Nevada 2021 Regular Session Status: Passed Senate 1 D cosponsors

SB 328 — Revises provisions relating to energy storage systems. (BDR 58-658)

Last action — (No further action taken.)

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed Assembly
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2021 Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Bill Text

What changed in the latest version

154 added · 212 removed

Plain-language change summary

The recent amendments to SB 328 updated the language regarding the Public Utilities Commission of Nevada's role in setting targets for energy storage systems used by electric utilities. Now, the Commission is required to reevaluate these targets and ensure they are effectively supporting public interests. Additionally, the bill has removed outdated requirements that no longer apply, streamlining the process. These changes are crucial for keeping energy procurement practices current and efficient, helping to enhance energy sustainability in the state.

→
Previous
Latest
(Reprinted with amendments adopted on May 19, 2021) SECOND REPRINT S.B.
(Reprinted with amendments adopted on April 19, 2021) FIRST REPRINT S.B.
328 S ENATE B ILLN O.
328 SENATE BILL N O.
328–SENATOR L ANGE M ARCH 22, 2021 ____________ Referred to Committee on Growth and Infrastructure SUMMARY—Revises provisions relating to energy storage systems.
328–SENATOR LANGE M ARCH 22, 2021 ____________ Referred to Committee on Growth and Infrastructure SUMMARY—Revises provisions relating to energy storage systems.
establishing qualifications for persons who install electrochemical energy storage systems;
establishing qualifications for persons who install energy storage systems;
revising provisions governing the establishment by the Public Utilities Commission of Nevada of biennial targets for the procurement of energy storage systems by certain electric utilities;
requiring the Public Utilities Commission of Nevada to reevaluate the existing biennial targets for the procurement of energy storage systems by certain electric utilities;
requiring the Commission to reevaluate the existing biennial targets;
(NRS 704.795, 704.796) Existing regulations, with certain exceptions, establish progressively larger targets for the procurement of energy storage systems utilities procure energy storage systems capable of storing not less than 1,000ic megawatts of electric power by December 31, 2030.
(NRS 704.795, 704.796) Existing regulations, with certain exceptions, by certain electric utilities, culminating in a requirement that certain electricems utilities procure energy storage systems capable of storing not less than 1,000 megawatts of electric power by December 31, 2030.
R106-19) Section 3 of this bill requires that the Commission establish biennial targets that deliver the the procurement of the energy storage systems.
R106-19) Section 7.5 of reevaluate the existing biennial targets for the procurement of energy storage systems by certain electric utilities in regulations and to make any revisions to the targets which the Commission determines to be in the public interest;
Section 7.5 of this bill requires theof Commission, not later than November 1, 2022, to:
(1) reevaluate the existing biennial targets for the procurement of energy storage systems by certain electric - *SB328_R2* – 2 – utilities in regulations and to make any revisions to the targets which the Commission determines to be in the public interest;
Section 9 of this bill removes regulations to establish the biennial targets by October 1, 2018, given that those regulations have been adopted.
Section 9 of this bill removes an obsolete provision that requires the Commission to - *SB328_R1* – 2 – determine whether to adopt regulations to establish the biennial targets by October 1, 2018, given that those regulations have been adopted.
Section 3.5 of this bill makes a conforming change relating to the removal of this obsolete provision.
Section 3 of this bilSection 5 of this bill prohibits a person from installing an energy storagen.
Section 5 of this bill prohibits a person from installing an electrochemical energy storage system unless the person holds a valid license in the classification than a residential property after July 1, 2022, ensures that the installation is performed by or under the direct supervision of a person who holds a certificate demonstrating the successful completion of the Energy Storage and Microgrid Training and Certification program.
system unless the person holds a valid license as an electrical contractor and, for installations occurring on property other than a residential property after July 1, 2022, certain additional professional qualifications relating to the installation of energy storage systems.
Section 6 of this bill provides that a violation of the provisions of section 5 is grounds for disciplinary action by the State Contractors’ Board.
Section 6 of this bill provides that a violation of the Board.ions of section 5 is grounds for disciplinary action by the State Contractors’ THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
704.796 [If, pursuant to NRS 704.795, the Commission determines that it is in the public interest to establish by regulation targets for the procurement of energy storage systems by an electric utility, the] 1.
704.796 [If, pursuant to NRS 704.795, the Commission determines that it is in the public interest to establish by regulation targets for the procurement of energy storage systems by an electric utility, the] The Commission shall adopt regulations:
The Commission shall adopt regulations:
1.
[1.] (a) Establishing biennial targets for the procurement of energy storage systems by [the] an electric utility;
Establishing biennial targets for the procurement of energy storage systems by the electric utility;
[2.] (b) Setting forth the points of interconnection on the electric grid for the implementation of energy storage systems;
[3.] (c) Establishing that an energy storage system may be owned by the electric utility or any other person;
[4.] (d) Establishing requirements for the filing by the electric utility of annual or biennial plans to meet biennial targets for the procurement and implementation of energy storage systems;
[5.] (e) Prescribing a procedure by which the Commission must, at least once every 3 years, reevaluate the biennial targets for the procurement of energy storage systems by the electric utility;
[6.] (f) Establishing a procedure by which an electric utility may obtain a waiver or deferral of the biennial targets for the procurement of energy storage systems if the electric utility is not able to identify energy storage systems that provide benefits to customers of the utility that exceed the costs of energy storage systems;
and - *SB328_R2* – 3 – [7.] (g) Requiring the electric utility to include such information as the Commission may require in each plan submitted by the electric utility pursuant to NRS 704.741.
The Commission shall establish biennial targets pursuant to subsection 1 that deliver the greatest benefits to the customers of the electric utility in relation to the costs of the procurement of the energy storage systems.
Setting forth the points of interconnection on the electric grid for the implementation of energy storage systems;
In calculating the benefits and costs of the procurement of energy storage systems, the Commission shall consider all known and measurable benefits and costs, including, without limitation:
3.
(a) A reduction in the need for the additional generation of electricity by the electric utility during periods of peak demand;
Establishing that an energy storage system may be owned by the electric utility or any other person;
(b) A reduction in line losses of the electric utility;
4.
(c) The benefits and costs related to ancillary services of the electric utility;
Establishing requirements for the filing by the electric utility of annual or biennial plans to meet biennial targets for the procurement and implementation of energy storage systems;
(d) Avoided costs to the electric utility for additional generation, transmission and generation capacity;
5.
(e) The benefits arising from a reduction of greenhouse gas emissions and the emission of other air pollutants;
Prescribing a procedure by which the Commission must, at least once every 3 years, reevaluate the biennial targets for the procurement of energy storage systems by the electric utility;
(f) The benefits and costs to the electric utility related to voltage support;
6.
(g) The benefits of diversifying the types of resources used for the generation of electricity;
Establishing a procedure by which an electric utility may obtain a waiver or deferral of the biennial targets for the procurement of energy storage systems if the electric utility is not able to identify energy storage systems that provide benefits to customers of the utility that exceed the costs of energy storage systems;
(h) The administrative costs incurred by the electric utility;
and 7.
(i) The cost to the electric utility of the integration of energy storage systems into the transmission and distribution grid;
Requiring the electric utility to include such information as the Commission may require in each plan submitted by the electric utility pursuant to NRS 704.741.
and (j) The cost of the energy storage systems.
3.5.
NRS 704.797 is hereby amended to read as follows:
704.797 1.
[If the Commission adopts regulations pursuant to NRS 704.796 to establish biennial targets for the procurement of energy storage systems by an electric utility, to] To meet the targets set forth in [those] the regulations [, the] adopted pursuant to NRS 704.796, an electric utility may procure energy storage systems that are either centralized or distributed and either owned by the utility or by any other person, as prescribed by regulation of the Commission.
Show all 77 changed rows (37 more)
Previous
Latest
2.
Electric energy storage systems procured by an electric utility to meet [any] the biennial targets for the procurement of energy storage systems established by regulation pursuant to NRS 704.796 must:
(a) Reduce peak demand for electricity;
(b) Avoid or defer investment by the electric utility in assets for the generation, transmission and distribution of electricity;
(c) Improve the reliability of the operation of the transmission or distribution grid;
- *SB328_R2* – 4 – (d) Reduce the emission of greenhouse gases or other air pollutants;
or (e) Integrate renewable energy into the electric grid.
Sec.
(Deleted by amendment.) Sec.
(Deleted by amendment.) - *SB328_R1* – 3 – Sec.
A person shall not install an electrochemical energy storage system in this State unless he or she:
A person shall not install an energy storage system in this State unless he or she holds:
(a) Holds a valid license in the classification required to perform such work issued pursuant to this chapter and the regulations of the Board;
(a) A valid license in the specialty of electrical contracting with any subclassification required to perform such work issued pursuant to this chapter and the regulations of the Board;
and (b) If the installation is for a property other than a residential property and is performed on or after July 1, 2022, ensures that the installation is performed by or under the direct supervision of a person who holds a certificate demonstrating the successful completion of the Energy Storage and Microgrid Training and Certification program (ESAMTAC).
and (b) If the installation is for a property other than a residential property and is performed on or after July 1, 2022, a certificate demonstrating the successful completion of the Energy Storage and Microgrid Training and Certification program (ESAMTAC).
(a) “Electrochemical energy storage system” means a commercially available technology that is capable of receiving electric energy and storing that energy by electrochemical means in order to produce and deliver electricity at a later time.
(a) “Energy storage system” has the meaning ascribed to it in NRS 704.793.
- *SB328_R2* – 5 – 5.
5.
9.
- *SB328_R1* – 4 – 9.
Not later than November 1, 2022, based upon the most recent plan filed by an electric utility pursuant to NRS 704.741 on or before June 1, 2021, the Public Utilities Commission of Nevada shall reevaluate the biennial targets for the procurement of energy storage systems by an electric utility established by the Commission by regulation pursuant to NRS 704.796, as amended by section 3 of this act, and make any revisions to the targets that the Commission determines to be in the public interest.
Not later than November 1, 2022, based upon the most recent plan filed by an electric utility pursuant to NRS 704.741 on or before June 1, 2021, the Public Utilities Commission of Nevada shall reevaluate the biennial targets for the procurement of energy storage systems by an electric utility established by the Commission by regulation pursuant to NRS 704.796 and make any revisions to the targets that the Commission determines to be in the public interest.
The reevaluation required by this subsection is in addition to any reevaluation of the biennial targets for the procurement of energy storage systems required by the regulations adopted by the Commission pursuant to paragraph (e) of subsection 1 of NRS 704.796, as amended by section 3 of this act.
The reevaluation required by this subsection is in addition to any reevaluation of the biennial targets for the procurement of energy storage systems required by the regulations adopted by the Commission pursuant to subsection 5 of NRS 704.796.
The report must state any revisions to the - *SB328_R2* – 6 – targets that have been or will be adopted by the Commission as a result of the reevaluation.
The report must state any revisions to the targets that have been or will be adopted by the Commission as a result of the reevaluation.
7.5 to 9, inclusive, of this act become effective upon passage and approval.
Sec.
10.
1.
This section and sections 1 to 4, inclusive, and 7.5 to 9, inclusive, of this act become effective upon passage and approval.
and (b) On October 1, 2021, for all other purposes.
and - *SB328_R1* – 5 – (b) On October 1, 2021, for all other purposes.
(a) Whether the procurement of energy storage systems by an electric utility will achieve the following purposes:
(a) Whether the procurement of energy storage systems by an electr(1) The integration of renewable energy resources which generate electricity on an intermittent basis into the transmission and distribution grid of the electric utility.
(1) The integration of renewable energy resources which generate electricity on an intermittent basis into the transmission and distribution grid of the electric utility.
utility in generation, transmission and distribution of electricity.
(5) The avoidance or deferral of investment by the electric utility in generation, transmission and distribution of electricity.
(6) The replacement of ancillary services provided by facilities using fossil fuels with ancillary services provided by the use of energy storage systems.
(6) The replacement of ancillary services provided by use of energy storage systems.with ancillary services provided by the (7) The reduction of greenhouse gas emissions.
(7) The reduction of greenhouse gas emissions.
(b) The interconnection of energy storage systems at each point of the electric grid, including, without limitation, in the transmission and distribution of electricity and at the site of the customer.
- *SB328_R2* – 7 – (b) The interconnection of energy storage systems at each point of the electric grid, including, without limitation, in the transmission and distribution of electricity and at the site of the customer.
For the purposes of subsection 1, the Commission shall determine that the establishment of targets for the procurement of if the benefits to customers of the electric utility exceed the costs of the procurement of energy storage systems.
For the purposes of subsection 1, the Commission shall determine that the establishment of targets for the procurement of energy storage systems by an electric utility is in the public interest if the benefits to customers of the electric utility exceed the costs of the procurement of energy storage systems.
(a) A reduction in the need for the additional generation of electricity during periods of peak demand;
- *SB328_R1* – 6 – (a) A reduction in the need for the additional generation of electricity during periods of peak demand;
(b) A reduction in line losses;
(c) The benefits and costs related to ancillary services;
(g) The benefits of diversifying the types of resources used for the generation of electricity;
the generation of electricity;fying the types of resources used for (h) The administrative costs incurred by the electric utility;
(h) The administrative costs incurred by the electric utility;
(i) The cost to the electric utility of the integration of energy storage systems into the transmission and distribution grid;
storage systems into the transmission and distribution grid;
and (j) The cost of energy storage systems.
andergy (j) The cost of energy storage systems.
H - *SB328_R1*
H - *SB328_R2*
View plain text versions (3)

Amendments

2 amendments

Click Show changes on an amendment above to see how it modifies the bill.

Action History

  1. (No further action taken.)

  2. Assembly Amendment No. 640 not concurred in. To Assembly. In Assembly.

  3. In Senate.

  4. Read third time. Passed, as amended. Title approved, as amended. (Yeas: 26, Nays: 15, Absent: 1.) To Senate.

  5. From printer. To reengrossment. Reengrossed. Second reprint. Taken from General File. Placed on General File for next legislative day.

  6. From committee: Amend, and do pass as amended. Placed on Second Reading File. Read second time. Amended. (Amend. No. 640.) To printer.

  7. In Assembly. Read first time. Referred to Committee on Growth and Infrastructure. To committee.

  8. From printer. To engrossment. Engrossed. First reprint. Read third time. Passed, as amended. Title approved, as amended. (Yeas: 13, Nays: 8.) To Assembly.

  9. From committee: Amend, and do pass as amended. Placed on Second Reading File. Read second time. Amended. (Amend. No. 225.) To printer.

  10. From printer. To committee.

  11. Read first time. Referred to Committee on Growth and Infrastructure. To printer.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 66 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (66)

66 members have not signed on to this bill.

Show all 66 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 328?
SB 328 is sponsored by Lange, Roberta (Democratic).
What is the current status of SB 328?
This bill died with 2021 Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 328?
Track SB 328 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 328

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 328

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →