8 of this act are proposed for issuance at the same meeting of the State Board of Finance, the State Board of Finance shall approve bonds in one or more series for all such projects and may not vote separately upon projects described in such sections.
If bonds for projects described in section 28 and either section 6 or 8 of this act are proposed for issuance at the same meeting of the State Board of Finance, the State Board of Finance shall approve a single issuance of bonds in one or more series for all such projects and may not vote separately upon projects described in such sections.
Sec.
- 83rd Session (2025) – 18 – Sec.
30.3.
1.
The State Board of Finance shall issue general obligation bonds of the State of Nevada in the face amount of not more than $50,000,000 in the 2025-2027 biennium, the proceeds of which must be deposited with the State Treasurer for credit to the Nevada State Infrastructure Bank Fund created by NRS 226.787 and used by the Nevada State Infrastructure Bank to make loans for the development or construction of infrastructure:
(a) That will serve attainable housing projects that are located in a special improvement district or special assessment district;
and (b) For which not less than 85 percent of the total cost of developing or constructing the infrastructure will be paid from a tax or assessment levied by the district.
2.
As used in this section, “proceeds” means amounts received from the sale of an issue of the general obligation bonds and any accrued interest thereon.
Sec.
Except as otherwise provided in [subsection] subsections 2 [,] and 3, any remaining balance of the allocated amounts authorized in section 6 of - *SB502_R1* – 18 – chapter 542, Statutes of Nevada 2019, at page 3309, as amended by section 2 of chapter 3, Statutes of Nevada 2020, 31st Special Session, at page 18, must:
Except as otherwise provided in of the allocated amounts authorized in section 6 of chapter 542, Statutes of Nevada 2019, at page 3309, as amended by section 2 of chapter 3, Statutes of Nevada 2020, 31st Special Session, at page 18, must:
(a) Be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 19, 2025 [.] ;
(a) Be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund(b) Be transferred for the projects numbered and described in the Executive Budget for the 2025-2027 biennium or otherwise described in section 6 of this act.
or (b) Be transferred for the projects numbered and described in the Executive Budget for the 2025-2027 biennium or otherwise described in section 6 of this act.
[Marlette Lake Dam Rehabilitation, Marlette Lake Water System................................19-C08] Renovation of Collections Storage Building 19, Stewart Campus .....................................19-C16...
[Marlette Lake Dam Rehabilitation, Marlette Lake Water System...................................19-C08] Renovation of Collections Storage Building 19, Stewart Campus .........................................19-C16 Replace Freezer, Purchasing Warehouse......................................19-M01 Emergency Generator and Service Entrance Upgrade, Reno Purchasing Warehouse.......................
Replace Freezer, Purchasing Warehouse...................................19-M01.
19-M07 - 83rd Session (2025) – 19 – Description Project No.
Emergency Generator and Service Entrance Upgrade, Reno Purchasing Warehouse.......................
Central Plant Renovation, Paul Laxalt State Office Building..............
19-M07 Central Plant Renovation, Paul Laxalt State Office Building..............
19-M29 HVAC Systems Renovation, [Construct Water Wells and...................
19-M29 HVAC Systems Renovation, Washoe County Armory ....................
19-M31 Water Systems, Wildlife Management Area Sites.....................
19-M31 [Construct Water Wells and Water Systems, Wildlife Management Area Sites.....................
19-M40] Cemetery Expansion, Southern Nevada Veterans Memorial Cemetery......................................19-C03 Underground Piping and Boiler Replacement, Lovelock Correctional Center...........................19-M10 Statewide ADA Program........................
19-M40] - *SB502_R1* – 19 – Description Project No.
Cemetery Expansion, Southern Nevada Veterans Memorial Cemetery....................................19-C03..
Underground Piping and Boiler Replacement, Lovelock Correctional Center.........................19-M10 Statewide ADA Program........................
Marlette Lake Dam Rehabilitation, Marlette Lake Water System................................19-C08 Construct Water Wells and Water Systems, Wildlife Management Area Sites....................
Marlette Lake Dam Rehabilitation, Marlette Lake Construct Water Wells and.........................19-C08 Water Systems, Wildlife Management Area Sites....................
Any remaining balance of the allocated amounts authorized in section 4 of chapter 466, Statutes of Nevada 2021, at page 2880, for [project 21-C03, Washoe County Training Center Addition, Nevada Army National Guard,] the following projects must not be committed for expenditure after June 30, 2027, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 17, 2027.
Any remaining balance of the allocated amounts authorized in section 4 of chapter 466, Statutes of Nevada - 83rd Session (2025) – 20 – 2021, at page 2880, for [project 21-C03, Washoe County Training Center Addition, Nevada Army National Guard,] the following projects must not be committed for expenditure after June 30, 2027, and must be reverted to the Bond Interest and Redemption Fund on or before September 17, 2027.rest Description Project No.
- *SB502_R1* – 20 – Description Project No.
Heavy Equipment Repair Shop and Shop Renovation, Northern Region 2 Headquarters, Elko..........................21-C01 Washoe County Training Center Addition, Nevada Army National Guard .............................21-C03 Hobart Reservoir Dam Rehabilitation, Marlette Lake Water System................................21-C06 Aircraft Storage Hangar and Sitework, Harry Reid Training Center.............................21-C10 Loading Dock, North Las Vegas Readiness Center............................21-E01 Deferred Maintenance, Department of Health and Human Services .............................21-M02 Construct Water Wells and Water Systems, Various Fish Uninterruptible Power Supply...................21-M08 and Temperature Control System Upgrade, Bryan Building....................................21-M11...
Heavy Equipment Repair Shop and Shop Renovation, Northern Region 2 Headquarters, Elko..........................21-C01 Washoe County Training Center Addition, Nevada Army National Guard .............................21-C03 Hobart Reservoir Dam Rehabilitation, Marlette Lake Water System................................21-C06 Aircraft Storage Hangar and Sitework, Harry Reid Training Center.............................21-C10 Loading Dock, North Las Vegas Readiness Center............................21-E01 Deferred Maintenance, Department of Health and Human Services .............................21-M02 Construct Water Wells and Water Systems, Various Fish Hatchery Sites .............................21-M08 Uninterruptible Power Supply and Temperature Control System Upgrade, Bryan Building....................................21-M11...
Housing Unit 4 HVAC System Renovation, Northern Nevada Correctional Center.........................21-M30 Domestic Hot Water System and Transformer Replacement, Office of the Adjutant General.....................................21-M43...
Housing Unit 4 HVAC System Renovation, Northern Nevada Correctional Center.........................21-M30 - 83rd Session (2025) – 21 – Description Project No.
Domestic Hot Water System and Transformer Replacement, Office of the Adjutant General.......................................21-M43.
21-M46 Safety Improvements, Miller Point Overlook..............................21-M50 - *SB502_R1* – 21 – Description Project No.
21-M46 Safety Improvements, Miller Point Overlook................................21-M50 Replace Locks and Controls Housing Unit 7, Northern Replace Cell Doors and Locks in............
Replace Locks and Controls Housing Unit 7, Northern Nevada Correctional Center.............
21-M58 Housing Units 4 - 6, Northern Nevada Correctional Center.............
21-M58 Replace Cell Doors and Locks in Housing Units 4 - 6, Northern Nevada Correctional Center.............
General Instruction Building, Floyd Edsall Training Center .....................21-P05 Statewide Paving Program.....................
General Instruction Building, Floyd Edsall Training Center .....................
21-S05 Budget for the 2023-2025 biennium or otherwise described intive section 6 of chapter 1, Statutes of Nevada 2023, 34th Special Session, at page 6, as Project 23-C33, Southern Nevada Small Arms Range, Nevada Army National Guard is hereby cancelled in accordance with paragraph (j) of subsection 1 of NRS 341.145.
21-P05 Statewide Paving Program.....................
21-S05 Sec.
33.
The project numbered and described in the Executive Budget for the 2023-2025 biennium or otherwise described in section 6 of chapter 1, Statutes of Nevada 2023, 34th Special Session, at page 7, as Project 23-C33, Southern Nevada Small Arms Range, Nevada Army National Guard is hereby cancelled in accordance with paragraph (j) of subsection 1 of NRS 341.145.
This section and sections 1 to 16, inclusive, and 18 to 33, inclusive, of this act become effective upon passage and approval.
This section and sections 1 to 16, inclusive, and to 33, inclusive, of this act become effective upon passage and approval.
H - *SB502_R1*
~~~~~ 25 - 83rd Session (2025)
View plain text versions (6)

Amendments

2 amendments

Click Show changes on an amendment above to see how it modifies the bill.

Action History

  1. Chapter 515.

  2. Approved by the Governor.

  3. Enrolled and delivered to Governor.

  4. From printer. To re-engrossment. Re-engrossed. Fourth reprint. To enrollment.

  5. To printer.

  6. From printer. To reengrossment. Reengrossed. Third reprint. To Senate. In Senate. Assembly Amendment No. 959 concurred in. Assembly Amendment No. 979 not concurred in. To Assembly. In Assembly. Assembly Amendment No. 979 receded from. To Senate. In Senate.

  7. Taken from Chief Clerk's desk. Placed on General File. Read third time. Amended. (Amend. Nos. 959 and 979.) Dispensed with reprinting. Read third time. Passed, as amended. Title approved. (Yeas: 38, Nays: 4.) To printer.

  8. Taken from General File. Placed on Chief Clerk's desk.

  9. Taken from General File. Placed on General File for next legislative day.

  10. From printer. To reengrossment. Reengrossed. Second reprint. Taken from General File. Placed on General File for next legislative day.

  11. From printer. To engrossment. Engrossed. First reprint. Action of adoption of Amendment No. 852 rescinded. To printer.

  12. Taken from Chief Clerk's desk. Placed on General File. Read third time. Amended. (Amend. No. 852.) To printer.

  13. Taken from General File. Placed on Chief Clerk's desk.

  14. From committee: Do pass. Placed on Second Reading File. Read second time.

  15. Read third time. Passed. Title approved. (Yeas: 17, Nays: 4.) To Assembly. In Assembly. Read first time. Referred to Committee on Ways and Means. To committee.

  16. From printer. To committee. From committee: Do pass. Placed on Second Reading File. Read second time.

  17. Read first time. Referred to Committee on Finance. To printer.

Sponsors

  • Senate Committee on Finance · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 66 not signed on · 8 voted No

Sponsors (1)

  • Senate Committee on Finance

Co-sponsors (0)

None.

Not signed on (66)

66 members have not signed on to this bill.

Show all 66 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Assembly (2nd Reprint)

Passed 38 Yea · 4 Nay
Party YeaNayPresentNot Voting
Democratic 27000
Republican 10400
Unaffiliated 1000
Total 38400
% of votes cast 90%10%0%0%
How each member voted (42)
Member Party Vote
O’Neill, PK — Yea
Anderson, Natha C. Democratic Yea
Backus, Shea M. Democratic Yea
Brown-May, Tracy Democratic Yea
Carter, Max E., II Democratic Yea
Considine, Venicia Democratic Yea
D'Silva, Reuben Democratic Yea
Dalia, Joe Democratic Yea
Flanagan, Tanya P. Democratic Yea
González, Cecelia Democratic Yea
Goulding, Heather Democratic Yea
Hunt, Linda F. Democratic Yea
Jackson, Jovan A. Democratic Yea
Jauregui, Sandra Democratic Yea
Karris, Venise Democratic Yea
La Rue Hatch, Selena Democratic Yea
Marzola, Elaine H. Democratic Yea
Miller, Brittney M. Democratic Yea
Monroe-Moreno, Daniele Democratic Yea
Moore, Cinthia Zermeño Democratic Yea
Mosca, Erica Democratic Yea
Nadeem, Hanadi Democratic Yea
Nguyen, Duy Democratic Yea
Orentlicher, David Democratic Yea
Roth, Erica P. Democratic Yea
Torres-Fossett, Selena Democratic Yea
Watts, Howard Democratic Yea
Yeager, Steve Democratic Yea
Cole, Lisa K. Republican Yea
DeLong, Rich Republican Yea
Dickman, Jill Republican Nay
Edgeworth, Rebecca Republican Yea
Gallant, Danielle Republican Nay
Gray, Ken Republican Nay
Gurr, Bert K. Republican Yea
Hafen, Gregory T., II Republican Yea
Hansen, Alexis M. Republican Yea
Hardy, Melissa R.. Republican Yea
Hibbetts, Brian Republican Yea
Kasama, Heidi Republican Nay
Koenig, Gregory S. Republican Yea
Yurek, Toby Republican Yea

Official roll call →

Senate (As Introduced)

Passed 17 Yea · 4 Nay
Party YeaNayPresentNot Voting
Republican 4400
Democratic 13000
Total 17400
% of votes cast 81%19%0%0%
How each member voted (21)
Member Party Vote
Cannizzaro, Nicole J. Democratic Yea
Cruz-Crawford, Michelee "Shelly" Democratic Yea
Daly, Skip Democratic Yea
Dondero Loop, Marilyn Democratic Yea
Doñate, Fabian Democratic Yea
Flores, Edgar Democratic Yea
Lange, Roberta Democratic Yea
Neal, Dina Democratic Yea
Nguyen, Rochelle T. Democratic Yea
Ohrenschall, James Democratic Yea
Pazina, Julie Democratic Yea
Scheible, Melanie Democratic Yea
Taylor, Angela D. Democratic Yea
Buck, Carrie Ann Republican Nay
Ellison, John Republican Nay
Hansen, Ira Republican Yea
Krasner, Lisa Republican Nay
Rogich, Lori Republican Yea
Steinbeck, John C. Republican Yea
Stone, Jeff Republican Yea
Titus, Robin L. Republican Nay

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 502?
SB 502 is sponsored by Senate Committee on Finance.
What is the current status of SB 502?
This bill has been enacted into law. Introduced May 19, 2025. Enacted.
Where can I track SB 502?
Track SB 502 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 502

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 502

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →