Nevada 2019 Regular Session Status: Enacted

AB 62 — Revises provisions related to water. (BDR 48-215)

Last action — Approved by the Governor. Chapter 420.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Assembly
  4. ✓
    Passed Senate
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced November 19, 2018. Enacted.

Prognosis

Advancing 50% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

AN ACT relating to water; requiring the State Engineer to adopt regulations relating to the time for the completion of work and the application of water to beneficial use; requiring the State Engineer to conduct a survey relating to extensions of time to perfect a water right; and providing other matters properly relating thereto.

Bill Text

What changed in the latest version

122 added · 133 removed

122 line(s) added, 133 removed.

→
Previous
Latest
(Reprinted with amendments adopted on May 21, 2019) THIRD REPRINT A.B.
Assembly Bill No.
62 A SSEMBLY BILL NO .
62–Committee on Natural Resources, Agriculture, and Mining CHAPTER..........
62–COMMITTEE ON N ATURAL RESOURCES , GRICULTURE ,AND M INING (ON B EHALF OF THE D IVISION OFW ATER RESOURCES OF THE S TATE DEPARTMENT OF C ONSERVATION AND N ATURAL RESOURCES ) PREFILED N OVEMBER 19, 2018 ____________ Referred to Committee on Natural Resources, Agriculture, and Mining SUMMARY—Revises provisions related to water.
(BDR 48-215) FISCAL NOTE:
Effect on Local Government:
No.
Effect on the State:
No.
~ EXPLANATION – Matter in bolded italics is new;
matter between brackets [omitted material] is material to be omitted.
the appropriation of water must be completed and application of water to beneficial to use must be made;
(1) requires the State Engineer to set a deadline by which the construction related to the appropriation of water must be completed and application of water to beneficial under certain circumstances.
and (2) authorizes the State Engineer to extend those deadlines under certain circumstances.
With limited exceptions, any number of extensionsnes may be granted, but a single extension may not exceed 5 years.
With limited exceptions, any number of extensions may be granted, but a single extension may not exceed 5 years.
(NRS 533.380, 533.390, 533.410) Section 1.5 of this bill requires the State Engineer to adopt regulations to carry out these provisions.
(NRS 533.380, 533.390, 533.410) Section 1.5 of this bill requires the State Engineer to adopt regulations to carry outSection 4 of this bill requires the State Engineer to conduct a survey during the 2019-2020 interim to determine how other jurisdictions in the United States manage extensions of time to perfect a water right.
Section 4 of this bill requires the State Engineer to conduct a survey during the manage extensions of time to perfect a water right.ons in the United States EXPLANATION – Matter in bolded italics is new;
- *AB62_R3* – 2 – THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
matter between brackets [omitted material] is material to be omitted.
THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
(2) For which a plan for the development of a project has been approved by the local government pursuant to NRS 278.010 to 278.460, inclusive;
80th Session (2019) – 2 – (2) For which a plan for the development of a project has been approved by the local government pursuant to NRS 278.010 to 278.460, inclusive;
Except as otherwise provided in subsection 4 and NRS shown, grant any number of extensions of time within whichse construction work must be completed, or water must be applied to a beneficial use under any permit therefor issued by the State Engineer, but a single extension of time must not exceed 5 years.
Except as otherwise provided in subsection 4 and NRS 533.395 and 533.4377, the State Engineer may, for good cause shown, grant any number of extensions of time within which construction work must be completed, or water must be applied to a beneficial use under any permit therefor issued by the State Engineer, but a single extension of time must not exceed 5 years.
The State Engineer shall not grant an extension of time unless the State Engineer determines from the proof and evidence so submitted - *AB62_R3* – 3 – that the applicant is proceeding in good faith and with reasonable diligence to perfect the application.
The State Engineer shall not grant an extension of time unless the State Engineer determines from the proof and evidence so submitted that the applicant is proceeding in good faith and with reasonable diligence to perfect the application.
(b) The number of parcels and commercial or residential units which are contained in or planned for the land being developed or the area being served by the county, city, town, public water district or public water company;
80th Session (2019) – 3 – (b) The number of parcels and commercial or residential units which are contained in or planned for the land being developed or the area being served by the county, city, town, public water district or public water company;
- *AB62_R3* – 4 – of this section;
(a) Adopt any regulation necessary to carry out the provisions of this section;
andulation necessary to carry out the provisions (b) Provide a copy of such regulations to any person upon request.
and (b) Provide a copy of such regulations to any person upon request.
Sec.
Secs.
2.
2 and 3.
3.
(Deleted by amendment.) Sec.
Sec.
80th Session (2019) – 4 – Sec.
H - *AB62_R3*
~~~~~ 19 80th Session (2019)
View plain text versions (5)

Amendments

3 amendments

Click Show changes on an amendment above to see how it modifies the bill.

Action History

  1. Approved by the Governor. Chapter 420.

  2. Enrolled and delivered to Governor.

  3. Senate Amendment No. 799 concurred in. To enrollment.

  4. In Assembly.

  5. Taken from Secretary's desk. Placed on General File. Read third time. Passed, as amended. Title approved, as amended. (Yeas: 12, Nays: 9.) To Assembly.

  6. From printer. To re-engrossment. Re-engrossed. Third reprint. To Secretary's desk.

  7. From committee: Amend, and do pass as amended. Placed on Second Reading File. Read second time. Amended. (Amend. No. 799.) Taken from General File. Placed on Secretary's desk. To printer.

  8. In Senate. Read first time. Referred to Committee on Natural Resources. To committee.

  9. From printer. To reengrossment. Reengrossed. Second reprint. Read third time. Passed, as amended. Title approved, as amended. (Yeas: 28, Nays: 13, Excused: 1.) To Senate.

  10. Taken from Chief Clerk's desk. Placed on General File. Read third time. Amended. (Amend. No. 566.) To printer.

  11. From printer. To engrossment. Engrossed. First reprint. To Chief Clerk's desk.

  12. Read second time. Amended. (Amend. No. 160.) Placed on Chief Clerk's desk. To printer.

  13. From committee: Amend, and do pass as amended.

  14. Read first time. To committee.

  15. From printer.

  16. Prefiled. Referred to Committee on Natural Resources, Agriculture, and Mining. To printer.

Sponsors

  • Assembly Committee on Natural Resources, Agriculture, and Mining · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 66 not signed on

Sponsors (1)

  • Assembly Committee on Natural Resources, Agriculture, and Mining

Co-sponsors (0)

None.

Not signed on (66)

66 members have not signed on to this bill.

Show all 66 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does AB 62 do?
AN ACT relating to water; requiring the State Engineer to adopt regulations relating to the time for the completion of work and the application of water to beneficial use; requiring the State Engineer to conduct a survey relating to extensions of time to perfect a water right; and providing other matters properly relating thereto.
Who sponsors AB 62?
AB 62 is sponsored by Assembly Committee on Natural Resources, Agriculture, and Mining.
What is the current status of AB 62?
This bill has been enacted into law. Introduced November 19, 2018. Enacted.
Where can I track AB 62?
Track AB 62 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 62

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 62

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →