Nevada 2023 Regular Session Status: Enacted

AB 34 — Revises provisions relating to water. (BDR 48-235)

Last action — Approved by the Governor. Chapter 176.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Assembly
  4. ✓
    Passed Senate
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced November 16, 2022. Enacted.

Signed by Governor Joe Lombardo (Republican) on June 02, 2023.

Prognosis

Advancing 50% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

409 added · 656 removed

409 line(s) added, 656 removed.

→
Previous
Latest
(Reprinted with amendments adopted on April 24, 2023) FIRST REPRINT A.B.
Assembly Bill No.
34 A SSEMBLY B ILLN O.
34–Committee on Natural Resources CHAPTER..........
34–COMMITTEE ON NATURAL R ESOURCES (ON B EHALF OF THE D IVISION OFW ATER RESOURCES OF THE STATE DEPARTMENT OF C ONSERVATION AND N ATURAL RESOURCES ) PREFILED N OVEMBER 16, 2022 ____________ Referred to Committee on Natural Resources SUMMARY—Revises provisions relating to water.
(BDR 48-235) FISCAL NOTE:
Effect on Local Government:
No.
Effect on the State:
Yes.
~ EXPLANATION – Matter in bolded italics is new;
matter between brackets [omitted material] is material to be omitted.
revising various public notice requirements relating to water;
revising the public notice requirements for certain applications relating to water;
Under existing law, the State Engineer is required to publish certain notices and court orders in a newspaper of general circulation consecutively for certain periods of time.
Under existing law, the State Engineer is required to publish a notice for certain applications in a newspaper of general circulation consecutively for certain periods the notice consecutively.
(NRS 533.087, 533.095, 533.165, 533.360) Sections 1, 2, 5 and 6 of this bill eliminate the requirement to publish the notice or order submitted by the State Engineer consecutively.
Section 6 further requires the State Engineer to post the notice on the Internet website of the Division of Water Resources of the State Department of Conservation and Natural Resources.
Sections 2, 5 and 6 further require the Division of Water the notice or court order on the Internet website of the Division.urces to post Existing law authorizes any interested person to file a written protest against the granting of an application for a permit within 30 days of the last publication of the notice of application.
(NRS 533.365) Section 8 of this bill provides that a person may file a protest against the granting of an application for a permit within 60 days after the first date of publication or if the notice is not posted consecutively, within 30 days after the last date of publication of the notice for Engineer does not receive any protests to an application within 60 days after theState first date of publication, the State Engineer:
(1) may presume that the notice was published consecutively and process the application conditionally;
and (2) may not grant the application or issue a permit until the State Engineer files proof that the notice was published and posted.
- *AB34_R1* – 2 – Section 4 of this bill clarifies that certain blank forms for a proof of persons claiming rights in or to the waters of certain stream systems.r to certain THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
appropriation must be included in the notice sent by the State Engineer to certain persons claiming rights in or to the waters of certain stream systems.
Section 1.
EXPLANATION – Matter in bolded italics is new;
NRS 533.087 is hereby amended to read as follows:
matter between brackets [omitted material] is material to be omitted.
533.087 1.
THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
A claimant of any vested water right must submit, on a form prescribed by the State Engineer, proof of the claim to the State Engineer on or before December 31, 2027.
Sections 1 and 2.
If a claimant fails to file such proof on or before December 31, 2027, the claim shall be deemed to be abandoned.
(Deleted by amendment.) Sec.
2.
Until December 31, 2027, the State Engineer shall cause notice of the provisions of subsection 1 to be:
(a) Published annually for 4 [consecutive] weeks in at least one newspaper of general circulation within the boundaries of each groundwater basin throughout the State.
(b) Posted on the Internet website maintained by the State Engineer.
Sec.
2.
NRS 533.095 is hereby amended to read as follows:
533.095 1.
As soon as practicable after the State Engineer enters an order granting the petition or selecting the streams upon which the determination of rights is to begin, the State Engineer shall prepare a notice setting forth the fact of the entry of the order and of the pendency of the proceedings.
2.
The notice shall set forth:
(a) That all claimants to rights in the waters of the stream system are required, as provided in this chapter, to make proof of their claims, except claimants who submitted proof of their claims pursuant to NRS 533.087;
(b) The date on which the State Engineer will commence taking proofs of appropriation regarding the rights in and to the waters of the stream system;
(c) The date by which all proofs of appropriation must be filed;
and (d) That all proofs of appropriation must be accompanied by maps prepared in accordance with and depicting any information required pursuant to NRS 533.100 and 533.115.
The notice shall be [published] :
(a) Published for a period of 4 [consecutive] weeks in one or more newspapers of general circulation within the boundaries of the stream system.
Show all 156 changed rows (116 more)
Previous
Latest
- *AB34_R1* – 3 – (b) Posted on the Internet website of the Division of Water Resources of the State Department of Conservation and Natural Resources.
4.
At or near the time of the first publication of the notice, the State Engineer shall send by mail to each person, or deliver to each person, in person, hereinafter designated as claimant, claiming rights in or to the waters of the stream system, insofar as such claimants can be reasonably ascertained, a notice equivalent in terms to the published notice setting forth the date when the State Engineer will commence the taking of proofs, and the date prior to which proofs must be filed with the State Engineer.
The notice must be mailed at least 30 days prior to the date fixed for the commencement of the taking of proofs.
The date set prior to which the proofs must be filed shall not be less than 60 days from the date set for the commencement of taking proofs.
The notice shall be deemed to be an order of the State Engineer as to its contents.
Sec.
3.
(d) The kind of culture upon each of the parcels of land.
- 82nd Session (2023) – 2 – 4.
4.
The State Engineer shall, in addition, enclose with the notice to be mailed as provided in subsection 4 of NRS 533.095, - *AB34_R1* – 4 – blank forms upon which a claimant who has not submitted proof pursuant to NRS 533.087 shall present in writing all particulars necessary for the determination of the claimant’s right in or to the waters of the stream system.
The State Engineer shall, in addition, enclose with the notice to be mailed as provided in subsection 4 of NRS 533.095, blank forms upon which a claimant who has not submitted proof pursuant to NRS 533.087 shall present in writing all particulars necessary for the determination of the claimant’s right in or to the waters of the stream system.
(b) The nature of the right or use on which the claim for appropriation is based.
(b) The nature of the right or use on which the claim for app(c) The time of the initiation of such right, the priority date claimed and a description of the place of diversion and works of diversion and distribution.
(c) The time of the initiation of such right, the priority date claimed and a description of the place of diversion and works of diversion and distribution.
(i) If the water was used for irrigation, the number of acres irrigated the first year, the number of acres irrigated in subsequent years, the dates of irrigation, the area and location of the lands which were irrigated, the character of the soil and the kind of crops cultivated, the rate of diversion and the number of acre-feet of water per annum required to irrigate the land.
(i) If the water was used for irrigation, the number of acres irrigated the first year, the number of acres irrigated in subsequent years, the dates of irrigation, the area and location of the lands which were irrigated, the character of the soil and the kind of crops cultivated, the rate of diversion and the number of acre-feet of water per(j) If the water was used for a beneficial purpose other than irrigation, the rate of diversion and the number of acre-feet of water used annually.
(j) If the water was used for a beneficial purpose other than irrigation, the rate of diversion and the number of acre-feet of water used annually.
2.
- 82nd Session (2023) – 3 – 2.
The proof of appropriation submitted by the claimant must be accompanied by a map prepared, except as otherwise provided in subsection 4, in accordance with and depicting any information required pursuant to the requirements of subsections 3 and 4 of NRS 533.100.
The proof of appropriation submitted by the claimant must subsection 4, in accordance with and depicting any information in required pursuant to the requirements of subsections 3 and 4 of NRS 533.100.
If the map submitted with a proof of appropriation is prepared for water used for watering livestock, the map must be on a scale of not less than 1:24,000 or a map prepared by the United States Geological Survey covering a quadrangle of 7 1/2 minutes of latitude and longitude, and further identifying the location or extent - *AB34_R1* – 5 – of the livestock use by one-sixteenth sections within a numbered section, township and range.
If the map submitted with a proof of appropriation is prepared for water used for watering livestock, the map must be on a scale of not less than 1:24,000 or a map prepared by the United States Geological Survey covering a quadrangle of 7 1/2 minutes of latitude and longitude, and further identifying the location or extent of the livestock use by one-sixteenth sections within a numbered section, township and range.
NRS 533.165 is hereby amended to read as follows:
(Deleted by amendment.) Sec.
533.165 1.
As soon as practicable thereafter, a certified copy of the order of determination, together with the copies of the original evidence and transcript of testimony filed with, or taken before, the State Engineer, duly certified by the State Engineer, shall be filed with the clerk of the county, as ex officio clerk of the district court, in which the stream system is situated, or, if in more than one county but all within one judicial district, then with the clerk of the county wherein reside the largest number of parties in interest.
2.
If such stream system shall be in two or more judicial districts, then the State Engineer shall notify the district judge of each of such judicial districts of his or her intent to file such order of determination, whereupon, within 10 days after receipt of such notice, such judges shall confer and agree where the court proceedings under this chapter shall be held and upon the judge who shall preside, and on notification thereof the State Engineer shall file the order of determination, evidence and transcripts with the clerk of the court so designated.
3.
If such district judges fail to notify the State Engineer of their agreement, as provided in subsection 2, within 5 days after the expiration of such 10 days, then the State Engineer may file such order of determination, evidence and transcript with the clerk of any county the State Engineer may elect, and the district judge of such county shall have jurisdiction over the proceedings in relation thereto.
4.
If the judge so selected and acting shall retire from office, or be removed from office or be disqualified, for any cause, then the judge of the district court having jurisdiction of the proceedings shall act as the judge on the matter or shall select the judge to preside in such matter.
5.
In all instances a certified copy of the order of determination shall be filed with the county clerk of each county in which such stream system, or any part thereof, is situated.
Upon the filing of the certified copy of the order, evidence and transcript with the clerk of the court in which the proceedings are to be had, the State Engineer shall procure an order from the court setting the time for hearing.
The clerk of such court shall immediately furnish the State Engineer with a certified copy thereof.
The State Engineer immediately thereupon shall [mail] :
(a) Mail a copy of [such] the certified order of the court, by registered or certified mail, addressed to each party in interest at the party’s last known place of residence .
[, and shall cause the same] - *AB34_R1* – 6 – (b) Submit a copy of the certified order of the court to be published at least once a week for 4 [consecutive] weeks in some newspaper of general circulation that is available in general circulation in each county in which such stream system or any part thereof is located.
(c) Post a copy of the certified order of the court on the Internet website of the Division of Water Resources of the State Department of Conservation and Natural Resources.
7.
The State Engineer shall file with the clerk of the court [proof] :
(a) Proof of [such] service by registered or certified mail [and by] in accordance with the requirements of paragraph (a) of subsection 6;
(b) Proof that the certified order was submitted for publication [.] ;
and (c) Proof that the certified order was posted on the Internet website of the Division of Water Resources of the State Department of Conservation and Natural Resources,  Such service by registered or certified mail and by publication and posting shall be deemed full and sufficient notice to all parties in interest of the date and purpose of such hearing.
Sec.
6.
(b) The date of the filing.
Except as otherwise provided in subsection 4, proof of publication and posting must be filed within 30 days after the final day of publication.
Except as otherwise provided in subsection 4, proof of publication must be filed within 30 days after the final day of publication.
The State Engineer shall pay for the publication - *AB34_R1* – 7 – from the application fee.
The State Engineer shall pay for the publication from the application fee.
3.
- 82nd Session (2023) – 4 – 3.
and (b) Whose reasonably expected rate of diversion is one-half cubic foot per second or more, the applicant shall mail a copy of the notice of application to each owner of real property containing a domestic well that is within 2,500 feet of the proposed well, to the owner’s address as shown in the latest records of the county assessor.
and (b) Whose reasonably expected rate of diversion is one-half cubic foot per second or more, owner of real property containing a domestic well that is withino each 2,500 feet of the proposed well, to the owner’s address as shown in the latest records of the county assessor.
Sec.
Secs.
7.
7 and 8.
8.
NRS 533.365 is hereby amended to read as follows:
533.365 1.
Any person interested may, within 60 days after the first date of publication or, if the notice is not published consecutively, 30 days after the date of last publication of the notice of application [,] that is set forth in the notice pursuant to subsection 1 of NRS 533.360, whichever is later, file with the State Engineer a written protest against the granting of the application, setting forth with reasonable certainty the grounds of such protest, which, except as otherwise provided in subsection 2, must be verified by the affidavit of the protestant, or an agent or attorney thereof.
2.
If the application is for a permit to change the place of diversion, manner of use or place of use of water already appropriated within the same basin, a protest filed against the granting of such an application by a government, governmental agency or political subdivision of a government must be verified by the affidavit of:
(a) Except as otherwise provided in paragraph (b), the director, administrator, chief, head or other person in charge of the government, governmental agency or political subdivision;
or (b) If the governmental agency or political subdivision is a division or other part of a department, the director or other person in charge of that department in this State, including, without limitation:
- *AB34_R1* – 8 – (1) The Regional Forester for the Intermountain Region, if the protest is filed by the United States Forest Service;
(2) The State Director of the Nevada State Office of the Bureau of Land Management, if the protest is filed by the Bureau of Land Management;
(3) The Regional Director of the Pacific Southwest Region, if the protest is filed by the United States Fish and Wildlife Service;
(4) The Regional Director of the Pacific West Region, if the protest is filed by the National Park Service;
(5) The Director of the State Department of Conservation and Natural Resources, if the protest is filed by any division of that Department;
or (6) The chair of the board of county commissioners, if the protest is filed by a county.
3.
On receipt of a protest that complies with the requirements of subsection 1 or 2, the State Engineer shall advise the applicant whose application has been protested of the fact that the protest has been filed with the State Engineer, which advice must be sent by certified mail.
4.
The State Engineer shall consider the protest, and may, in his or her discretion, hold hearings and require the filing of such evidence as the State Engineer may deem necessary to a full understanding of the rights involved.
The State Engineer shall give notice of the hearing by certified mail to both the applicant and the protestant.
The notice must state the time and place at which the hearing is to be held and must be mailed at least 15 days before the date set for the hearing.
5.
Each applicant and each protestant shall, in accordance with a schedule established by the State Engineer, provide to the State Engineer and to each protestant and each applicant information required by the State Engineer relating to the application or protest.
6.
If the State Engineer holds a hearing pursuant to subsection 4, the State Engineer shall render a decision on each application not later than 240 days after the later of:
(a) The date all transcripts of the hearing become available to the State Engineer;
or (b) The date specified by the State Engineer for the filing of any additional information, evidence, studies or compilations requested by the State Engineer.
The State Engineer may, for good cause shown, extend any applicable period.
7.
The State Engineer shall adopt rules of practice regarding the conduct of a hearing held pursuant to subsection 4.
The rules of practice must be adopted in accordance with the provisions of NRS 233B.040 to 233B.120, inclusive, and codified in the Nevada - *AB34_R1* – 9 – Administrative Code.
The technical rules of evidence do not apply at such a hearing.
8.
If the State Engineer does not receive any written protest against the granting of an application within 60 days after the first date of publication pursuant to subsection 1 of NRS 533.360, the State Engineer may presume that the notice was published consecutively and process the application conditionally.
The State Engineer may not grant the application or issue a permit until the State Engineer files proof that the notice was published and posted pursuant to the requirements of NRS 533.360.
Sec.
(b) The proposed use or change, if within an irrigation district, does not adversely affect the cost of water for other holders of water rights in the district or lessen the efficiency of the district in its delivery or use of water;
(b) The proposed use or change, if within an irrigation district, does not adversely affect the cost of water for other holders of water rights in the district or lessen the efficiency of the district in its del(c) The applicant provides proof satisfactory to the State Engineer of the applicant’s:
and (c) The applicant provides proof satisfactory to the State Engineer of the applicant’s:
Except as otherwise provided in subsection 10, where there is no unappropriated water in the proposed source of supply, where the groundwater that has not been committed for use has been reserved pursuant to NRS 533.0241 or where its proposed use or change conflicts with existing rights or with protectable interests in existing domestic wells as set forth in NRS 533.024, or threatens to prove detrimental to the public interest, the State Engineer shall reject the application and refuse to issue the requested permit.
Except as otherwise provided in subsection 10, where there is no unappropriated water in the proposed source of supply, where the groundwater that has not been committed for use has been reserved pursuant to NRS 533.0241 or where its proposed use or change conflicts with existing rights or with protectable interests in existing domestic wells as set forth in NRS 533.024, or threatens to prove detrimental to the public interest, the State Engineer shall - 82nd Session (2023) – 5 – previous application for a similar use of water within the same basin has been rejected on those grounds, the new application may be denied without publication.
If a previous application for a similar use of water within the same basin has been rejected on those grounds, the new application may be denied without publication.
- *AB34_R1* – 10 – (b) If the State Engineer determines that a plan for conservation of water is advisable for the basin into which the water is to be imported, whether the applicant has demonstrated that such a plan has been adopted and is being effectively carried out;
(b) If the State Engineer determines that a plan for conservation of water is advisable for the basin into which the water is to be imported, whether the applicant has demonstrated that such a plan has been adopted and is being effectively carried out;
(d) Whether the proposed action is an appropriate long-term use which will not unduly limit the future growth and development in the basin from which the water is exported;
(d) Whether the proposed action is an appropriate long-term use the basin from which the water is exported;
and (e) Any other factor the State Engineer determines to be relevant.
andnd development in (e) Any other factor the State Engineer determines to be relevant.
(e) Where court actions or adjudications are pending, which may affect the outcome of the application.
(e) Where court actions or adjudications are pending, which may aff(f) In areas in which adjudication of vested water rights is deemed necessary by the State Engineer.
(f) In areas in which adjudication of vested water rights is deemed necessary by the State Engineer.
5.
- 82nd Session (2023) – 6 – 5.
Except as otherwise provided in this subsection and subsection 10, the State Engineer shall approve or reject, within 6 months after the final date for filing a protest, an application filed to change the point of diversion of water already appropriated when the existing and proposed points of diversion are on the same property for which the water has already been appropriated under the existing water right or the proposed point of diversion is on real property that is proven to be owned by the applicant and is contiguous to the place of use of the existing water right.
Except as otherwise provided in this subsection and months after the final date for filing a protest, an application filed to change the point of diversion of water already appropriated when the existing and proposed points of diversion are on the same property for which the water has already been appropriated under the existing water right or the proposed point of diversion is on real property that is proven to be owned by the applicant and is contiguous to the place of use of the existing water right.
The State - *AB34_R1* – 11 – Engineer may postpone action on the application pursuant to subsection 4.
The State Engineer may postpone action on the application pursuant to subsection 4.
The rejection or approval of an application must be endorsed on a copy of the original application, and a record must be made of the endorsement in the records of the State Engineer.
The rejection or approval of application, and a record must be made of the endorsement in the records of the State Engineer.
If a person is the successor in interest of an owner of a water right or an owner of real property upon which a domestic well is located and if the former owner of the water right or real property on which a domestic well is located had previously filed a written protest against the granting of an application, the successor in interest must be allowed to pursue that protest in the same manner as if the successor in interest were the former owner whose interest he or she succeeded.
If a person is the successor in interest of an owner of a water right or an owner of real property upon which a domestic well is located and if the former owner of the water right or real property on which a domestic well is located had previously filed a written protest against the granting of an application, the successor in - 82nd Session (2023) – 7 – as if the successor in interest were the former owner whose interest he or she succeeded.
- *AB34_R1* – 12 – 12.
12.
The State Engineer may, in his or her discretion, request that the statement required by NRS 533.400 be accompanied by a map on [tracing linen on] a scale of not less than 1,000 feet to the inch, which shall show with substantial accuracy the following:
The State Engineer may, in his or her discretion, by a map on [tracing linen on] a scale of not less than 1,000 feet to the inch, which shall show with substantial accuracy the following:
If the survey and map are made by different persons the affidavit of each must be on the map, showing that the map as compiled agrees with the survey.
If the survey and map are made by that the map as compiled agrees with the survey.on the map, showing 3.
3.
For examining and filing an application for a permit to appropriate water....................................$360.00 This fee includes the cost of publication, which is $50.
- 82nd Session (2023) – 8 – For permit to appropriate water....................................$360.00 This fee includes the cost of publication, which is $50.
- *AB34_R1* – 13 – For examining and filing an application for a temporary permit to change the point of diversion, manner of use or place of use of an existing right......................................................$180.00 For issuing and recording each permit to appropriate water for any purpose, except for generating hydroelectric power which results in nonconsumptive use of the water, watering livestock or wildlife purposes ...................360.00 plus $3 per acre-foot approved or fraction thereof.
For examining and filing an application for a temporary permit to change the point of an existing right........................................................180.00 For issuing and recording each permit to appropriate water for any purpose, except for generating hydroelectric power which results in nonconsumptive use of the water, watering livestock or wildlife purposes ...................360.00 plus $3 per acre-foot approved or fraction thereof.
For issuing and recording each permit for additional rate of diversion from a well where no additional volume of water is granted...................................................................1,000.00 For issuing and recording each permit to change the point of diversion or place of use of an existing right whether temporary or permanent for irrigation purposes, a maximum fee of .......................................................750.00 For issuing and recording each permit to appropriate or change the point of diversion or place of use of an existing right whether temporary or permanent for watering livestock or wildlife purposes ..................................240.00 plus $50 for each cubic foot of water per second approved or fraction thereof.
For additional rate of diversion from a well where no additional volume of water is granted...................................................................1,000.00 For issuing and recording each permit to change the point of diversion or place of use of an existing right whether temporary or permanent for irrigation purposes, a maximum fee of .......................................................750.00 - 82nd Session (2023) – 9 – For issuing and recording each permit to appropriate or change the point of diversion or place of use of an existing right whether temporary or permanent for watering livplus $50 for each cubic foot of water per...................$240.00 second approved or fraction thereof.
For filing and examining a request for a waiver in connection with an application to drill a well...........................................................................120.00 - *AB34_R1* – 14 – For filing and examining a notice of intent to drill a well ................................................................$25.00 For filing and examining an affidavit to relinquish water rights in favor of use of water for domestic wells ..........................................300.00 For filing a secondary application under a reservoir permit........................................................300.00 For approving and recording a secondary permit under a reservoir permit................................540.00 For reviewing each tentative subdivision map..............180.00 plus $1 per lot.
For filing and examining a request for a waiver in connection with an application to drill a well...........................................................................120.00 For filing and examining a notice of intent to drill a well ..................................................................25.00 For filing and examining an affidavit to relinquish water rights in favor of use of water for domestic wells ..........................................300.00 For filing a secondary application under a reservoir permit........................................................300.00 For approving and recording a secondary permit under a reservoir permit................................540.00 For reviewing each tentative subdivision map..............180.00 For reviewing and approving each final subdivision map .......................................................120.00 For storage approved under a dam permit for privately owned nonagricultural dams which store more than 50 acre-feet..........................480.00 plus $1.25 per acre-foot storage capacity.
For reviewing and approving each final subdivision map .......................................................120.00 For storage approved under a dam permit for privately owned nonagricultural dams which store more than 50 acre-feet..........................480.00 plus $1.25 per acre-foot storage capacity.
For filing proof of completion of work ...........................60.00 For filing proof of beneficial use.....................................60.00 For issuing and recording a certificate upon approval of the proof of beneficial use.....................350.00 For filing proof of resumption of a water right .............360.00 For filing any protest.......................................................30.00 For filing any application for extension of time within which to file proofs, of completion or beneficial use, for each year for which the extension of time is sought.................................120.00 For filing any application for extension of time to prevent a forfeiture, for each year for which the extension of time is sought......................120.00 For reviewing a cancellation of a water right pursuant to a petition for review ..............................360.00 For examining and filing a report of conveyance filed pursuant to paragraph (a) of subsection 1 of NRS 533.384...............................120.00 plus $20 per conveyance document.
For filing proof of completion of work ...........................60.00 - 82nd Session (2023) – 10 – For filing proof of beneficial use...................................$60.00 For issuing and recording a certificate upon approval of the proof of beneficial use.....................350.00 For filing proof of resumption of a water right .............360.00 For filing any application for extension of time.............................30.00 within which to file proofs, of completion or beneficial use, for each year for which the extension of time is sought.................................120.00 For filing any application for extension of time to prevent a forfeiture, for each year for which the extension of time is sought......................120.00 For reviewing a cancellation of a water right pursuant to a petition for review ..............................360.00 For examining and filing a report of conveyance filed pursuant to paragraph (a) of subsection 1 of NRS 533.384...............................120.00 plus $20 per conveyance document.
For filing any other instrument........................................10.00 - *AB34_R1* – 15 – For making a copy of any document recorded or filed in the Office of the State Engineer, for the first page.........................................................$1.00 For each additional page.......................................................20 For certifying to copies of documents, records or maps, for each certificate.........................................6.00 For each copy of any full size drawing or map .................6.00 For each color copy of any full size drawing or map (2′ x 3′) ...............................................................12.00 For colored [mylar] plots.................................................10.00 required of the Office of the State Engineer, the State Engineer shall collect the actual cost of the work.
For filing any other instrument........................................10.00 For making a copy of any document recorded or filed in the Office of the State Engineer, for the first page...........................................................1.00 For each additional page.......................................................20 For certifying to copies of documents, records or maps, for each certificate.........................................6.00 For each copy of any full size drawing or map .................6.00 For each color copy of any full size drawing or For colored [mylar] plots.................................................10.00.12.00 2.
When fees are not specified in subsection 1 for work required of the Office of the State Engineer, the State Engineer shall collect the actual cost of the work.
If, after exercising due diligence, the State Engineer is unable to make the refunds, the State Engineer shall deposit the fees in the State Treasury for credit to the State General Fund.
If, after exercising due diligence, the State Engineer is - 82nd Session (2023) – 11 – unable to make the refunds, the State Engineer shall deposit the fees in the State Treasury for credit to the State General Fund.
Sec.
Secs.
12.
12 and 13.
(Deleted by amendment.) Sec.
(Deleted by amendment.) ~~~~~ 23 - 82nd Session (2023)
13.
(Deleted by amendment.) H - *AB34_R1*
View plain text versions (4)

Amendments

2 amendments

Click Show changes on an amendment above to see how it modifies the bill.

Action History

  1. Approved by the Governor. Chapter 176.

  2. Enrolled and delivered to Governor.

  3. Senate Amendment No. 620 concurred in. To enrollment.

  4. Read third time. Passed, as amended. Title approved, as amended. (Yeas: 21, Nays: None.) To Assembly. In Assembly.

  5. From printer. To re-engrossment. Re-engrossed. Second reprint. Taken from General File. Placed on General File for next legislative day.

  6. From committee: Amend, and do pass as amended. Placed on Second Reading File. Read second time. Amended. (Amend. No. 620.) To printer.

  7. In Senate. Read first time. Referred to Committee on Natural Resources. To committee.

  8. From printer. To engrossment. Engrossed. First reprint. Read third time. Passed, as amended. Title approved. (Yeas: 40, Nays: 2.) To Senate.

  9. From committee: Amend, and do pass as amended. Placed on Second Reading File. Read second time. Amended. (Amend. No. 281.) To printer.

  10. Read first time. To committee.

  11. From printer.

  12. Prefiled. Referred to Committee on Natural Resources. To printer.

Sponsors

  • Assembly Committee on Natural Resources · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 66 not signed on

Sponsors (1)

  • Assembly Committee on Natural Resources

Co-sponsors (0)

None.

Not signed on (66)

66 members have not signed on to this bill.

Show all 66 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors AB 34?
AB 34 is sponsored by Assembly Committee on Natural Resources.
What is the current status of AB 34?
This bill has been enacted into law. Introduced November 16, 2022. Enacted.
Where can I track AB 34?
Track AB 34 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 34

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 34

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →