Nevada 2019 Regular Session Status: Enacted

AB 95 — Revises provisions relating to water. (BDR 48-504)

Last action — Approved by the Governor. Chapter 304.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Assembly
  4. ✓
    Passed Senate
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced January 24, 2019. Enacted.

Prognosis

Advancing 50% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

AN ACT relating to water; requiring the State Engineer to continue to allow withdrawals of groundwater from domestic wells under certain circumstances in groundwater basins where withdrawals have been restricted to conform to priority rights; and providing other matters properly relating thereto.

Bill Text

What changed in the latest version

120 added · 131 removed

120 line(s) added, 131 removed.

→
Previous
Latest
(Reprinted with amendments adopted on April 15, 2019) FIRST REPRINT A.B.
Assembly Bill No.
95 A SSEMBLY B ILLN O.
95–Committee on Natural Resources, Agriculture, and Mining CHAPTER..........
95–COMMITTEE ON N ATURAL RESOURCES , AGRICULTURE ,AND M INING (O N BEHALF OF THE LEGISLATIVE COMMITTEE ON P UBLIC LANDS ) PREFILED JANUARY 24, 2019 ____________ Referred to Committee on Natural Resources, Agriculture, and Mining SUMMARY—Revises provisions relating to water.
(BDR 48-504) FISCAL NOTE:
Effect on Local Government:
No.
Effect on the State:
Yes.
~ EXPLANATION – Matter in bolded italics is new;
matter between brackets [omitted material] is material to be omitted.
LegExisting law requires the State Engineer to conduct investigations in any basin or portion thereof where it appears that the average annual replenishment to the groundwater supply may not be adequate for the needs of all permittees and vested rights claimants.
Legislative Counsel’s Digest:
If the State Engineer confirms that the average annual replenishment to the groundwater supply may not be adequate, he or she may order that withdrawals, including withdrawals from domestic wells, be restricted to conExisting law:
Existing law requires the State Engineer to conduct investigations in any basin groundwater supply may not be adequate for the needs of all permittees and vested rights claimants.
If the State Engineer confirms that the average annual replenishment to the groundwater supply may not be adequate, he or she may order that withdrawals, including withdrawals from domestic wells, be restricted to conform to priority rights.
(NRS 534.110) Existing law:
If a groundwater basin is designated as a critical management area for at least 10 consecutive years, the State domestic wells, be restricted to conform to priority rights.
If a groundwater basin is Engineer is required to order that withdrawals, including withdrawals from, the State domestic wells, be restricted to conform to priority rights.
(NRS 534.110) This bill provides that if a court of competent jurisdiction orders the State Engineer to restrict withdrawals to conform to priority rights or if the State - *AB95_R1* – 2 – Engineer orders that withdrawals be restricted to conform to priority rights in any of these groundwater basins, the State Engineer must limit the restriction on 0.5 acre-feet of water per year if the owner of the domestic well installs or has installed a water meter to record the withdrawal.
(NRS 534.110) This bill provides that if a court of competent jurisdiction orders the State Engineer to restrict withdrawals to conform to priority rights or if the State Engineer orders that withdrawals be restricted to conform to priority rights in any of these groundwater basins, the State Engineer must limit the restriction on withdrawals from domestic wells to allow a domestic well to continue to withdraw 0.5 acre-feet of water per year if the owner of the domestic well installs or has installed a water meter to record the withdrawal.
EXPLANATION – Matter in bolded italics is new;
matter between brackets [omitted material] is material to be omitted.
(b) Upon his or her own initiation, conduct pumping tests to determine if overpumping is indicated, to determine the specific yield of the aquifers and to determine permeability characteristics.
80th Session (2019) – 2 – (b) Upon his or her own initiation, conduct pumping tests to determine if overpumping is indicated, to determine the specific yield of the aquifers and to determine permeability characteristics.
This section does not prevent the granting of permits to applicants later in time on the ground that the diversions under the proposed later appropriations may cause the water level to be lowered at the point of diversion of a prior appropriator, so long as any protectable interests in existing domestic wells as set forth in NRS 533.024 and the rights of holders of existing appropriations - *AB95_R1* – 3 – can be satisfied under such express conditions.
This section does not prevent the granting of permits to applicants later in time on the ground that the diversions under the proposed later appropriations may cause the water level to be lowered at the point of diversion of a prior appropriator, so long as any protectable interests in existing domestic wells as set forth in NRS 533.024 and the rights of holders of existing appropriations can be satisfied under such express conditions.
Except as otherwise provided in subsection 7, the State Engineer shall conduct investigations in any basin or portion thereof where it appears that the average annual replenishment to the groundwater supply may not be adequate for the needs of all permittees and all vested-right claimants, and if the findings of the State Engineer so indicate, except as otherwise provided in subsection 9, the State Engineer may order that withdrawals, including, without limitation, withdrawals from domestic wells, be restricted to conform to priority rights.
Except as otherwise provided in subsection 7, the State Engineer shall conduct investigations in any basin or portion thereof where it appears that the average annual replenishment to the groundwater supply may not be adequate for the needs of all 80th Session (2019) – 3 – permittees and all vested-right claimants, and if the findings of the State Engineer so indicate, except as otherwise provided in subsection 9, the State Engineer may order that withdrawals, including, without limitation, withdrawals from domestic wells, be restricted to conform to priority rights.
If a basin has been designated as a critical management area for at least 10 consecutive years, except as otherwise provided in subsection 9, the State Engineer shall order that withdrawals, including, without limitation, withdrawals from domestic wells, be restricted in that basin to conform to priority rights, unless a groundwater management plan has been approved for the basin pursuant to NRS 534.037.
If a basin has been designated as a critical management area for at least consecutive years, except as otherwise provided in subsection 9, the State Engineer shall order that withdrawals, including, without limitation, withdrawals from domestic wells, be restricted in that basin to conform to priority rights, unless a groundwater management plan has been approved for the basin pursuant to NRS 534.037.
Any order or decision of the State Engineer so restricting drilling of such - *AB95_R1* – 4 – wells may be reviewed by the district court of the county pursuant to NRS 533.450.
Any order or decision of the State Engineer so restricting drilling of such wells may be reviewed by the district court of the county pursuant to NRS 533.450.
If a court of competent jurisdiction orders the State Engineer to restrict withdrawals to conform to priority rights or if pursuant to subsection 6 or 7 the State Engineer orders that withdrawals be restricted to conform to priority rights, the State Engineer must limit the restriction of withdrawals from a domestic well to allow a domestic well to continue to withdraw 0.5 acre-feet of Sec.
If a court of competent jurisdiction orders the State Engineer to restrict withdrawals to conform to priority rights or if pursuant to subsection 6 or 7 the State Engineer orders that withdrawals be restricted to conform to priority rights, the State Engineer must limit the restriction of withdrawals from a domestic well to allow a domestic well to continue to withdraw 0.5 acre-feet of water per year, which must be recorded by a water meter.
Sec.
This act becomes effective on July 1, 2019.eter.
This act becomes effective on July 1, 2019.
H - *AB95_R1*
~~~~~ 19 80th Session (2019)
View plain text versions (3)

Amendments

1 amendment

Click Show changes on an amendment above to see how it modifies the bill.

Action History

  1. Approved by the Governor. Chapter 304.

  2. Enrolled and delivered to Governor.

  3. In Assembly. To enrollment.

  4. Taken from Secretary's desk. Placed on General File. Read third time. Passed. Title approved. (Yeas: 11, Nays: 10.) To Assembly.

  5. Taken from General File. Placed on Secretary's desk.

  6. Taken from General File. Placed on General File for next legislative day.

  7. Taken from General File. Placed on General File for next legislative day.

  8. Taken from General File. Placed on General File for next legislative day.

  9. Read second time.

  10. From committee: Do pass.

  11. In Senate. Read first time. Referred to Committee on Natural Resources. To committee.

  12. From printer. To engrossment. Engrossed. First reprint. Read third time. Passed, as amended. Title approved. (Yeas: 28, Nays: 12, Excused: 2.) To Senate.

  13. Read second time. Amended. (Amend. No. 48.) To printer.

  14. Taken from Second Reading File. Placed on Second Reading File for next legislative day.

  15. From committee: Amend, and do pass as amended.

  16. Read first time. To committee.

  17. From printer.

  18. Prefiled. Referred to Committee on Natural Resources, Agriculture, and Mining. To printer.

Sponsors

  • Assembly Committee on Natural Resources, Agriculture, and Mining · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 66 not signed on

Sponsors (1)

  • Assembly Committee on Natural Resources, Agriculture, and Mining

Co-sponsors (0)

None.

Not signed on (66)

66 members have not signed on to this bill.

Show all 66 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does AB 95 do?
AN ACT relating to water; requiring the State Engineer to continue to allow withdrawals of groundwater from domestic wells under certain circumstances in groundwater basins where withdrawals have been restricted to conform to priority rights; and providing other matters properly relating thereto.
Who sponsors AB 95?
AB 95 is sponsored by Assembly Committee on Natural Resources, Agriculture, and Mining.
What is the current status of AB 95?
This bill has been enacted into law. Introduced January 24, 2019. Enacted.
Where can I track AB 95?
Track AB 95 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 95

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 95

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →