Nevada 2019 Regular Session Status: Enacted

AB 541 — Authorizes and provides funding for certain projects of capital improvement. (BDR S-1282)

Last action — Chapter 542.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Assembly
  4. ✓
    Passed Senate
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced May 30, 2019. Enacted.

Prognosis

Advancing 50% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

AN ACT relating to projects of capital improvement; authorizing certain expenditures by the State Public Works Division of the Department of Administration; levying a property tax to support the Consolidated Bond Interest and Redemption Fund; making appropriations; and providing other matters properly relating thereto.

Bill Text

What changed in the latest version

957 added · 1033 removed

957 line(s) added, 1033 removed.

→
Previous
Latest
REQUIRES TWO-THIRDS MAJORITY VOTE (§ 19) EXEMPT * A.B.
Assembly Bill No.
541 A SSEMBLY B ILLN O.
541–Committee on Ways and Means CHAPTER..........
541–COMMITTEE ON W AYS AND M EANS M AY 30, 2019 ____________ Referred to Committee on Ways and Means SUMMARY—Authorizes and provides funding for certain projects of capital improvement.
(BDR S-1282) FISCAL NOTE:
Effect on Local Government:
No.
EfExecutive Budget.:
Contains Appropriation included in ~ EXPLANATION – Matter in bolded italics is new;
matter between brackets [omitted material] is material to be omitted.
levying a property tax to support the Consolidated Bond Interest and other matters properly relating thereto.and providing THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
levying a property tax to Fund;
making appropriations;
and providing other matters properly relating thereto.
EXPLANATION – Matter in bolded italics is new;
matter between brackets [omitted material] is material to be omitted.
THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
There is hereby appropriated from the State General Fund to the State Public Works Division of the Department of Administration the sum of $60,842,548 to support the Division in carrying out the program of capital improvements as summarized in this section.
There is hereby appropriated from the State General Administration the sum of $60,842,548 to support the Division in carrying out the program of capital improvements as summarized in this section.
9 Description Project No.
Description Project No.
Groundwater Well Abandonments, Carson City............................................$98,261M05 Elevator Renovation and Modernization, Blasdel Building......................................$246,9357 - *AB541* – 2 – Description Project No.
Groundwater Well Abandonments, Carson City.............................................$98,26105 Elevator Renovation and Modernization, Blasdel Building........................................$246,935 HVAC System Renovation, Capitol Building......................................$2,103,543 AdvSawyer Office Building Renovation....................................$8,101,788 Advance Planning:
Amount HVAC System Renovation, Capitol Building.....................................$2,103,543 Advance Planning:
Renovation and Seismic Retrofit, Heroes Memorial Building and Annex.......................19-P02 $350,094 Statewide ADA Program.....................19-S02 $2,595,083 Statewide Fire and Life Safety Program...............................1$1,631,757 - 80th Session (2019) – 2 – Description Project No.
Grant Sawyer Office Building Renovation...................................$8,101,788 Advance Planning:
Amount Statewide Advance Planning Program...........................19-S$1,917,305 Statewide Paving Program,..................19-S05 $2,276,362 Nevada Army National Guard...........................................$113,666 Construct Parking Addition, Washoe County Armory ..........................19-S05g1$300,481 Statewide Indoor Air Quality – Environmental Program.................19-S06 $188,380 2.
Renovation and Seismic Retrofit, Heroes Memorial Building and Annex .......................19-P$350,094 Statewide ADA Program.....................19-S02$2,595,083 Statewide Fire and Life Safety Program...............................$1,631,757 Statewide Advance Planning Program...........................19$1,917,305 Statewide Paving Program ..................19-S0$2,276,362 Statewide Paving Program, Nevada Army National Guard.........................................$113,6665g Construct Parking Addition, Washoe County Armory ..........................19-S05$300,481 Statewide Indoor Air Quality – Environmental Program.................19-S06 $188,380 2.
19$1,265,275 Advance Planning:
19-M$1,265,275 Advance Planning:
Heavy Equipment Shop and Renovation, Elko............................19$445,486 Advance Planning:
Heavy Equipment Shop and Renovation, Elko............................19-P$445,486 Advance Planning:
Exterior Envelope Protection, Spring Mountain State Park.......................19-P$117,648 3.
Exterior Envelope Protection, Spring Mountain State Park.......................19-P10$117,648 3.
Capital Improvements for the Department of Corrections:
Underground Piping andfor the Department of Corrections:
Underground Piping and Boiler Replacement, Lovelock Correctional Center.......................................$7,614,0020 - *AB541* – 3 – Description Project No.
Boiler Replacement, Lovelock Correctional Center.........................................$7,614,002 Replace Surveillance System, Casa Grande Transitional Housing....................
Amount Replace Surveillance System, Casa Grande Transitional Housing....................
19-M24$1,720,849 Replace Door Locks and Controls – Phase 1, Ely State Prison...................................$3,997,994 Replace Cooling Towers, Southern Desert Correctional Center – Central Plant Building..................
19-M$1,720,849 Replace Door Locks and Controls – Phase 1, Ely State Prison.................................$3,997,994 Replace Cooling Towers, Southern Desert Correctional Center – Central Plant Building..................
19-M43$3,818,124 - 80th Session (2019) – 3 – Description Project No.
19-M$3,818,124 Install Recreation Yard Fencing, Southern Desert Correctional Center and High Desert State Prison..................................$571,412 Advance Planning:
Amount Install Recreation Yard Fencing, Southern Center and High Desert State Prison...................................
Replace Domestic Water and Sanitary Sewer, Northern Nevada Correctional Center.......................................$1,270,30204 Advance Planning:
$571,412 Advance Planning:
Electrical Distribution Upgrade, Northern Nevada Correctional Center.......................................$1,220,81906 Advance Planning:
Replace Domestic Water and Sanitary Sewer, Northern Nevada Correctional Center.........................................$1,270,302 Advance Planning:
Central Plant Renovation, High Desert State Prison.........................19$659,075 4.
Electrical Distribution Upgrade, Northern Nevada Correctional Center.........................................$1,220,819 Advance Planning:
Central Plant Renovation, High Desert State Prison.........................19-P$659,075 4.
Lobby Remodel, Desert Regional Center Building 1391................................1$238,604 Building Demolition, Sierra Regional Center Buildings 16, 17, and 18............................................$265,2399-C18 Upgrade Door Controls, Summit View Youth Center.......................................$1,625,4956 Install Panic Alarm System, Dini- Townsend Hospital.......................
Lobby Remodel, Desert Regional Center Building 1391................................19-$238,604 Building Demolition, Buildings 16, 17, andr 18..............................................$265,239C18 Upgrade Door Controls, Summit View Youth Center.........................................$1,625,495 Install Panic Alarm System, Dini- Townsend Hospital.......................
19-M2$810,265 - *AB541* – 4 – Description Project No.
19-M25 $810,265 Install Sanitary Sewer Macerator, Caliente Youth Center................................
Amount Install Sanitary Sewer Macerator, Caliente Youth Center................................
19-$444,954 Electrical Upgrade, Caliente Youth Center..................
1$444,954 Electrical Upgrade, Caliente Youth Center..................
19-M49 $930,425 - 80th Session (2019) – 4 – Description Project No.
19-M49$930,425 Replace Main Electrical Switchgear, Southern Nevada Adult Mental Health Services - Building 3....................................$388,875 5.
Amount Replace Main Electrical Switchgear, Southern Health Services -al Building 3.....................................
$388,875 5.
$11,552,659 7.
19$11,552,659 7.
Show all 158 changed rows (118 more)
Previous
Latest
Cemetery Expansion, Southern Nevada Veterans Memorial Cemetery......................................$161,329 Columbarium Expansion, Northern Nevada Veterans Memorial Cemetery......................................$175,371 Replace Domestic Hot Water Storage Tank, Southern Nevada Veterans Home.............................
Cemetery Expansion, Southern Nevada Veterans Memorial Cemetery.......................................1$161,329 Columbarium Expansion, Northern Nevada Veterans Memorial Cemetery.......................................1$175,371 Replace Domestic Hot Southern Nevadaank, Veterans Home.............................
19-M$70,722 Replace Culinary Refrigeration Units, Southern Nevada Veterans Home.............................
19-M04$70,722 Replace Culinary Refrigeration Units, Southern Nevada Veterans Home.............................
19-$363,424 Pavilion Renovation, Northern Nevada Veterans Memorial Cemetery......................................$153,534 - *AB541* – 5 – Description Project No.
19-M0$363,424 Pavilion Renovation, Northern Nevada Veterans Memorial Cemetery......................................
Amount 8.
1$153,534 8.
19-$591,973 Construct Water Wells and Water Systems, Wildlife Management Area Sites....................................$150,972 Sec.
19-M3$591,973 - 80th Session (2019) – 5 – Description Project No.
Amount Construct Water Wells and Water Systems, Area Sites.....................................
$150,972 Sec.
Replace Rooftop Unit – Department of Motor Vehicles, Carson City...................
Replace Rooftop Unit – Vehicles, Carson City...................
19-M3$451,031 Warehouse Loading Dock Upgrades, Department of Motor Vehicles, Carson City...................................$192,868 Exterior Building Repairs, Department of Motor Vehicles, Carson City...................
19-M37 $451,031 Warehouse Loading Dock Upgrades, Department of Motor Vehicles, Carson City...................................
19-M5$676,142 Replace Boiler, Department of Motor Vehicles, Henderson ....................
1$192,868 Exterior Building Repairs, Department of Motor Vehicles, Carson City...................
19-M5$523,475 - *AB541* – 6 – Description Project No.
19-M55 $676,142 Replace Boiler, Department of Motor Vehicles, Henderson ....................
Amount HVAC System Replacement, Department of Motor Vehicles, Donovan Way Express Office, Las Vegas.....................................$338,220 Advance Planning:
19-M56 $523,475 HVAC System Replacement, Department of Motor Vehicles, Donovan Way Express Office, Las Vegas.....................................
HVAC Renovation, Department of Motor Vehicles, Carson City.....................19-P$473,693 Statewide ADA Program, Highway Funds ............................19-S$211,466 Statewide Fire and Life Safety Program, Highway Funds ............................19-S$639,920 Statewide Paving Program, Highway Funds ............................19-S$928,690 Capital Improvements for the Department of Motor Vehicles:
1$338,220 - 80th Session (2019) – 6 – Description Project No.
Completion of South Reno Department of Motor Vehicles Service Office.................19-C0$2,917,776 Capital Improvements for the Department of Public Safety:
Amount Advance Planning:
Renovation of Department of Public Safety Training Division Building.....................................$1,488,691 Sec.
HVAC Renovation, Vehicles, Carson City.....................19-P05$473,693 Statewide ADA Program, Highway Funds ............................19-S02$211,466 Statewide Fire and Life Safety Program, Highway Funds ............................19-S03$639,920 Statewide Paving Program, Highway Funds ............................19-S05$928,690 Capital Improvements for the Department of Motor Vehicles:
Completion of South Reno Department of Motor Vehicles Service Office.................19-C01$2,917,776 Capital Improvements for the Department of Public Safety:
Renovation of Department of Public Safety Training Division Building......................................$1,488,691 Sec.
Any remaining balance of the appropriations made by section 3 of this act must not be committed for expenditure after June 30, 2023, by the entity to which the appropriation is made or any entity to which money from the appropriation is granted or otherwise transferred in any manner, and any portion of the appropriated money remaining must not be spent for any purpose after September 15, 2023, by either the entity to which the money was appropriated or the entity to which the money was subsequently granted or transferred, and must be reverted to the State Highway Fund on or before September 15, 2023.
Any remaining balance of the appropriations made by section 3 of this act must not be committed for expenditure after June 30, 2023, by the entity to which the appropriation is made or any entity to which money from the appropriation is granted or otherwise transferred in any manner, and any portion of the after September 15, 2023, by either the entity to which the money was appropriated or the entity to which the money was subsequently granted or transferred, and must be reverted to the State Highway Fund on or before September 15, 2023.
The amounts appropriated pursuant to section 3 of this act from the State Highway Fund must be allocated by the State Controller as the money is required for the projects listed in section 3 of this act and must not be transferred to those projects until required to make contract payments.
The amounts appropriated pursuant to section 3 of this act from the State Highway Fund must be allocated by the State Controller as the money is required for the projects listed in section of this act and must not be transferred to those projects until required to make contract payments.
- *AB541* – 7 – Sec.
Sec.
The capital improvements summarized in this section are to be paid with proceeds of general obligation bonds of the State of Nevada in an amount not to exceed $189,469,121;
The capital improvements summarized in this section are to be paid with proceeds of general obligation bonds of the State of - 80th Session (2019) – 7 – Nevada in an amount not to exceed $189,469,121;
provided that $41,610 of the proceeds of general obligation bonds of the State of Nevada issued pursuant to section 1 of chapter 440, Statutes of Nevada 2009, at page 2456, shall be reallocated to the capital improvements summarized in this section and spent before the expenditure of the proceeds of any general obligation bonds of the State of Nevada issued pursuant to this section;
provided that $41,610 of the proceeds of general obligation bonds of the State of Nevada issued pursuant to section 1 of chapter 440, Statutes of Nevada 2009, at page 2456, shall be reallocated to the capital expenditure of the proceeds of any general obligation bonds of the State of Nevada issued pursuant to this section;
Marlette Lake Dam Rehabilitation, Marlette Lake Water System.......................19-C0$3,599,359 Emergency Generator and Service Entrance Upgrade, Reno Purchasing Warehouse.................
Marlette Lake Dam Rehabilitation, Marlette Lake Water System.......................19-C08$3,599,359 EmerService Entranceand Upgrade, Reno Purchasing Warehouse.................
19-M07 $980,301 Central Plant Renovation, State Library and Archives.....................................$2,085,239 - *AB541* – 8 – Description Project No.
19-M07 $980,301 Central Plant Renovation, State Library and Archives......................................$2,085,239 Generator, Controls Replacement and Pump System Modifications, Marlette Lake Water System..........................................$905,574 Central Plant Renovation, Paul Laxalt State Office Building......................................$1,579,086 - 80th Session (2019) – 8 – Description Project No.
Amount Generator, Controls Replacement and Pump System Modifications, Marlette Lake Water System........................................$905,5741 Central Plant Renovation, Paul Laxalt State Office Building.....................................$1,579,086 Central Plant Renovation, Attorney General’s Office Building.............................
Amount Central Plant Renovation, Attorney General’s Electrical Coordination.........................
$1,486,657 Electrical Coordination Studies, Various Buildings Statewide .....................
19$1,486,657 Studies, Various Buildings Statewide .....................
19-M$627,897 Statewide Roofing Program......................................$9,975,568 2.
19-M51 $627,897 Statewide Roofing Program........................................$9,975,568 2.
$762,029 Replace Comfort Stations, Valley of Fire State Park .........................................$636,017-M50 4.
19-$762,029 Replace Comfort Stations, Valley of Fire State Park ............................................$636,0170 4.
Electrical Outlet and Cable Upgrades, High Desert State Prison.................................$1,653,626 Boiler Replacement, Ely State Prison.................................$6,705,522 Replace Domestic and Heating Hot Water Piping, Ely State Prison, Housing Unit 1.................
Electrical Outlet and Cable Upgrades, High Desert State Prison...................................$1,653,626 Boiler Replacement, Ely Replace Domestic and...............................$6,705,522 Heating Hot Water Piping, Ely State Prison, Housing Unit 1.................
19-M1$2,090,872 Central Plant Renovations, Phase 2, Northern Nevada Correctional Center.......................................$7,649,6692 HVAC Replacement, Ely State Prison, Building 9................
19-M11 $2,090,872 Central Plant Renovations, Phase 2, Northern Nevada Correctional Center.........................................$7,649,669 HVAC Replacement, Ely State Prison, Building 9................
19-M$1,750,456 - *AB541* – 9 – Description Project No.
19-M15$1,750,456 HVAC System Renovations, Northern Nevada Correctional Center Operations, Administration Buildings, and Housing Unit 6.........................................$1,768,350 - 80th Session (2019) – 9 – Description Project No.
Amount HVAC System Renovations, Northern Nevada Correctional Center Operations, Administration Buildings, and Housing Unit 6......................................$1,768,350M28 5.
Amount 5.
Replace Flooring, Caliente Youth Center, Multi- Purpose Building..........................
ReplYouth Center, Multi-te Purpose Building..........................
1$1,605,161 Replace Chiller, Caliente Youth Center, Administration Building......................................$464,9662 6.
19-$1,605,161 Replace Chiller, Caliente Youth Center, Administration Building........................................$464,966 6.
National Guard Speedway Readiness Center Completion..................................$3,393,905 Emergency Generator Installation, Washoe County Armory ............................
National Guard Speedway Readiness Center Completion....................................$3,393,905 Emergency Generator Installation, Washoe County Armory ............................
19-$801,864 HVAC Systems Renovation, Washoe County Armory ............................
19-M2$801,864 HVAC Systems Renovation, Washoe County Armory ............................
1$1,153,397 HVAC Systems Renovation, Office of the Adjutant General....................
19-$1,153,397 HVAC Systems Renovation, Office of the Adjutant General....................
19-M3$929,375 Replace Overhead Coiling Doors, Seals and Operators, Various Locations.....................................$356,159 Replace Heat Pump Water Piping Distribution, Carlin Readiness Center......................................$1,170,15258 7.
19-M32 $929,375 Replace Overhead Coiling Doors, Seals and Operators, Various Replace Heat Pump Water............................
$356,159 Piping Distribution, Carlin Readiness Center........................................$1,170,152 7.
Construct Education Academic Building, Nevada State College....................19-$55,852,093 - *AB541* – 10 – Description Project No.
Construct Education Academic Building, Nevada State College....................19-C1$55,852,093 Construct Health and Sciences Building, College of Southern Nevada.......................................$70,763,741 - 80th Session (2019) – 10 – Description Project No.
Amount Construct Health and Sciences Building, College of Southern Nevada.....................................$70,763,7418 8.
Amount 8.
Renovation of Department of Public Safety Training Division Building.....................................$1,169,686 9.
Renovation of Department Training Division Building......................................$1,169,686 9.
Renovation of Collections Storage Building 19, Stewart Campus ............................19-$947,750 Storage Facility Addition, Indian Hills Curatorial Center.......................................$1,273,0137 Replace Sanitary Sewer and Upgrade Restrooms, Lost City Museum........................................$408,484 Replace Lighting Control System, Nevada State Museum, Las Vegas.....................
Renovation of Collections Storage Building 19, Stewart Campus ............................19-C1$947,750 Storage Facility Addition, Indian Hills Curatorial Center........................................$1,273,013 Replace Sanitary Sewer and Upgrade Restrooms, Lost City Museum........................................
1$408,484 Replace Lighting Control System, Nevada State Museum, Las Vegas.....................
Construct Water Wells and Water Systems, Various Fish Hatchery Sites........................................$2,473,141M14 Construct Water Wells and Water Systems, Wildlife Management Area Sites....................................$215,002 Sec.
Construct Water Wells and Water Systems, Various Fish Hatchery Sites.........................................$2,473,14114 ConsWater Systems,lls and Wildlife Management Area Sites.....................................
$215,002 Sec.
Except as otherwise provided in subsection 2, the State Board of Finance shall issue general obligation bonds of the State of Nevada in the face amount of not more than $5,344,346 for the project numbered and identified in the Executive Budget for the 2019-2021 biennium and otherwise described as Project 19-C01, Completion of South Reno Department of Motor Vehicles Service - *AB541* – 11 – Office.
Except as otherwise provided in subsection 2, the State Board of Finance shall issue general obligation bonds of the State of Nevada in the face amount of not more than $5,344,346 for the project numbered and identified in the Executive Budget for the 2019-2021 biennium and otherwise described as Project 19-C01, Completion of South Reno Department of Motor Vehicles Service Office.
2.
- 80th Session (2019) – 11 – described in subsection 1 unless the Board determines that the money budgeted or to be budgeted pursuant to subsection 3 will be sufficient to pay the bond repayment costs of the bonds authorized by subsection 1.
The State Board of Finance shall not issue the bonds described in subsection 1 unless the Board determines that the money budgeted or to be budgeted pursuant to subsection 3 will be sufficient to pay the bond repayment costs of the bonds authorized by subsection 1.
The Legislature intends that 12.0 percent of the annual bond repayment costs of the bonds authorized by subsection 1, and any bonds directly or indirectly, through a series of refundings, refunding those bonds, will be paid from the Pollution Control Account created by NRS 445B.830, and 88.0 percent of those annual bond repayment costs will be paid from annually available money in the State Highway Fund.
The Legislature intends that 12.0 percent of the annual bond repayment costs of the bonds authorized by subsection 1, and any bonds directly or indirectly, through a series of refundings, refunding those bonds, will be paid from the Pollution Control Account created by NRS 445B.830, and 88.0 percent of those annual bond repayment costs will be paid from annually available Finance in the Office of the Governor, the Director of thee of Department of Transportation and the Director of the Department of Motor Vehicles are hereby directed to budget for payment of such bond repayment costs from the sources and in the proportions stated in this subsection in each budget or other spending plan presented to the Legislature for the expenditure of amounts in the Pollution Control Account created by NRS 445B.830 and the State Highway Fund after the effective date of this section until the bonds authorized by subsection 1 and any bonds directly or indirectly refunding those bonds are no longer outstanding.
The Director of the Office of Finance in the Office of the Governor, the Director of the Department of Transportation and the Director of the Department of Motor Vehicles are hereby directed to budget for payment of such bond repayment costs from the sources and in the proportions stated in this subsection in each budget or other spending plan presented to the Legislature for the expenditure of amounts in the Pollution Control Account created by NRS 445B.830 and the State Highway Fund after the effective date of this section until the bonds authorized by subsection 1 and any bonds directly or indirectly refunding those bonds are no longer outstanding.
As used in this subsection, “annually available money in the State Highway Fund” means money remaining in the State Highway Fund in any year after all amounts required to pay bonds issued pursuant to NRS 408.273 in that year have been paid or provision for such payment has been made.
As used in this means money remaining in the State Highway Fund in any yearFund” after all amounts required to pay bonds issued pursuant to NRS 408.273 in that year have been paid or provision for such payment has been made.
- *AB541* – 12 – Sec.
- 80th Session (2019) – 12 – authorized in section 8 of this act must not be committed for expenditure after June 30, 2023, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 15, 2023.
9.
Any remaining balance of the allocated amounts authorized in section 8 of this act must not be committed for expenditure after June 30, 2023, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 15, 2023.
The amounts temporarily advanced by the State Controller must be made as the money is required for the projects and must not be transferred to the projects from the State General Fund until required to make contract payments.
The amounts temporarily advanced by the State Controller must be made as the money is required for the General Fund until required to make contract payments.
The advanced amounts must be repaid immediately to the State General Fund upon the issuance of the bonds or not later than the last business day in August immediately following the end of the fiscal year during which the advance is made.
Thethe State advanced amounts must be repaid immediately to the State General Fund upon the issuance of the bonds or not later than the last business day in August immediately following the end of the fiscal year during which the advance is made.
The advanced amounts must be repaid immediately to the State Highway Fund upon the issuance of the bonds or not later than the last business day in August immediately following the end of the fiscal year during which the advance is made.
The advanced upon the issuance of the bonds or not later than the last business day in August immediately following the end of the fiscal year during which the advance is made.
The Director of the Office of Finance in the Office of the Governor shall provide written notification to the State Controller, the State Treasurer and the Senate and Assembly Fiscal Analysts of the Fiscal Analysis Division of the Legislative Counsel Bureau of the approval of any advance from the State General Fund and the State Highway Fund to the State Public Works Division of the Department of Administration pursuant to subsection 2 or 3.
The Director of the Office of Finance in the Office of the Governor shall provide written notification to the State Controller, the State Treasurer and the Senate and Assembly Fiscal Analysts of the Fiscal Analysis Division of the Legislative Counsel Bureau of the approval of any advance from the State General Fund and the State Highway Fund to the State Public Works Division of the - 80th Session (2019) – 13 – Department of Administration pursuant to subsection 2 or 3.
The Director of the Office of Finance in the Office of the Governor shall - *AB541* – 13 – provide a reconciliation to the Senate and Assembly Fiscal Analysts of the Fiscal Analysis Division of the Legislative Counsel Bureau of the advances authorized from the State General Fund and State Highway Fund and repayments to the State General Fund and the State Highway Fund made during any fiscal year during the 2019- 2021 biennium.
The Director of the Office of Finance in the Office of the Governor shall provide a reconciliation to the Senate and Assembly Fiscal Analysts of the Fiscal Analysis Division of the Legislative Counsel Bureau of Highway Fund and repayments to the State General Fund and the State Highway Fund made during any fiscal year during the 2019- biennium.
Amount Completion of South Reno Department of Motor Vehicles Service Office......................19-C$605,878 Cemetery Expansion, Southern Nevada Veterans Memorial Cemetery............................19-$4,144,981 Columbarium Expansion, Northern Nevada Veterans Memorial Cemetery............................19-$4,179,668 Marlette Lake Dam Rehabilitation, Marlette Lake Water System ............................19$9,457,681 Heavy Equipment Simulator Classrooms, High Desert State Prison.....................................$808,85113 Storage Facility Addition, Indian Hills Curatorial Center...........................................$100,000-C17 Construct Education Academic Building, Nevada State College .........................19$6,000,000 Construct Health and Sciences Building, College of Southern Nevada ................................$6,000,000 Replace Domestic Hot Water Storage Tank, Southern Nevada Veterans Home.....................
Amount Completion of South Reno Department of Motor Vehicles Service Office......................19-C01$605,878 Cemetery Expansion, Southern Nevada Veterans Memorial Cemetery............................19-C0$4,144,981 Columbarium Expansion, Northern Nevada Veterans Memorial Cemetery............................19-C0$4,179,668 Marlette Lake Dam Lake Water System ............................19-C$9,457,681 Heavy Equipment Simulator Classrooms, High Desert State Prison.......................................$808,851 Storage Facility Addition, Indian Hills Curatorial Center.............................................$100,00017 Construct Education Academic Building, Nevada State College .........................19-C$6,000,000 Construct Health and Sciences Building, College of Southern Nevada ................................19$6,000,000 - 80th Session (2019) – 14 – Description Project No.
19-M04 $123,332 Replace Magnetic Door Controls, Southern Nevada State Veterans Home.........................
Amount Replace Domestic Hot Water Storage Tank, Southern Replace Magnetic Doorme.....................
19-M$226,668 - *AB541* – 14 – Description Project No.
19-M04 $123,332 Controls, Southern Nevada State Veterans Home.........................
Amount Emergency Generator Installation, Washoe County Armory..................................
19-M19$226,668 Emergency Generator Installation, Washoe County Armory..................................
1$701,913 HVAC Systems Renovation, Washoe County Armory....................
19-$701,913 HVAC Systems Renovation, Washoe County Armory....................
19-M31$1,018,371 HVAC Systems Renovation, Office of the Adjutant General..........................................$811,395M32 Replace Overhead Coiling Doors, Seals and Operators, Various Locations........................................$311,61634 HVAC Systems Renovation, Wildlife Management Area Sites ......................................$404,276M38 Construct Water Wells and Water Systems, Wildlife Management Area Sites.....................
19-M31 $1,018,371 HVAC Systems Renovation, Office of the Adjutant General............................................$811,3952 Replace Overhead Coiling Doors, Seals and Operators, Various Locations..........................................$311,616 HVAC Systems Renovation, Wildlife Management Area Sites ........................................$404,2768 Construct Water Wells and Water Systems, Wildlife Management Area Sites.....................
19-M40$846,408 Replace Rooftop Unit and Lighting Upgrade, Plumb Lane Armory .....................................$279,755 Replace Heat Pump Water Piping Distribution, Carlin Readiness Center...............................
19-M40 $846,408 Replace Rooftop Unit and Lane Armory .....................................
1$265,234 Statewide Advance Planning Program..........................................$200,000S04 Statewide Paving Program, Nevada Army National Guard.............................................$98,615S05g Construct Parking Addition, Washoe County Armory..................19-S05g1 $692,729 Statewide Indoor Air Quality, Environmental Program.......................19-S0$100,000 Statewide Building Official Program........................................$1,089,157S09 2.
1$279,755 Replace Heat Pump Water Piping Distribution, Carlin Readiness Center...............................
The State Public Works Division of the Department of Administration shall not execute a contract for construction of a project listed in subsection 1 until the Division has determined that the funding authorized in subsection 1 for the project has been awarded or received and is available for expenditure for the project.
19-$265,234 Statewide Advance Planning Program............................................$200,0004 Statewide Paving Program, Nevada Army National Guard...............................................$98,6155g Construct Parking Addition, Washoe County Armory..................19-S05g1 $692,729 Statewide Indoor Air Quality, Environmental Program.......................19-S06 $100,000 Statewide Building Official Program..........................................$1,089,1579 - 80th Session (2019) – 15 – Administration shall not execute a contract for construction of a project listed in subsection 1 until the Division has determined that the funding authorized in subsection 1 for the project has been awarded or received and is available for expenditure for the project.
- *AB541* – 15 – Every contract pertaining to the work must be approved by the Attorney General.
Every contract pertaining to the work must be approved by the Attorney General.
The State Board of Finance shall issue general obligation bonds of the State of Nevada in the face amount of not more than $3,000,000 in the 2019-2021 biennium as provided in NRS 383.530 for the program for awarding financial assistance to pay the actual expenses of preserving or protecting historical buildings to be used to develop a network of cultural centers and activities.
The State Board of Finance shall issue general obligation bonds of the State of Nevada in the face amount of not NRS 383.530 for the program for awarding financial assistance to pay the actual expenses of preserving or protecting historical buildings to be used to develop a network of cultural centers and activities.
The State Board of Finance shall issue general obligation bonds of the State of Nevada in the face amount of not more than $3,000,000 in the 2019-2021 biennium as provided in NRS 349.986 for the program for providing grants for water conservation and capital improvements to certain water systems.
The State Board of Finance shall issue general obligation bonds of the State of Nevada in the face amount of not more than $3,000,000 in the 2019-2021 biennium as provided in conservation and capital improvements to certain water systems.
and 2.
and - 80th Session (2019) – 16 – 2.
An ad valorem tax of 15.75 cents on each $100 of assessed valuation of taxable property is hereby levied for Fiscal Year 2019-2020, and an ad valorem tax of 15.75 cents on each $100 of assessed valuation is hereby levied for Fiscal Year 2020-2021.
An ad valorem tax of 15.75 cents on each $100 of Year 2019-2020, and an ad valorem tax of 15.75 cents on each $100l of assessed valuation is hereby levied for Fiscal Year 2020-2021.
Notwithstanding the provisions of NRS 361.453 to the contrary, 0.75 cents of the levies imposed pursuant to this subsection must not be included in - *AB541* – 16 – calculating the limitation set forth in subsection 1 of NRS 361.453 on the total ad valorem tax levied for all public purposes.
Notwithstanding the provisions of NRS 361.453 to the contrary, 0.75 cents of the levies imposed pursuant to this subsection must not be included in calculating the limitation set forth in subsection 1 of NRS 361.453 on the total ad valorem tax levied for all public purposes.
Notwithstanding the provisions of NRS 361.453 to the contrary, the levies imposed pursuant to this subsection must not be included in calculating the limitation set forth in subsection 1 of NRS 361.453 on the total ad valorem tax levied for all public purposes.
Notwithstanding the provisions of NRS 361.453 to the included in calculating the limitation set forth in subsection 1 ofe NRS 361.453 on the total ad valorem tax levied for all public purposes.
If the sum of that estimate and the balance of ad valorem reserves in the Consolidated Bond Interest and Redemption Fund is less than the total obligation of the State of Nevada for payment of the interest on and principal of bonds which will become due in the fiscal year, the State Treasurer shall ask the State Controller to reserve in the State General Fund an amount which is sufficient to pay the remainder of the total obligation.
If the sum of that estimate and the balance of ad valorem reserves in the Consolidated Bond Interest and Redemption Fund is less than the total obligation of the State of Nevada for payment of the interest on and principal of bonds which - 80th Session (2019) – 17 – will become due in the fiscal year, the State Treasurer shall ask the State Controller to reserve in the State General Fund an amount which is sufficient to pay the remainder of the total obligation.
2.
Redemption Fund is insufficient to pay those obligations as they become due, the State Controller shall cause the money in reserve to be transferred from the State General Fund to the Consolidated Bond Interest and Redemption Fund.
If the money in the Consolidated Bond Interest and Redemption Fund is insufficient to pay those obligations as they become due, the State Controller shall cause the money in reserve to be transferred from the State General Fund to the Consolidated Bond Interest and Redemption Fund.
- *AB541* – 17 – 3.
3.
The State Board of Finance, in its capacity as the State General Obligation Bond Commission and to the extent that money is available, shall pay the expenses related to the issuance of general obligation bonds approved by the 80th Session of the Nevada Legislature from the proceeds of those bonds.
The State Board of Finance, in its capacity as the State General Obligation Bond Commission and to the extent that money is available, shall pay the expenses related to the issuance of Nevada Legislature from the proceeds of those bonds.n of the Sec.
Sec.
As used in this subsection, “bond repayment costs” means the principal, interest and related costs of issuance of the bonds and any other costs related to the payment of the bonds or compliance with covenants made in connection with those bonds, as estimated by the State Treasurer.
As used in this subsection, “bond repayment costs” means the principal, interest and related costs of issuance of the - 80th Session (2019) – 18 – compliance with covenants made in connection with those bonds, as estimated by the State Treasurer.
The money collected pursuant to the annual tax on slot machines imposed pursuant to NRS 463.385 that is distributed to the Special Capital Construction Fund for Higher - *AB541* – 18 – Education, except any amount of that money which is needed to pay the principal and interest on bonds, is appropriated to the State Public Works Division of the Department of Administration in the sum of $3,447,341 for the project numbered and described in the Executive Budget for the 2019-2021 biennium or otherwise described as project 19-M08, Deferred Maintenance, Nevada System of Higher Education.
The money collected pursuant to the annual tax on slot machines imposed pursuant to NRS 463.385 that is distributed to the Special Capital Construction Fund for Higher the principal and interest on bonds, is appropriated to the State Public Works Division of the Department of Administration in the sum of $3,447,341 for the project numbered and described in the Executive Budget for the 2019-2021 biennium or otherwise described as project 19-M08, Deferred Maintenance, Nevada System of Higher Education.
Any remaining balance of the appropriation made by subsection 1 must not be committed for expenditure after June 30, 2023, by the entity to which the appropriation is made or any entity to which money from the appropriation is granted or otherwise transferred in any manner, and any portion of the appropriated money remaining must not be spent for any purpose after September 15, 2023, by either the entity to which the money was appropriated or the entity to which the money was subsequently granted or transferred, and must be reverted to the fund of origin on or before September 15, 2023.
Any remaining balance of the appropriation made by subsection 1 must not be committed for expenditure after June 30, 2023, by the entity to which the appropriation is made or any entity to which money from the appropriation is granted or otherwise transferred in any manner, and any portion of the appropriated money remaining must not be spent for any purpose after September 15, 2023, by either the entity to which the money was appropriated or the entity to which the money was subsequently granted or transferred, and must be reverted to the fund of origin on or Sec.
Sec.
Except as otherwise provided in this section, any remaining balance of the allocated amounts authorized in section 1 of chapter 440, Statutes of Nevada 2009, at page 2456, must not be committed for expenditure after June 30, 2013, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 20, 2013.
Except as otherwise provided in this section, any remaining balance of the allocated amounts authorized in section 1 of chapter 440, Statutes of Nevada 2009, at page 2456, must not be committed for expenditure after June 30, 2013, and must be reverted to the Bond Interest and - 80th Session (2019) – 19 – Redemption Fund on or before September 20, 2013.rest and 2.
2.
09-C04 (b) Medical Education Learning Lab Building, UNHSS..................................09-C05 (c) Field maintenance shop facility at the Las Vegas Readiness Center ..........................................09-C13 - *AB541* – 19 – Description Project No.
09-C04 (b) Medical Education Learning Lab Building, UNHSS..................................09-C05 (c) Field maintenance shop Readiness Center ..........................................09-C13 (d) New Elko County Readiness Center............................................................09-C15 (e) Water supply backflow prevention for the Bradley Building and Stewart Facility........................................................09-M02a (f) Well replacement at the Nevada Youth Training Center...........................................................
(d) New Elko County Readiness Center............................................................09-C15 (e) Water supply backflow prevention for the Bradley Building and Stewart Facility........................................................09-M02a (f) Well replacement at the Nevada Youth Training Center...........................................................
Any remaining balance of the allocated amounts authorized in section 1 of chapter 440, Statutes of Nevada 2009, at page 2456, for the following project, must not be committed for expenditure after June 30, 2014, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 19, 2014:
Any remaining balance of the allocated amounts authorized in section 1 of chapter 440, Statutes of Nevada committed for expenditure after June 30, 2014, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 19, 2014:
Statewide Advance Planning Program...............................................................09-S04 4.
Statewide Advance Planning Program...............................................................09-S04 - 80th Session (2019) – 20 – authorized in section 1 of chapter 440, Statutes of Nevada 2009, at page 2456, for the project 09-C14, New readiness center – North Las Vegas, must not be committed for expenditure after June 30, 2017, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 15, 2017.
Any remaining balance of the allocated amounts authorized in section 1 of chapter 440, Statutes of Nevada 2009, at page 2456, for the project 09-C14, New readiness center – North Las Vegas, must not be committed for expenditure after June 30, 2017, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 15, 2017.
or (b) Be transferred for expenditure on the projects numbered and described in the Executive Budget for the 2019-2021 biennium or otherwise described in section 6 of this act.
or (b) Be transferred for expenditure on the projects 2019-2021 biennium or otherwise described in section 6 of this act.
- *AB541* – 20 – Sec.
Sec.
(a) Not be committed for expenditure after June 30, 2019, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 20, 2019 [.] ;
and must be reverted to the Bond Interest and Redemption019, Account in the Consolidated Bond Interest and Redemption Fund on or before September 20, 2019 [.] ;
Description Project No.
- 80th Session (2019) – 21 – Description Project No.
Replace Emergency Generator, Buildings 1306 and 1391 – Desert Regional Center 13-M33 Shower and Bathroom Renovations and Sealing of Exterior Expansion Joints and Painting – Florence McClure Women’s Correctional Center 13-M41 Advance Planning through Bid Documents for a 96 Bed Northern Nevada State Veterans Home 13-P07 Sec.
Replace Emergency Generator, Buildings 1306 and 1391 – Desert Regional Center 13-M33 Showand Sealing of Exteriorions Expansion Joints and Painting – Florence McClure Women’s Correctional Center 13-M41 Advance Planning through Bid Documents for a 96 Bed Northern Nevada State Veterans Home 13-P07 Sec.
Except as otherwise provided in subsection 2, any remaining balance of the amount transferred in section 20 of chapter 445, Statutes of Nevada 2013, at page 2583, must not be committed for expenditure after June 30, 2017, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Interest and Redemption Fund on or before September 15, 2017.
Except as otherwise provided in subsection 2, any remaining balance of the amount transferred in section of chapter 445, Statutes of Nevada 2013, at page 2583, must not be committed for expenditure after June 30, 2017, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Interest and Redemption Fund on or before September 15, 2017.
- *AB541* – 21 – 2.
2.
(a) Not be committed for expenditure after June 30, 2019, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 20, 2019 [.] ;
(a) Not be committed for expenditure after June 30, 2019, Account in the Consolidated Bond Interest and Redemption Fund on or before September 20, 2019 [.] ;
Water Production Well – Indian Springs Prison Complex Advance Planning through Bid Documents for a 96 Bed Northern Nevada State Veterans Home 13-P07 Sec.
Water Production Well – Indian Springs Prison Complex Advance Planning through Bid Documents for a 96 Bed Northern Nevada State Veterans Home 13-P07 - 80th Session (2019) – 22 – page 3935, is hereby amended to read as follows:f Nevada 2015, at Sec.
28.
Section 2 of chapter 549, Statutes of Nevada 2015, at page 3935, is hereby amended to read as follows:
Sec.
Any remaining balance of the appropriation made by section 1 of chapter 549, Statutes of Nevada 2015, at page 3934, for project 15-P03, Advance Planning, Master Plan for Campus Buildings and Welcome Center in Building 2, Stewart Facility, must not be committed for expenditure after June 30, 2021, by the entity to which the appropriation is made or any entity to which money from the appropriation is granted or otherwise transferred in any manner, and any portion of the appropriated money remaining must not be spent for any purpose after September 17, 2021, by either the entity to which the money - *AB541* – 22 – was appropriated or the entity to which the money was subsequently granted or transferred, and must be reverted to the State General Fund on or before September 17, 2021.
Any remaining balance of the appropriation made page 3934, for project 15-P03, Advance Planning, Mastert Plan for Campus Buildings and Welcome Center in Building 2, Stewart Facility, must not be committed for expenditure after June 30, 2021, by the entity to which the appropriation is made or any entity to which money from the appropriation is granted or otherwise transferred in any manner, and any portion of the appropriated money remaining must not be spent for any purpose after September 17, 2021, by either the entity to which the money was appropriated or the entity to which the money was subsequently granted or transferred, and must be reverted to the State General Fund on or before September 17, 2021.
[Any] 1.
[Any] remaining balance of the allocated amounts authorized iny section 6 of [this act] chapter 549, Statutes of Nevada 2015, at page 3936, must [not] :
Except as otherwise provided in subsection 2, any remaining balance of the allocated amounts authorized in section 6 of [this act] chapter 549, Statutes of Nevada 2015, at page 3936, must [not] :
or (b) Be transferred for expenditure on the projects numbered and described in the Executive Budget for the 2019-2021 biennium or otherwise described in section 6 of this act.
or (b) Be transferred for expenditure on the projects numbered and described in the Executive Budget for the - 80th Session (2019) – 23 – 2019-2021 biennium or otherwise described in section 6 of this act.
Any remaining balance of the allocated amounts authorized in section 6 of chapter 549, Statutes of Nevada 2015, at page 3936, for the following projects, must not be committed for expenditure after June 30, 2021, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 17, 2021.
Any remaining balance of the allocated amounts authorized in section 6 of chapter 549, Statutes of Nevada committed for expenditure after June 30, 2021, and must bee reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 17, 2021.
Construct New Northern Nevada State Veterans Home 15-C77 Electrical System Upgrades, Nevada Youth Training Center 15-M16 HVAC Renovation, Northern Nevada Adult Mental Health Services Building 2 15-M19 Ductwork Replacement, Lake’s Crossing 15-M20 Upgrade Basement Heating and Drainage Improvements, Nevada State Museum, Carson City 15-M38 Central Plant Improvements, Nevada Youth Training Center Education and Multi-Purpose Buildings 15-M40 - *AB541* – 23 – Description Project No.
Construct New Northern Nevada State Veterans Home 15-C77 Electrical System Upgrades, Nevada Youth Training Center 15-M16 HVAC Renovation, Northern Nevada Adult Mental Health Services Building 2 15-M19 Ductwork Replacement, Lake’s Crossing 15-M20 Upgrade Basement Heating and Drainage Improvements, Nevada State Museum, Carson City 15-M38 Central Plant Improvements, Nevada Youth Training Center Education and Multi-Purpose Statewide Fire and Life Safety 15-M40 Program 15-S03 Sec.
Statewide Fire and Life Safety Program 15-S03 Sec.
Any remaining balance of the amount transferred in section 21 of chapter 549, Statutes of Nevada 2015, at page 3945, for project 15-P03, Advance Planning, Master Plan for Campus Buildings and Welcome Center in Building 2, Stewart Facility, must not be committed for expenditure after June 30, 2021, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Bond Interest and Redemption Fund on or before September 17, 2021.
Any remaining balance of the amount transferred in section 21 of chapter 549, Statutes of Nevada 2015, at page 3945, for project 15-P03, Advance Planning, Master Plan - 80th Session (2019) – 24 – for Campus Buildings and Welcome Center in Building 2, Stewart Facility, must not be committed for expenditure after June 30, 2021, and must be reverted to the Bond Interest and Redemption Account in the Consolidated Bond 2021.est and Redemption Fund on or before September 17, Sec.
Sec.
- *AB541* – 24 – Sec.
approval.2.
32.
This act becomes effective upon passage and ~~~~~ 19 - 80th Session (2019)
This act becomes effective upon passage and approval.
H - *AB541*
View plain text versions (2)

Action History

  1. Chapter 542.

  2. Approved by the Governor.

  3. Enrolled and delivered to Governor.

  4. Read third time. Passed. Title approved. (Yeas: 21, Nays: None.) To Assembly. In Assembly. To enrollment.

  5. From committee: Do pass. Placed on Second Reading File. Read second time.

  6. From printer. To committee. From committee: Do pass. Declared an emergency measure under the Constitution. Read third time. Passed. Title approved. (Yeas: 41, Nays: None, Vacant: 1.) To Senate. In Senate. Read first time. Referred to Committee on Finance. To committee.

  7. Read first time. Referred to Committee on Ways and Means. To printer.

Sponsors

  • Assembly Committee on Ways and Means · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 66 not signed on

Sponsors (1)

  • Assembly Committee on Ways and Means

Co-sponsors (0)

None.

Not signed on (66)

66 members have not signed on to this bill.

Show all 66 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does AB 541 do?
AN ACT relating to projects of capital improvement; authorizing certain expenditures by the State Public Works Division of the Department of Administration; levying a property tax to support the Consolidated Bond Interest and Redemption Fund; making appropriations; and providing other matters properly relating thereto.
Who sponsors AB 541?
AB 541 is sponsored by Assembly Committee on Ways and Means.
What is the current status of AB 541?
This bill has been enacted into law. Introduced May 30, 2019. Enacted.
Where can I track AB 541?
Track AB 541 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 541

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 541

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →