AB 62 — Revises provisions related to water. (BDR 48-215)
Last action — Approved by the Governor. Chapter 420.
-
✓Introduced
-
✓In Committee
-
✓Passed Assembly
-
✓Passed Senate
-
✓To Executive
-
6Enacted
This bill has been enacted into law. Introduced November 19, 2018. Enacted.
Prognosis
Where this bill stands today.
Odds of enactment
HighHow often bills like it became law.
-
Enacted
Current position in the legislative process.
-
1 sponsor
1 primary, 0 co-sponsors signed on.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
Summary
AN ACT relating to water; requiring the State Engineer to adopt regulations relating to the time for the completion of work and the application of water to beneficial use; requiring the State Engineer to conduct a survey relating to extensions of time to perfect a water right; and providing other matters properly relating thereto.
Bill Text
What changed in the latest version
122 added · 133 removed122 line(s) added, 133 removed.
(ReprintedAssembly withBill amendmentsNo. adopted on May 21, 2019) THIRD REPRINT A.B.
6262–Committee Aon SSEMBLYNatural BILLResources, NOAgriculture, .and Mining CHAPTER..........
62–COMMITTEE ON N ATURAL RESOURCES , GRICULTURE ,AND M INING (ON B EHALF OF THE D IVISION OFW ATER RESOURCES OF THE S TATE DEPARTMENT OF C ONSERVATION AND N ATURAL RESOURCES ) PREFILED N OVEMBER 19, 2018 ____________ Referred to Committee on Natural Resources, Agriculture, and Mining SUMMARY—Revises provisions related to water.
(BDR 48-215) FISCAL NOTE:
Effect on Local Government:
No.
Effect on the State:
No.
~ EXPLANATION – Matter in bolded italics is new;
matter between brackets [omitted material] is material to be omitted.
(1) requires the State Engineer to set a deadline by which the construction related to the appropriation of water must be completed and application of water to beneficial tounder usecertain mustcircumstances. be made;
andWith (2)limited authorizesexceptions, theany Statenumber Engineerof toextensionsnes extendmay thosebe deadlinesgranted, underbut certaina circumstances.single extension may not exceed 5 years.
With(NRS limited533.380, exceptions,533.390, any533.410) numberSection 1.5 of extensionsthis maybill berequires granted,the butState aEngineer singleto extensionadopt mayregulations notto exceedcarry 5out years.these provisions.
(NRS 533.380, 533.390, 533.410) Section 1.5 of this bill requires the State Engineer to adopt regulations to carry outSection 4 of this bill requires the State Engineer to conduct a survey during the 2019-2020manage interimextensions of time to determineperfect howa otherwater jurisdictionsright.ons in the United States manageEXPLANATION extensions– ofMatter timein tobolded perfectitalics ais waternew; right.
-matter *AB62_R3*between –brackets 2[omitted –material] THEis PEOPLEmaterial OFto THEbe STATEomitted. OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
80th Session (2019) – 2 – (2) For which a plan for the development of a project has been approved by the local government pursuant to NRS 278.010 to 278.460, inclusive;
Except as otherwise provided in subsection 4 and NRS 533.395 and 533.4377, the State Engineer may, for good cause shown, grant any number of extensions of time within whichsewhich construction work must be completed, or water must be applied to a beneficial use under any permit therefor issued by the State Engineer, but a single extension of time must not exceed 5 years.
The State Engineer shall not grant an extension of time unless the State Engineer determines from the proof and evidence so submitted - *AB62_R3* – 3 – that the applicant is proceeding in good faith and with reasonable diligence to perfect the application.
80th Session (2019) – 3 – (b) The number of parcels and commercial or residential units which are contained in or planned for the land being developed or the area being served by the county, city, town, public water district or public water company;
-(a) *AB62_R3*Adopt –any 4regulation –necessary to carry out the provisions of this section;
andulationand necessary to carry out the provisions (b) Provide a copy of such regulations to any person upon request.
Sec.Secs.
2.2 and 3.
3.
(Deleted by amendment.) Sec.
80th Session (2019) – 4 – Sec.
H~~~~~ -19 *AB62_R3*80th Session (2019)
View plain text versions (5)
- Enrolled As Enrolled Current pdf
- Reprint 3 View text pdf
- Reprint 2 View text pdf
- Reprint 1 View text pdf
- Introduced As Introduced pdf
Amendments
3 amendmentsClick Show changes on an amendment above to see how it modifies the bill.
Action History
-
Approved by the Governor. Chapter 420.
-
Enrolled and delivered to Governor.
-
Senate Amendment No. 799 concurred in. To enrollment.
-
In Assembly.
-
Taken from Secretary's desk. Placed on General File. Read third time. Passed, as amended. Title approved, as amended. (Yeas: 12, Nays: 9.) To Assembly.
-
From printer. To re-engrossment. Re-engrossed. Third reprint. To Secretary's desk.
-
From committee: Amend, and do pass as amended. Placed on Second Reading File. Read second time. Amended. (Amend. No. 799.) Taken from General File. Placed on Secretary's desk. To printer.
-
In Senate. Read first time. Referred to Committee on Natural Resources. To committee.
-
From printer. To reengrossment. Reengrossed. Second reprint. Read third time. Passed, as amended. Title approved, as amended. (Yeas: 28, Nays: 13, Excused: 1.) To Senate.
-
Taken from Chief Clerk's desk. Placed on General File. Read third time. Amended. (Amend. No. 566.) To printer.
-
From printer. To engrossment. Engrossed. First reprint. To Chief Clerk's desk.
-
Read second time. Amended. (Amend. No. 160.) Placed on Chief Clerk's desk. To printer.
-
From committee: Amend, and do pass as amended.
-
Read first time. To committee.
-
From printer.
-
Prefiled. Referred to Committee on Natural Resources, Agriculture, and Mining. To printer.
Sponsors
- Assembly Committee on Natural Resources, Agriculture, and Mining · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 66 not signed on
Sponsors (1)
- Assembly Committee on Natural Resources, Agriculture, and Mining
Co-sponsors (0)
None.
Not signed on (66)
66 members have not signed on to this bill.
Show all 66 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does AB 62 do?
- AN ACT relating to water; requiring the State Engineer to adopt regulations relating to the time for the completion of work and the application of water to beneficial use; requiring the State Engineer to conduct a survey relating to extensions of time to perfect a water right; and providing other matters properly relating thereto.
- Who sponsors AB 62?
- AB 62 is sponsored by Assembly Committee on Natural Resources, Agriculture, and Mining.
- What is the current status of AB 62?
- This bill has been enacted into law. Introduced November 19, 2018. Enacted.
- Where can I track AB 62?
- Track AB 62 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on AB 62
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of AB 62
Last checked for changes 2 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →