SB 328 — Revises provisions relating to energy storage systems. (BDR 58-658)
Last action — (No further action taken.)
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
3Passed Senate
-
4Passed Assembly
-
5To Executive
-
6Enacted
This bill died with 2021 Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Bill Text
What changed in the latest version
154 added · 212 removedPlain-language change summary
The recent amendments to SB 328 updated the language regarding the Public Utilities Commission of Nevada's role in setting targets for energy storage systems used by electric utilities. Now, the Commission is required to reevaluate these targets and ensure they are effectively supporting public interests. Additionally, the bill has removed outdated requirements that no longer apply, streamlining the process. These changes are crucial for keeping energy procurement practices current and efficient, helping to enhance energy sustainability in the state.
(Reprinted with amendments adopted on MayApril 19, 2021) SECONDFIRST REPRINT S.B.
328 SSENATE ENATEBILL BN ILLN O.
328–SENATOR LLANGE ANGE M ARCH 22, 2021 ____________ Referred to Committee on Growth and Infrastructure SUMMARY—Revises provisions relating to energy storage systems.
establishing qualifications for persons who install electrochemical energy storage systems;
revisingrequiring provisions governing the establishment by the Public Utilities Commission of Nevada ofto reevaluate the existing biennial targets for the procurement of energy storage systems by certain electric utilities;
requiring the Commission to reevaluate the existing biennial targets;
(NRS 704.795, 704.796) Existing regulations, with certain exceptions, establishby progressivelycertain largerelectric targetsutilities, forculminating thein procurementa ofrequirement energythat storagecertain systemselectricems utilities procure energy storage systems capable of storing not less than 1,000ic1,000 megawatts of electric power by December 31, 2030.
R106-19) Section 37.5 of thisreevaluate billthe requiresexisting thatbiennial targets for the Commissionprocurement establishof biennialenergy targetsstorage thatsystems deliverby thecertain electric utilities in regulations and to make any revisions to the procurementtargets ofwhich the energyCommission storagedetermines systems.to be in the public interest;
Section 7.5 of this bill requires theof Commission, not later than November 1, 2022, to:
(1) reevaluate the existing biennial targets for the procurement of energy storage systems by certain electric - *SB328_R2* – 2 – utilities in regulations and to make any revisions to the targets which the Commission determines to be in the public interest;
Section 9 of this bill removes an obsolete provision that requires the Commission to - *SB328_R1* – 2 – determine whether to adopt regulations to establish the biennial targets by October 1, 2018, given that those regulations have been adopted.
Section 3.53 of this billbilSection makes5 aof conformingthis changebill relatingprohibits toa theperson removalfrom ofinstalling thisan obsoleteenergy provision.storagen.
Sectionsystem 5unless ofthe thisperson billholds prohibits a personvalid fromlicense installingas an electrochemicalelectrical energycontractor storageand, systemfor unlessinstallations theoccurring personon holdsproperty aother valid license in the classification than a residential property after July 1, 2022, ensurescertain thatadditional theprofessional installationqualifications isrelating performedto by or under the directinstallation supervision of aenergy personstorage whosystems. holds a certificate demonstrating the successful completion of the Energy Storage and Microgrid Training and Certification program.
Section 6 of this bill provides that a violation of the provisionsBoard.ions of section 5 is grounds for disciplinary action by the State Contractors’ Board.THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
704.796 [If, pursuant to NRS 704.795, the Commission determines that it is in the public interest to establish by regulation targets for the procurement of energy storage systems by an electric utility, the] 1.The Commission shall adopt regulations:
The1. Commission shall adopt regulations:
[1.] (a) Establishing biennial targets for the procurement of energy storage systems by [the]the an electric utility;
[2.] (b) Setting forth the points of interconnection on the electric grid for the implementation of energy storage systems;
[3.] (c) Establishing that an energy storage system may be owned by the electric utility or any other person;
[4.] (d) Establishing requirements for the filing by the electric utility of annual or biennial plans to meet biennial targets for the procurement and implementation of energy storage systems;
[5.] (e) Prescribing a procedure by which the Commission must, at least once every 3 years, reevaluate the biennial targets for the procurement of energy storage systems by the electric utility;
[6.] (f) Establishing a procedure by which an electric utility may obtain a waiver or deferral of the biennial targets for the procurement of energy storage systems if the electric utility is not able to identify energy storage systems that provide benefits to customers of the utility that exceed the costs of energy storage systems;
and - *SB328_R2* – 3 – [7.] (g) Requiring the electric utility to include such information as the Commission may require in each plan submitted by the electric utility pursuant to NRS 704.741.
TheSetting Commissionforth shall establish biennial targets pursuant to subsection 1 that deliver the greatestpoints benefitsof tointerconnection theon customers of the electric utilitygrid infor relation to the costsimplementation of the procurement of the energy storage systems.systems;
In3. calculating the benefits and costs of the procurement of energy storage systems, the Commission shall consider all known and measurable benefits and costs, including, without limitation:
(a)Establishing Athat reductionan inenergy thestorage needsystem formay thebe additionalowned generation of electricity by the electric utility duringor periodsany ofother peakperson; demand;
(b)4. A reduction in line losses of the electric utility;
(c)Establishing Therequirements benefitsfor andthe costsfiling relatedby tothe ancillaryelectric servicesutility of annual or biennial plans to meet biennial targets for the electricprocurement utility;and implementation of energy storage systems;
(d)5. Avoided costs to the electric utility for additional generation, transmission and generation capacity;
(e)Prescribing Thea benefitsprocedure arisingby fromwhich athe reductionCommission ofmust, greenhouseat gasleast emissionsonce andevery 3 years, reevaluate the emissionbiennial targets for the procurement of otherenergy airstorage pollutants;systems by the electric utility;
(f)6. The benefits and costs to the electric utility related to voltage support;
(g)Establishing Thea benefitsprocedure by which an electric utility may obtain a waiver or deferral of diversifyingthe biennial targets for the typesprocurement of resourcesenergy usedstorage forsystems if the generationelectric utility is not able to identify energy storage systems that provide benefits to customers of electricity;the utility that exceed the costs of energy storage systems;
(h)and The7. administrative costs incurred by the electric utility;
(i)Requiring Thethe costelectric utility to theinclude electricsuch utilityinformation ofas the integrationCommission ofmay energyrequire storagein systemseach intoplan submitted by the transmissionelectric andutility distributionpursuant grid;to NRS 704.741.
and (j) The cost of the energy storage systems.
3.5.
NRS 704.797 is hereby amended to read as follows:
704.797 1.
[If the Commission adopts regulations pursuant to NRS 704.796 to establish biennial targets for the procurement of energy storage systems by an electric utility, to] To meet the targets set forth in [those] the regulations [, the] adopted pursuant to NRS 704.796, an electric utility may procure energy storage systems that are either centralized or distributed and either owned by the utility or by any other person, as prescribed by regulation of the Commission.
Show all 77 changed lines (37 more)
2.
Electric energy storage systems procured by an electric utility to meet [any] the biennial targets for the procurement of energy storage systems established by regulation pursuant to NRS 704.796 must:
(a) Reduce peak demand for electricity;
(b) Avoid or defer investment by the electric utility in assets for the generation, transmission and distribution of electricity;
(c) Improve the reliability of the operation of the transmission or distribution grid;
- *SB328_R2* – 4 – (d) Reduce the emission of greenhouse gases or other air pollutants;
or (e) Integrate renewable energy into the electric grid.
Sec.
(Deleted by amendment.) - *SB328_R1* – 3 – Sec.
A person shall not install an electrochemical energy storage system in this State unless he or she:she holds:
(a) HoldsA a valid license in the classificationspecialty of electrical contracting with any subclassification required to perform such work issued pursuant to this chapter and the regulations of the Board;
and (b) If the installation is for a property other than a residential property and is performed on or after July 1, 2022, ensures that the installation is performed by or under the direct supervision of a person who holds a certificate demonstrating the successful completion of the Energy Storage and Microgrid Training and Certification program (ESAMTAC).
(a) “Electrochemical“Energy energy storage system” meanshas athe commerciallymeaning availableascribed technologyto thatit is capable of receiving electric energy and storing that energy by electrochemical means in orderNRS to704.793. produce and deliver electricity at a later time.
- *SB328_R2* – 5 – 5.
- *SB328_R1* – 4 – 9.
Not later than November 1, 2022, based upon the most recent plan filed by an electric utility pursuant to NRS 704.741 on or before June 1, 2021, the Public Utilities Commission of Nevada shall reevaluate the biennial targets for the procurement of energy storage systems by an electric utility established by the Commission by regulation pursuant to NRS 704.796,704.796 as amended by section 3 of this act, and make any revisions to the targets that the Commission determines to be in the public interest.
The reevaluation required by this subsection is in addition to any reevaluation of the biennial targets for the procurement of energy storage systems required by the regulations adopted by the Commission pursuant to paragraph (e) of subsection 15 of NRS 704.796,704.796. as amended by section 3 of this act.
The report must state any revisions to the - *SB328_R2* – 6 – targets that have been or will be adopted by the Commission as a result of the reevaluation.
7.5Sec. to 9, inclusive, of this act become effective upon passage and approval.
10.
1.
This section and sections 1 to 4, inclusive, and 7.5 to 9, inclusive, of this act become effective upon passage and approval.
and - *SB328_R1* – 5 – (b) On October 1, 2021, for all other purposes.
(a) Whether the procurement of energy storage systems by an electricelectr(1) utilityThe willintegration achieveof renewable energy resources which generate electricity on an intermittent basis into the followingtransmission purposes:and distribution grid of the electric utility.
(1) The integration of renewable energy resources which generate electricity on an intermittent basis into the transmission and distribution grid of the electric utility.
(5) The avoidance or deferral of investment by the electric utility in generation, transmission and distribution of electricity.
(6) The replacement of ancillary services provided by facilitiesuse usingof fossilenergy fuelsstorage withsystems.with ancillary services provided by the use(7) The reduction of energygreenhouse storagegas systems.emissions.
(7)(b) The reductioninterconnection of greenhouseenergy gasstorage emissions.systems at each point of the electric grid, including, without limitation, in the transmission and distribution of electricity and at the site of the customer.
- *SB328_R2* – 7 – (b) The interconnection of energy storage systems at each point of the electric grid, including, without limitation, in the transmission and distribution of electricity and at the site of the customer.
For the purposes of subsection 1, the Commission shall determine that the establishment of targets for the procurement of energy storage systems by an electric utility is in the public interest if the benefits to customers of the electric utility exceed the costs of the procurement of energy storage systems.
- *SB328_R1* – 6 – (a) A reduction in the need for the additional generation of electricity during periods of peak demand;
(b)(c) AThe reductionbenefits inand linecosts losses;related to ancillary services;
(g)the Thegeneration benefits of diversifyingelectricity;fying the types of resources used for the(h) generationThe ofadministrative electricity;costs incurred by the electric utility;
(h)(i) The administrativecost coststo incurredthe byelectric utility of the electricintegration utility;of energy storage systems into the transmission and distribution grid;
storageand systems(j) intoThe thecost transmissionof andenergy distributionstorage grid;systems.
andergyH (j)- The*SB328_R1* cost of energy storage systems.
H - *SB328_R2*
Show all 77 changed rows (37 more)
View plain text versions (3)
- Reprint 1 View text pdf
- Reprint 2 View text Current pdf
- Introduced As Introduced pdf
Amendments
2 amendmentsClick Show changes on an amendment above to see how it modifies the bill.
Action History
-
(No further action taken.)
-
Assembly Amendment No. 640 not concurred in. To Assembly. In Assembly.
-
In Senate.
-
Read third time. Passed, as amended. Title approved, as amended. (Yeas: 26, Nays: 15, Absent: 1.) To Senate.
-
From printer. To reengrossment. Reengrossed. Second reprint. Taken from General File. Placed on General File for next legislative day.
-
From committee: Amend, and do pass as amended. Placed on Second Reading File. Read second time. Amended. (Amend. No. 640.) To printer.
-
In Assembly. Read first time. Referred to Committee on Growth and Infrastructure. To committee.
-
From printer. To engrossment. Engrossed. First reprint. Read third time. Passed, as amended. Title approved, as amended. (Yeas: 13, Nays: 8.) To Assembly.
-
From committee: Amend, and do pass as amended. Placed on Second Reading File. Read second time. Amended. (Amend. No. 225.) To printer.
-
From printer. To committee.
-
Read first time. Referred to Committee on Growth and Infrastructure. To printer.
Sponsors
- Roberta Lange · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 66 not signed on
Sponsors (1)
- Lange, Roberta Democratic
Co-sponsors (0)
None.
Not signed on (66)
66 members have not signed on to this bill.
Show all 66 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- Who sponsors SB 328?
- SB 328 is sponsored by Lange, Roberta (Democratic).
- What is the current status of SB 328?
- This bill died with 2021 Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track SB 328?
- Track SB 328 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 328
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.