Nevada 2017 Regular Session Status: Passed Assembly

AB 298 — Revises provisions relating to water. (BDR 48-735)

Last action — (Pursuant to Joint Standing Rule No. 14.3.3, no further action allowed.)

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2017 Regular Session. It reached “Passed Assembly” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Bill Text

What changed in the latest version

858 added · 742 removed

858 line(s) added, 742 removed.

→
Previous
Latest
A.B.
(Reprinted with amendments adopted on April 20, 2017) FIRST REPRINT A.B.
defining “environmental soundness” and “environmentally sound”;
defining “environmentally sound” and “unappropriated water” for certain purposes;
defining “unappropriated water” for certain purposes;
Under existing law, the State Engineer is required to reject an application for a the source of supply or if the proposed use of the water or change conflicts with at existing rights or protectable interests in existing domestic wells or threatens to prove detrimental to the public interest.
Under existing law, the State Engineer is required to reject an application for a permit to appropriate water to beneficial use if there is no unappropriated water at the source of supply or if the proposed use of the water or change conflicts with existing rights or protectable interests in existing domestic wells or threatens to provides that when reviewing an application, the State Engineer may considerll whether a monitoring, management and mitigation plan will eliminate the conflicts with existing rights, protectable interests, the public interest or the environmental soundness of an interbasin transfer of groundwater.
(NRS 533.370) Section 3 of this bill provides that before rejecting an application because the proposed use conflicts with existing rights or protectable interests, the State Engineer may consider whether a monitoring, management and mitigation plan will eliminate the conflicts.
Section 3 also sets forth the requirements for such a plan.
requires the State Engineer to provide notice to certain persons about the proposed plan and determine whether there is substantial evidence that the plan will eliminate the conflicts.
Section 4 of this bill requires the State Engineer to forth certain requirements if, as part of a monitoring, management or mitigationl sets plan, a person is required to furnish mitigation water to a holder of existing rights - *AB298_R1* – 2 – or owner of an existing domestic well.
Section 5 of this bill sets forth certain requirements if, as part of a monitoring, management or mitigation plan, a person is required to furnish replacement water to a holder of existing rights or owner of a domestic well.
Section 6 of this bill authorizes the State Engineer to consider an amendment to a monitoring, management or mitigation plan.
- *AB298* – 2 – Section 6 of this bill authorizes the State Engineer to approve an amendment to a monitoring, management or mitigation plan.
Section 6 also authorizes the State Engineer, under certain circumstances, to require certain changes to the monitoring provisions of a monitoring, management and mitigation plan without complying with the requirements for a proposed address issues and conflicts related to certain applications for water and toate to encourage the use of monitoring, management and mitigation plans under certain circumstances.
(1) requires the State Engineer to reject an application for a available from the proposed source of supply without exceeding the perennial yieldr of that source;
(1) requires the State Engineer to reject an application for a permit to appropriate water if the State Engineer determines that there is no water available from the proposed source of supply without exceeding the perennial yield management area any basin which withdrawals of groundwater consistently exceed the perennial yield of the basin;
(2) authorizes the State Engineer to designate as a critical management area any basin which withdrawals of groundwater consistently exceed the perennial yield of the basin;
and (3) requires the State Engineer to designate as a critical management area any basin in which withdrawals of groundwater consistently exceed the perennial yield of the basin upon receipt of certain petitions (NRS 533.371, 534.110) Sections 2 and 19 of this bill define the term “perennial yield” for these purposes.
and (3) requires the State Engineer to designate as a critical management area any basin in which withdrawals of groundwater (NRS 533.371, 534.110) Sections 2 and 19 of this bill define the term “perennialitions yield” for these purposes.
of groundwater, existing law requires the State Engineer to consider whether the proposed interbasin transfer is environmentally sound.
When considering whether to approve an application for an interbasin transfer of groundwater, existing law requires the State Engineer to consider whether the proposed interbasin transfer is environmentally sound.
(NRS 533.370) Section 2.5 of this bill defines the term “environmentally sound” for this purpose.
(NRS 533.370) Section 10 defines the term “environmentally sound” for this purpose.
Existing law requires the State Engineer to reject an application for a permit if there is no unappropriated water in the proposed source of supply.
there is no unappropriated water in the proposed source of supply.
(NRS 533.370) Section 10 defines “unappropriated water” for this purpose.
(NRS 533.370)t if Section 10 defines “unappropriated water” for this purpose.
“Perennial yield” means the quantity of water that recharges annually in a groundwater source of supply when calculated over a period representative of the average long-term conditions of that source of supply.
“Perennial yield” means the maximum amount of groundwater in a groundwater source of supply that may be withdrawn each year over the long term without unreasonably or continuously decreasing that groundwater source of supply.
2.5.
“Environmental soundness” or “environmentally sound” means that the use of groundwater for an interbasin transfer of water will not cause:
1.
An unreasonable harmful impact on wildlife and noninvasive plant communities which depend on groundwater in the basin from which the water is transferred;
or 2.
The inability to support wildlife and noninvasive plant communities resulting from changed groundwater conditions in the basin from which the water is transferred.
Sec.
Before rejecting an application because the proposed use or change conflicts with existing rights or protectable interests in domestic wells as set forth in NRS 533.024, the State Engineer may consider whether a monitoring, management and mitigation plan will eliminate the conflict.
In reviewing an application to appropriate water or to change the point of diversion, manner of use or place of use pursuant to NRS 533.370 or holding a hearing on such an - *AB298_R1* – 3 – application, the State Engineer may require an applicant to submit a monitoring, management and mitigation plan to address any conflict with existing rights, protectable interests in domestic wells as set forth in NRS 533.024, the public interest or the environmental soundness of an interbasin transfer of groundwater.
The plan must be in the form prescribed by the State Engineer and be accompanied by evidence that demonstrates the feasibility and effectiveness of the plan in eliminating the conflict.
If the State Engineer determines during a hearing on an application that a monitoring, management and mitigation plan is required, he or she may postpone the hearing pending his or her review of the monitoring, management and mitigation plan.
A monitoring, management and mitigation plan must include, without limitation:
A monitoring, management and mitigation plan must be:
(a) A list of the holders of existing rights and owners of domestic wells with whom the application conflicts;
(a) Accompanied by substantial evidence that demonstrates the feasibility and effectiveness of the plan in eliminating the conflict or conflicts;
(b) An explanation of how all conflicts with existing rights and protectable interests in domestic wells will be eliminated through the measures set forth in the plan;
and (b) Reviewed and approved or denied by the State Engineer at the same time the State Engineer is reviewing the application.
- *AB298* – 3 – (c) A proposal for how the applicant will monitor the impact on holders of existing rights and owners of domestic wells if the State Engineer approves the application;
and (d) Triggers, thresholds, standards and procedures for implementing the plan.
A monitoring, management and mitigation plan may require an applicant to take one or more of the following actions to eliminate the conflict:
A monitoring, management and mitigation plan must include, without limitation:
(a) Furnishing replacement water of a sufficient quantity and quality.
(a) A list of the locations of existing rights and domestic wells, and any important environmental resources with which the application may conflict;
If a monitoring, management and mitigation plan requires the applicant to furnish replacement water, the applicant must demonstrate by substantial evidence that the applicant has the ability to furnish the replacement water of sufficient quality and quantity to eliminate the conflict.
(b) An explanation of how all conflicts with existing rights, protectable interests in existing domestic wells, the public interest and the environmental soundness of an interbasin transfer of groundwater, as applicable, will be eliminated through the measures set forth in the plan;
(b) Improving the works of diversion and distribution to the holder of a water right.
(c) A plan to monitor the impact on existing rights, existing domestic wells and important environmental resources if the State Engineer approves the application;
(c) Reducing or relocating the quantity of water diverted by the applicant or a holder of a water right with a later priority.
(d) Triggers and thresholds to avoid, manage and mitigate any conflicts;
(d) Financial assurances to ensure performance by the applicant.
(e) Measures to mitigate any potential or actual conflict to such a level that the conflict is eliminated;
(e) Financial compensation of holders of existing rights and owners of domestic wells.
and (f) Provisions to amend the plan if necessary to eliminate any conflicts.
(f) Any other measure or action that may be necessary to eliminate the conflict.
4.
A monitoring, management and mitigation plan may include, without limitation, one or more of the following actions to eliminate any conflicts:
(a) Furnishing mitigation water of a sufficient quantity, quality and reliability for the approved beneficial use of an existing right or existing domestic well.
Show all 144 changed rows (104 more)
Previous
Latest
If a monitoring, management and mitigation plan requires the applicant to furnish mitigation water, the applicant must demonstrate by substantial evidence that the applicant has the ability to furnish the mitigation water of sufficient quality, quantity and reliability to eliminate the conflict.
- *AB298_R1* – 4 – (b) Improving the works of diversion and distribution to the holder of an existing water right.
(c) Providing a new well to the holder of an existing right or the owner of an existing domestic well.
(d) Reducing or relocating the quantity of water diverted by the applicant or a holder of a water right with a later priority.
(e) Any other measure or action that may be necessary to eliminate the conflict.
5.
The State Engineer shall deny a monitoring, management and mitigation plan if he or she determines that the plan does not eliminate the conflicts.
The State Engineer must review a monitoring, management and mitigation plan and determine whether there is substantial evidence that implementation of the plan will eliminate the conflicts with existing rights and protectable interests in domestic wells.
2.
(1) The holders of existing rights and owners of domestic wells with whom the application conflicts;
(1) The applicant;
(2) All holders of existing rights whose point of diversion is located within 2,500 feet of the point of diversion of the applicant;
(2) The holders of existing rights and owners of existing domestic wells with whom the application may conflict;
(3) All persons who filed a protest against the granting of the application pursuant to NRS 533.365;
and (3) All persons who filed a protest against the granting of the application pursuant to NRS 533.365.
and (4) Any person who has requested that the State Engineer provide such notice.
(c) Allow for a period during which any person described in paragraph (b) may submit any comment, analysis or other information in response to the application and proposed monitoring, management and mitigation plan.
- *AB298* – 4 – (c) Allow for a period during which any person may submit any comment, analysis or other information in response to the proposed monitoring, management or mitigation plan.
(d) Comply with the provisions of NRS 533.353, if applicable.
(d) Comply with the provisions of NRS 533.353.
2.
The State Engineer may consider any comment on the application or the monitoring, management and mitigation plan submitted:
(a) By any person to whom the State Engineer provided notice pursuant to paragraph (b) of subsection 1;
or (b) Jointly by the applicant and any person to whom the State Engineer provided notice pursuant to paragraph (b) of subsection 1.
(a) Send notice of the approval by certified mail to each person to whom the State Engineer provided notice pursuant to paragraph (b) of subsection 2;
(a) Send notice of the approval by certified mail to each person to whom the State Engineer provided notice pursuant to paragraph (b) of subsection 1;
- *AB298_R1* – 5 – 4.
The applicant must pay the cost of the notices required pursuant to this section.
5.
Judicial review pursuant to NRS 533.450 of a monitoring, management and mitigation plan approved by the State Engineer must occur at the same time the approval or rejection of the application by the State Engineer is subject to judicial review.
If a monitoring, management or mitigation plan that is approved by the State Engineer requires the applicant to furnish replacement water to a holder of existing rights or owner of a domestic well:
If a monitoring, management or mitigation plan that is approved by the State Engineer requires the applicant to furnish mitigation water to a holder of existing rights or owner of an existing domestic well:
Before replacement water is furnished, the person who will be furnishing the replacement water must file a notice with the State Engineer setting forth:
Before mitigation water is furnished, the person who will be furnishing the mitigation water must file a notice with the State Engineer setting forth:
and (c) The place of use of the water that will be furnished.
(c) The place of use of the water that will be furnished;
and (d) The number associated with the permit, certificate or vested right of the existing right, the number associated with the well log or the locations of the existing domestic wells that will receive the water, as applicable.
The person furnishing replacement water is not required to submit an application pursuant to NRS 533.345 for a permit to change the point of diversion, manner of use or place of use of the replacement water.
The person furnishing mitigation water is not required to submit an application pursuant to NRS 533.345 for a permit to change the point of diversion, manner of use or place of use of the mitigation water provided that the State Engineer considered the furnishing of mitigation water as part of the original monitoring, management and mitigation plan.
The time periods for forfeiture and abandonment of a water right pursuant to NRS 533.060 and 534.090 and for filing proof of beneficial use under the terms of a permit to appropriate water are tolled for as long as replacement water must be furnished.
The time periods for cancellation, forfeiture and abandonment of a water right pursuant to NRS 533.060, 533.410 and 534.090 and for filing proof of beneficial use under the terms of a permit to appropriate water are tolled for as long as mitigation water must be furnished.
4.
The holder of an existing right or owner of an existing domestic well is not entitled to a specific source of water.
The State Engineer may approve an amendment to a monitoring, management and mitigation plan.
The State Engineer may consider an amendment to an approved monitoring, management and mitigation plan proposed by:
(a) The applicant who submitted the monitoring, management and mitigation plan;
(b) A holder of an existing right or the owner of an existing domestic well with whom the applicant may conflict;
or (c) Any person who filed a protest to an application pursuant to NRS 533.365.
A proposed amendment must be accompanied by substantial evidence that demonstrates the feasibility and - *AB298_R1* – 6 – effectiveness of the amendment in eliminating the conflict or conflicts.
3.
- *AB298* – 5 – (c) Allow for a period during which any person may submit any comment, analysis or other information in response to the proposed amendment to the monitoring, management and mitigation plan.
(c) Allow for a period during which any person to whom the State Engineer sent notice of the original monitoring, management and mitigation plan may submit any comment, analysis or other information in response to the proposed amendment to the monitoring, management and mitigation plan for the consideration of the State Engineer.
(d) Comply with the provisions of NRS 533.353.
(d) Comply with the provisions of NRS 533.353, if applicable.
3.
4.
(a) Send notice of the approval by certified mail to each person to whom the State Engineer provided notice pursuant to paragraph (b) of subsection 2;
(a) Send notice of the approval by certified mail to each person to whom the State Engineer provided notice pursuant to paragraph (b) of subsection 3;
5.
The applicant or person requesting the amendment must pay the cost of the notices required pursuant to this section.
6.
The State Engineer may require a person who has submitted a monitoring, management and mitigation plan to conduct additional monitoring or change the location of the monitoring.
Such a request by the State Engineer is not subject to the provisions of this section if the State Engineer determines that the existing rights, protectable interests in existing domestic wells and important environmental resources will continue to be protected under the modified monitoring provisions.
533.005 As used in this chapter, unless the context otherwise requires, the words and terms defined in NRS 533.007 to 533.023, inclusive, and section 2 of this act have the meanings ascribed to them in those sections.
533.005 As used in this chapter, unless the context otherwise requires, the words and terms defined in NRS 533.007 to 533.023, inclusive, and sections 2 and 2.5 of this act have the meanings ascribed to them in those sections.
7.5.
NRS 533.024 is hereby amended to read as follows:
533.024 The Legislature declares that:
1.
It is the policy of this State:
- *AB298_R1* – 7 – (a) To encourage and promote the use of effluent, where that use is not contrary to the public health, safety or welfare, and where that use does not interfere with federal obligations to deliver water of the Colorado River.
(b) To recognize the importance of domestic wells as appurtenances to private homes, to create a protectable interest in such wells and to protect their supply of water from unreasonable adverse effects which are caused by municipal, quasi-municipal or industrial uses and which cannot reasonably be mitigated.
(c) To encourage the State Engineer to consider the best available science in rendering decisions concerning the available surface and underground sources of water in Nevada.
(d) To encourage and promote the use of water to prevent or reduce the spread of wildfire or to rehabilitate areas burned by wildfire, including, without limitation, through the establishment of vegetative cover that is resistant to fire.
(e) To encourage any person applying for a permit to appropriate water or to change the point of diversion, place of use or manner of use of water to work with holders of existing rights and owners of existing wells to address issues or conflicts with the application before any hearing that may be held by the State Engineer on the application.
(f) To encourage the use of monitoring, management and mitigation plans to:
(1) Identify potential issues with future water development;
(2) Seek to avoid conflicts with existing rights, protectable interests in existing domestic wells and the public interest;
(3) Ensure any proposed interbasin transfer of groundwater is environmentally sound;
(4) Manage groundwater basins consistent with the doctrine of prior appropriation;
and (5) When necessary, mitigate the impact of an application for the purpose of eliminating any conflict with existing rights, protectable interests in domestic wells and important environmental resources.
2.
The procedures in this chapter for changing the place of diversion, manner of use or place of use of water, and for confirming a report of conveyance, are not intended to have the effect of quieting title to or changing ownership of a water right and that only a court of competent jurisdiction has the power to determine conflicting claims to ownership of a water right.
3.
The procedures in this chapter regarding the review or approval of a monitoring, management and mitigation plan are not intended to abrogate the authority of the State Engineer to - *AB298_R1* – 8 – protect existing rights and protectable interests in existing domestic wells.
Sec.
- *AB298* – 6 – 3.
3.
(1) Intention in good faith to construct any work necessary to apply the water to the intended beneficial use with reasonable diligence;
- *AB298_R1* – 9 – (1) Intention in good faith to construct any work necessary to apply the water to the intended beneficial use with reasonable diligence;
In addition to the criteria set forth in subsections 1 and 2, in determining whether an application for an interbasin transfer of groundwater must be rejected pursuant to this section, the State Engineer shall consider:
In addition to the criteria set forth in subsections 1 and 2 [,] and section 3 of this act, in determining whether an application for an interbasin transfer of groundwater must be rejected pursuant to this section, the State Engineer shall consider:
- *AB298* – 7 – (d) Whether the proposed action is an appropriate long-term use which will not unduly limit the future growth and development in the basin from which the water is exported;
(d) Whether the proposed action is an appropriate long-term use which will not unduly limit the future growth and development in the basin from which the water is exported;
(e) Where court actions or adjudications are pending, which may affect the outcome of the application.
- *AB298_R1* – 10 – (e) Where court actions or adjudications are pending, which may affect the outcome of the application.
If the State Engineer has not approved, rejected or held a hearing on an application within 7 years after the final date for filing a protest, the State Engineer shall cause notice of the application to be republished pursuant to NRS 533.360 immediately preceding - *AB298* – 8 – the time at which the State Engineer is ready to approve or reject the application.
If the State Engineer has not approved, rejected or held a hearing on an application within 7 years after the final date for filing a protest, the State Engineer shall cause notice of the application to be republished pursuant to NRS 533.360 immediately preceding the time at which the State Engineer is ready to approve or reject the application.
Except as otherwise provided in subsection 11, if the application is approved, the applicant may, on receipt thereof, proceed with the construction of the necessary works and take all steps required to apply the water to beneficial use and to perfect the proposed appropriation.
Except as otherwise provided in subsection 11, if the application is approved, the applicant may, on receipt thereof, proceed with the construction of the necessary works and take all steps required to apply the water to - *AB298_R1* – 11 – beneficial use and to perfect the proposed appropriation.
(b) “Environmentally sound” means that the use of groundwater for an interbasin transfer of water will not cause:
(b) “Unappropriated water” means the quantity of groundwater that is:
- *AB298* – 9 – (1) An unreasonable effect on natural resources which depend on groundwater in the basin from which the water is transferred;
(1) Available for appropriation based on the perennial yield of the source of supply which does not require the actual capture of the recharge or discharge from the source of supply;
or (2) The inability to sustain, over a 75-year planning period, current or successor plant and wildlife communities in the basin from which the water is transferred.
and (2) Not committed to existing permitted, certificated, federally reserved, decreed or vested water rights.
(c) “Unappropriated water” means the quantity of groundwater that is:
(1) Available for appropriation based on the perennial yield of the source of supply;
and (2) Not committed to existing water rights.
[The] Except as otherwise provided in NRS 533.353 and sections 3 to 6, inclusive, of this act, the proposed use conflicts with existing rights;
The proposed use conflicts with existing rights [;] and the conflict cannot be eliminated through the use of a monitoring, management and mitigation plan;
or 6.
or - *AB298_R1* – 12 – 6.
Except as otherwise provided in NRS 533.353, any person feeling aggrieved by any order or decision of the State Engineer, acting in person or through the assistants of the State - *AB298* – 10 – Engineer or the water commissioner, affecting the person’s interests, when the order or decision relates to the administration of determined rights or is made pursuant to NRS 533.270 to 533.445, inclusive, and sections 3 to 6, inclusive, of this act, or NRS 533.481, 534.193, 535.200 or 536.200, may have the same reviewed by a proceeding for that purpose, insofar as may be in the nature of an appeal, which must be initiated in the proper court of the county in which the matters affected or a portion thereof are situated, but on stream systems where a decree of court has been entered, the action must be initiated in the court that entered the decree.
Except as otherwise provided in NRS 533.353, any person feeling aggrieved by any order or decision of the State Engineer, acting in person or through the assistants of the State Engineer or the water commissioner, affecting the person’s interests, when the order or decision relates to the administration of determined rights or is made pursuant to NRS 533.270 to 533.445, inclusive, and sections 3 to 6, inclusive, of this act, or NRS 533.481, 534.193, 535.200 or 536.200, may have the same reviewed by a proceeding for that purpose, insofar as may be in the nature of an appeal, which must be initiated in the proper court of the county in which the matters affected or a portion thereof are situated, but on stream systems where a decree of court has been entered, the action must be initiated in the court that entered the decree.
No such proceedings may be entertained unless notice thereof, containing a statement of the substance of the order or decision complained of, and of the manner in which the same injuriously affects the petitioner’s interests, has been served upon the State Engineer, personally or by registered or certified mail, at the Office of the State Engineer at the State Capital within 30 days following the rendition of the order or decision in question.
No such proceedings may be entertained unless notice thereof, containing a statement of the substance of the order or decision complained of, and of the manner in which the same injuriously affects the petitioner’s interests, has been served upon the State Engineer, personally or by registered or certified mail, at the Office of the State Engineer at the State Capital within 30 days - *AB298_R1* – 13 – following the rendition of the order or decision in question.
In - *AB298* – 11 – determining whether to grant or deny the motion for a stay, the court shall consider:
In determining whether to grant or deny the motion for a stay, the court shall consider:
Appeals may be taken to the appellate court of competent jurisdiction pursuant to the rules fixed by the Supreme Court pursuant to Section 4 of Article 6 of the Nevada Constitution from the judgment of the district court in the same manner as in other civil cases.
Appeals may be taken to the appellate court of competent jurisdiction pursuant to the rules fixed by the Supreme Court pursuant to Section 4 of Article 6 of the Nevada Constitution from - *AB298_R1* – 14 – the judgment of the district court in the same manner as in other civil cases.
- *AB298* – 12 – Sec.
Sec.
Any person who files an application for a permit to appropriate water from above or beneath the surface of the ground for use outside this State, or to change the point of diversion under an existing water right which has a place of use outside of this State, or to change the place of use of water from a location in this State to a location outside this State under an existing right, must file an application with the State Engineer for a permit to do so pursuant to provisions of NRS 533.324 to 533.450, inclusive, and sections 3 to 6, inclusive, of this act, and chapter 534 of NRS.
Any person who files an application for a permit to appropriate water from above or beneath the surface of the ground for use outside this State, or to change the point of diversion under an existing water right which has a place of use outside of this - *AB298_R1* – 15 – State, or to change the place of use of water from a location in this State to a location outside this State under an existing right, must file an application with the State Engineer for a permit to do so pursuant to provisions of NRS 533.324 to 533.450, inclusive, and sections 3 to 6, inclusive, of this act, and chapter 534 of NRS.
- *AB298* – 13 – (d) Whether the water that is the subject of the application could feasibly be used to alleviate current or reasonably anticipated shortages of water in this State;
(d) Whether the water that is the subject of the application could feasibly be used to alleviate current or reasonably anticipated shortages of water in this State;
Upon submittal of an application under this section, the applicant and, if the applicant is a natural person, the personal representative of the person, are subject to the jurisdiction of the courts of this State and to service of process as provided in NRS 14.065.
Upon submittal of an application under this section, the applicant and, if the applicant is a natural person, the personal - *AB298_R1* – 16 – representative of the person, are subject to the jurisdiction of the courts of this State and to service of process as provided in NRS 14.065.
If the records of the State Engineer or any other documents specified by the State Engineer indicate at least 4 consecutive years, but less than 5 consecutive years, of nonuse of all or any part of a water right which is governed by this chapter, the - *AB298* – 14 – State Engineer shall notify the owner of the water right, as determined in the records of the Office of the State Engineer, by registered or certified mail that the owner has 1 year after the date of the notice in which to use the water right beneficially and to provide proof of such use to the State Engineer or apply for relief pursuant to subsection 2 to avoid forfeiting the water right.
If the records of the State Engineer or any other documents specified by the State Engineer indicate at least 4 consecutive years, but less than 5 consecutive years, of nonuse of all or any part of a water right which is governed by this chapter, the State Engineer shall notify the owner of the water right, as determined in the records of the Office of the State Engineer, by registered or certified mail that the owner has 1 year after the date of the notice in which to use the water right beneficially and to provide proof of such use to the State Engineer or apply for relief pursuant to subsection 2 to avoid forfeiting the water right.
(a) Whether the holder has shown good cause for the holder’s failure to use all or any part of the water beneficially for the purpose for which the holder’s right is acquired or claimed;
- *AB298_R1* – 17 – (a) Whether the holder has shown good cause for the holder’s failure to use all or any part of the water beneficially for the purpose for which the holder’s right is acquired or claimed;
¬ The State Engineer shall notify, by registered or certified mail, the owner of the water right, as determined in the records of the - *AB298* – 15 – Office of the State Engineer, of whether the State Engineer has granted or denied the holder’s request for an extension pursuant to this subsection.
¬ The State Engineer shall notify, by registered or certified mail, the owner of the water right, as determined in the records of the Office of the State Engineer, of whether the State Engineer has granted or denied the holder’s request for an extension pursuant to this subsection.
If, upon notice by registered or certified mail to the owner of record who had the prior right, the owner of record of the prior right fails to appeal the ruling in the manner provided for in NRS 533.450, and within the time provided for therein, the alleged abandonment declaration as set forth by the State Engineer becomes final.
If, upon notice by registered or certified mail to the owner of record who had the prior right, the owner of record of the prior right fails to appeal the ruling in the manner provided for in NRS 533.450, and - *AB298_R1* – 18 – within the time provided for therein, the alleged abandonment declaration as set forth by the State Engineer becomes final.
and - *AB298* – 16 – (b) Whose reasonably expected rate of diversion is one-half cubic foot per second or more, ¬ to report periodically to the State Engineer concerning the effect of that well on other previously existing wells that are located within 2,500 feet of the well.
and (b) Whose reasonably expected rate of diversion is one-half cubic foot per second or more, ¬ to report periodically to the State Engineer concerning the effect of that well on other previously existing wells that are located within 2,500 feet of the well.
This section does not prevent the granting of permits to applicants later in time on the ground that the diversions under the proposed later appropriations may cause the water level to be lowered at the point of diversion of a prior appropriator, so long as any protectable interests in existing domestic wells as set forth in NRS 533.024 and the rights of holders of existing appropriations can be satisfied under such express conditions [.] , the terms of the permit or a monitoring, management and mitigation plan.
This section does not prevent the granting of permits to applicants later in time on the ground that the diversions under the proposed later appropriations may cause the water level to be lowered at the point of diversion of a prior appropriator, so long as any protectable interests in existing domestic wells as set forth in NRS 533.024 and the rights of holders of existing appropriations can be satisfied under [such express conditions.] the terms of the permit or a monitoring, management and mitigation plan.
and (b) Whose reasonably expected rate of diversion is one-half cubic foot per second or more, ¬ the State Engineer shall include as a condition of the permit that pumping water pursuant to the permit may be limited or prohibited to prevent any unreasonable adverse effects on an existing domestic well located within 2,500 feet of the well, unless the holder of the permit and the owner of the domestic well have agreed to alternative measures that mitigate those adverse effects.
and (b) Whose reasonably expected rate of diversion is one-half cubic foot per second or more, - *AB298_R1* – 19 – ¬ the State Engineer shall include as a condition of the permit that pumping water pursuant to the permit may be limited or prohibited to prevent any unreasonable adverse effects on an existing domestic well located within 2,500 feet of the well, unless the holder of the permit and the owner of the domestic well have agreed to alternative measures that mitigate those adverse effects.
- *AB298* – 17 – (b) Shall designate as a critical management area any basin in which withdrawals of groundwater consistently exceed the perennial yield of the basin upon receipt of a petition for such a designation which is signed by a majority of the holders of certificates or permits to appropriate water in the basin that are on file in the Office of the State Engineer.
(b) Shall designate as a critical management area any basin in which withdrawals of groundwater consistently exceed the perennial yield of the basin upon receipt of a petition for such a designation which is signed by a majority of the holders of certificates or permits to appropriate water in the basin that are on file in the Office of the State Engineer.
It has examined the past and present practice of the State Engineer with respect to existing water rights and protectable interests in existing domestic wells and the approval of an application to appropriate water or to change the point of diversion, manner of use or place of use subject to the development and implementation of a monitoring, management and mitigation plan and finds that the State Engineer has applied the provisions of Nevada law relating to such actions in a manner consistent with the provisions of this act.
It has examined the past and present practice of the State Engineer with respect to the approval of an application to appropriate water or to change the point of diversion, manner of use - *AB298_R1* – 20 – or place of use subject to the development and implementation of a monitoring, management and mitigation plan and finds that the State Engineer has applied the provisions of Nevada law relating to such actions in a manner consistent with the provisions of this act.
The provisions of this act are intended to clarify rather than change the existing application of chapters 533 and 534 of NRS relating to existing water rights and protectable interests in existing domestic wells and the approval of an application to appropriate water or to change the point of diversion, manner of use or place of use subject to the development and implementation of a monitoring, management and mitigation plan, and to promote thereby stability and consistency in the administration of chapters 533 and 534 of NRS.
The provisions of this act are intended to clarify rather than change the existing application of chapters 533 and 534 of NRS relating to the approval of an application to appropriate water or to change the point of diversion, manner of use or place of use subject to the development and implementation of a monitoring, management and mitigation plan, and to promote thereby stability NRS.consistency in the administration of chapters 533 and 534 of Sec.
Sec.
This act becomes effective upon passage and approval and, to the extent that it applies to applications for a permit to appropriate water or to change the point of diversion, manner of use - *AB298* – 18 – or place of use submitted to the State Engineer on or before the effective date of this act or to existing water rights or protectable interests in an existing domestic well with a priority date on or before the effective date of this act, shall apply to such applications, water rights and protectable interests retroactively and prospectively.
This act becomes effective upon passage and approval and, to the extent that it applies to applications for a permit to appropriate water or to change the point of diversion, manner of use or place of use submitted to the State Engineer on or before the effective date of this act or to existing water rights or protectable interests in an existing domestic well with a priority date on or before the effective date of this act, shall apply to such applications, water rights and protectable interests retroactively and prospectively.
H - *AB298*
H - *AB298_R1*
View plain text versions (2)

Action History

  1. (Pursuant to Joint Standing Rule No. 14.3.3, no further action allowed.)

  2. Read first time. Referred to Committee on Natural Resources. To committee.

  3. In Senate.

  4. Read third time. Passed, as amended. Title approved, as amended. (Yeas: 26, Nays: 16.) To Senate.

  5. Taken from General File. Placed on General File for next legislative day.

  6. Taken from General File. Placed on General File for next legislative day.

  7. From printer. To engrossment. Engrossed. First reprint .

  8. Read second time. Amended. (Amend. No. 359.) To printer.

  9. Placed on Second Reading File.

  10. From committee: Amend, and do pass as amended.

  11. From printer. To committee.

  12. Read first time. Referred to Committee on Natural Resources, Agriculture, and Mining. To printer.

Sponsors

  • Natural Resources, Agriculture, and Mining · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 66 not signed on

Sponsors (1)

  • Natural Resources, Agriculture, and Mining

Co-sponsors (0)

None.

Not signed on (66)

66 members have not signed on to this bill.

Show all 66 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors AB 298?
AB 298 is sponsored by Natural Resources, Agriculture, and Mining.
What is the current status of AB 298?
This bill died with 2017 Regular Session. It reached “Passed Assembly” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track AB 298?
Track AB 298 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 298

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 298

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →