Illinois 95th Regular Session Status: Passed Senate 1 D cosponsors

SB 877 — REGULATION-TECH

Last action — Session Sine Die

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 95th Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Amends the Public Utilities Act. Makes a technical change in a Section concerning the definition of "telecommunications carrier".

Bill Text

What changed in the latest version

179 added · 56 removed

Plain-language change summary

The latest version of SB 877 has been amended to include a new section focused on renewable energy and energy efficiency standards, which underscores Illinois' commitment to developing renewable energy resources. This addition recognizes the environmental, health, and economic benefits of transitioning to cleaner energy sources. It establishes the concept of "renewable energy credits" as a way to incentivize the production of renewable energy, which is significant for promoting cleaner energy and potentially stabilizing electricity rates for consumers. This change matters because it signals a stronger legislative push towards sustainable energy practices in Illinois.

→
Previous
Latest
*LRB09505640MJR25730b* SB0877 95TH GENERAL ASSEMBLY State of Illinois and 2008 SB0877 Introduced 2/8/2007, by Sen.
SB0877 Engrossed LRB095 05640 MJR 25730 b AN ACT concerning regulation.
James F.
Clayborne, Jr.
- Emil Jones, Jr.
SYNOPSIS AS INTRODUCED:
ILCS 5/13-202 from Ch.
111 2/3, par.
13-202 Amends the Public Utilities Act.
Makes a technical change in a Section concerning the definition of "telecommunications carrier".
LRB095 05640 MJR 25730 b A BILL FOR SB0877 LRB095 05640 MJR 25730 b AN ACT concerning regulation.
The Public Utilities Act is amended by changing Section 13-202 as follows:
The Public Utilities Act is amended by adding Section 9-220.3 as follows:
(220 ILCS 5/13-202) (from Ch.
(220 ILCS 5/9-220.3 new) Sec.
111 2/3, par.
9-220.3.
13-202) (Section scheduled to be repealed on July 1, 2007) Sec.
Renewable energy portfolio standard and energy efficiency portfolio standard.
13-202.
(a) The General Assembly finds and declares that it is desirable to obtain the environmental quality, public health, employment, economic development, rate stabilization, and fuel diversity benefits of developing new renewable energy resources for use in Illinois.
"Telecommunications carrier" means and and includes every corporation, company, association, joint stock company or association, firm, partnership or individual, their lessees, trustees or receivers appointed by any court whatsoever that owns, controls, operates or manages, within this State, directly or indirectly, for public use, any plant, equipment or property used or to be used for or in connection with, or owns or controls any franchise, license, permit or right to engage in the provision of, telecommunications services between points within the State which are specified by the user.
The General Assembly has previously found and declared that the benefits of electricity from renewable energy resources accrue to the public at large, thus consumers and electric utilities and alternative retail electric suppliers share an interest in developing and using a significant level of these environmentally preferable resources in the State’s electricity supply portfolio.
Telecommunications carrier does not include, however:
The General Assembly has previously found and declared that renewable forms of energy should be promoted as an important element of the energy and environmental policies of the State.
(a) telecommunications carriers that are owned and operated by any political subdivision, public or private institution of higher education or municipal corporation of this State, for their own use, or telecommunications carriers SB0877 - 2 - LRB095 05640 MJR 25730 b that are owned by such political subdivision, public or private institution of higher education, or municipal corporation and operated by any of its lessees or operating agents, for their own use;
(b) For purposes of this Section:
(b) telecommunications carriers which are purely mutual concerns, having no rates or charges for services, but paying the operating expenses by assessment upon the members of such a company and no other person but does include telephone or telecommunications cooperatives as defined in Section 13-212;
SB0877 Engrossed - 2 - LRB095 05640 MJR 25730 b "Renewable energy credit" means a tradable credit that represents the environmental attributes of a certain amount of energy produced from a renewable energy resource.
(c) a company or person which provides telecommunications services solely to itself and its affiliates or members or between points in the same building, or between closely located buildings, affiliated through substantial common ownership, control or development;
"Renewable energy resources" includes energy or renewable energy credits from wind, solar thermal energy, photovoltaic cells and panels, dedicated crops grown for energy production and organic waste biomass, hydropower that does not involve new construction or significant expansion of hydropower dams, and other such alternative sources of environmentally preferable energy.
or (d) a company or person engaged in the delivery of community antenna television services as described in subdivision (c) of Section 13-203, except with respect to the provision of telecommunications services by that company or person.
For purposes of this Section, "renewable energy resources" includes landfill gas from landfills located in the State.
(Source:
"Renewable energy resources" does not include, however, energy from the incineration, burning or heating of waste wood, tires, garbage, general household, institutional and commercial waste, industrial lunchroom or office waste, landscape waste, or construction or demolition debris.
P.A.
(c) The following renewable energy portfolio standards shall apply:
87-856.)
(1) An electric utility shall procure or obtain renewable energy resources in amounts that equal or exceed the following percentages of the total electricity that such electric utility supplies to its retail Illinois customers:
2% by December 31, 2008;
4% by December 31, 2009;
5% by December 31, 2010;
6% by December 31, 2011;
7% by December 31, 2012;
8% by December 31, 2013;
9% by December 31, 2014;
and 10% by December 31, 2015.
It shall SB0877 Engrossed - 3 - LRB095 05640 MJR 25730 b be the goal of the State that cost-effective renewable energy resources be available to supply an amount of the total electricity that electric utilities supply to their retail customers that will continue to increase after 2015 by 1.5% per year to 25% by 2025.
Provided, however, that if the Commission’s promulgation of rules pursuant to item (7) is delayed beyond March 31, 2008, but occurs prior to April 1, 2009, the initial target year and each subsequent target year shall be delayed by one year;
the targets shall be delayed by an additional year for each additional year or fraction thereof that the Commission’s promulgation of rules is delayed.
In the event that the Commission’s promulgation of rules is delayed after March 31, 2008, but occurs before July 1, 2008, the utility shall nonetheless meet one-quarter of the target for 2008 of electricity supplied to retail Illinois customers by December 31, 2008.
To the extent that it is available, at least 75% of the renewable energy resources used to meet these standards shall come from wind generation.
For purposes of this subsection (c), "cost-effective" shall mean that the costs of procuring renewable energy resources do not cause the limit stated in item (3) to be exceeded.
(2) For the purposes of this subsection (c), the required procurement of renewable energy resources for a particular year shall be measured as a percentage of the actual amount of electricity (megawatt-hours) supplied by SB0877 Engrossed - 4 - LRB095 05640 MJR 25730 b the electric utility in the calendar year ending immediately prior to the procurement.
(3) Notwithstanding the requirements of item (1) of this subsection (c), an electric utility may reduce the amount of renewable energy resources procured under new contracts in any single year by an amount necessary to limit the estimated average increase due to the cost of these resources included in the amounts paid by retail customers in connection with electric service to no more than 0.5% of the amount paid by such customers during the preceding calendar year, with such limit increasing by 0.5% in each of the 3 years 2009 through 2011, for a maximum cap on the allowed estimated average increase due to the cost of these resources of 2.0%.
Show all 57 changed rows (17 more)
Previous
Latest
The maximum cap on the allowed estimated average increase due to the cost of these resources is 2%.
No later than June 30, 2011, the Commission shall review the rate limitation and report to the General Assembly its findings as to whether the rate cap unduly constrains the procurement of renewable energy resources that are cost effective.
(4) Renewable energy resources shall be counted for the purpose of meeting the renewable energy standards set forth in item (1) of this subsection (c) only if they are generated from facilities located in the State, provided that cost-effective renewable resources are available from such facilities.
After December 31, 2011, renewable energy SB0877 Engrossed - 5 - LRB095 05640 MJR 25730 b resources located in states that adjoin Illinois may be counted towards compliance with the standards set forth in item (1) of this subsection (c) so long as such resources are generated from resources that meet the definition of renewable energy resources as defined by this statute.
Any electric utility with fewer than 100,000 but more than 50,000 customers in Illinois as of January 1, 2007 shall be allowed to count renewable energy resources generated in a state adjoining Illinois for the purpose of meeting the renewable energy standard set forth in item (1) of this subsection (c) if such resources are generated from a facility constructed in the year 2006.
(5) Each electric utility shall report to the Commission on compliance with these standards by April 1 of each year, beginning in 2009.
(6) If an electric utility does not, during a calendar year, procure or obtain the full amount of renewable energy resources specified by the standards in item (1) of this subsection (c), as modified by the limitations of item (3) of this subsection (c), then the electric utility shall pay a penalty of $40 per megawatt-hour for any shortfall during such year unless and until the utility makes sufficient additional purchases in the following year to offset the shortfall.
Provided, however, that, if the electric utility proves to the Commission that cost-effective renewable energy resources are not available in sufficient SB0877 Engrossed - 6 - LRB095 05640 MJR 25730 b quantities to meet the renewable energy standards set forth in item (1) of this subsection (c), as modified by the limitations of item (3) of this subsection (c), and, if the Commission finds that the electric utility has, in fact, proved that the cost-effective renewable energy resources are not available in sufficient quantities, after notice and a hearing conducted in accordance with the Commission’s rules of practice, then the Commission shall waive the penalty.
Any penalty payment shall be deposited into the Renewable Energy Resources Trust Fund to be used by the Department of Commerce and Economic Opportunity for the sole purposes of supporting the actual development, construction, and utilization of renewable energy projects in the State.
(7) The Commission shall promulgate rules as necessary within 9 months after the effective date of this Act to assist in implementing this subsection (c) including, but not limited to, methods of procurement, accounting, tracking, and reporting in order to achieve the full objectives of this subsection (c).
The rules shall also provide for recovery of costs incurred and the pass-through to customers of any savings achieved by electric utilities as a result of procuring or obtaining the renewable energy resources specified under item (1) of this subsection (c).
The rate elements and rates used for such cost recovery may be established by the electric utility, subject to the SB0877 Engrossed - 7 - LRB095 05640 MJR 25730 b Commission’s review and approval, outside the context of a general rate case.
(8) In connection with their compliance with the requirements of item (1) of this subsection (c), electric utilities may enter into long-term contracts of up to 20 years in length with providers of renewable energy resources, and the costs or savings associated with those contracts shall be reflected in tariffed rates for the duration of those contracts.
(9) Nothing shall prohibit an electric utility from issuing a competitive solicitation for renewable energy resources in order to meet the standards of item (1) of this subsection (c) and from beginning to recover the associated costs in advance of the conclusion of the rulemaking referenced in item (7) of this subsection (c), provided that such electric utility shall have first requested and received Commission approval for the design and conduct of such solicitation and the associated cost recovery methodology and tariff, which the Commission shall review and consider.
Section 99.
Effective date.
This Act takes effect upon becoming law.
View plain text versions (2)

Action History

  1. Session Sine Die

  2. Rule 19(a) / Re-referred to Rules Committee

  3. Final Action Deadline Extended-9(b) May 31, 2007

  4. Assigned to Executive Committee

  5. Added Alternate Chief Co-Sponsor Rep. Donald L. Moffitt

  6. Referred to Rules Committee

  7. First Reading

  8. Chief House Sponsor Rep. Elaine Nekritz

  9. Placed on Calendar Order of First Reading

  10. Arrived in House

  11. Third Reading - Passed; 053-001-000

  12. Placed on Calendar Order of 3rd Reading

  13. Senate Floor Amendment No. 1 Adopted; Harmon

  14. Recalled to Second Reading

  15. Added as Co-Sponsor Sen. Martin A. Sandoval

  16. Added as Chief Co-Sponsor Sen. Kwame Raoul

  17. Chief Sponsor Changed to Sen. Don Harmon

  18. Senate Floor Amendment No. 1 Recommend Do Adopt Environment and Energy; 010-001-000

  19. Senate Floor Amendment No. 1 Rules Refers to Environment and Energy

  20. Senate Floor Amendment No. 1 Referred to Rules

  21. Senate Floor Amendment No. 1 Filed with Secretary by Sen. Don Harmon

  22. Rule 2-10 Third Reading Deadline Established As May 31, 2007

  23. Placed on Calendar Order of 3rd Reading March 27, 2007

  24. Second Reading

  25. Placed on Calendar Order of 2nd Reading March 20, 2007

  26. Do Pass Executive; 007-005-000

  27. Assigned to Executive

  28. Referred to Rules

  29. First Reading

  30. Chief Co-Sponsor Sen. Emil Jones, Jr.

  31. Filed with Secretary by Sen. James F. Clayborne, Jr.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 1 co-sponsors · 182 not signed on

Sponsors (0)

None.

Co-sponsors (1)

Not signed on (182)

182 members have not signed on to this bill.

Show all 182 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Third Reading

Passed 53 Yea · 1 Nay · 5 Other
Party YeaNayPresentNot Voting
Unaffiliated 44104
Democrat 8001
Republican 1000
Total 53105
% of votes cast 90%2%0%8%
How each member voted (59)
Member Party Vote
Haine — Yea
Halvorson — Yea
Link — Yea
Luechtefeld — Yea
Millner — Yea
Noland — Yea
Pankau — Yea
Peterson — Yea
Schoenberg — Yea
Sieben — Yea
Viverito — Yea
Sullivan — Yea
Munoz — Yea
Cullerton — Yea
Jacobs — Yea
Watson — Yea
Clayborne — Yea
Crotty — Yea
Dahl — Yea
Forby — Yea
Garrett — Yea
Hendon — Yea
Hultgren — Yea
Jones, J. — Yea
Lauzen — Yea
Demuzio — Yea
Brady — Not Voting
Trotter — Not Voting
Wilhelmi — Yea
Cronin — Not Voting
DeLeo — Yea
Dillard — Yea
Kotowski — Yea
Radogno — Yea
Raoul — Yea
Righter — Yea
Risinger — Yea
Ronen — Yea
Rutherford — Nay
Sandoval — Yea
Silverstein — Yea
Maloney — Yea
Althoff — Yea
Martinez — Yea
Bomke — Yea
Bond — Yea
Burzynski — Yea
Meeks — Not Voting
Frerichs — Yea
David Koehler Democrat Yea
Don Harmon Democrat Yea
Emil Jones, III Democrat Yea
Eva-Dina Delgado Democrat Not Voting
Kimberly A. Lightford Democrat Yea
Lakesia Collins Democrat Yea
Laura M. Murphy Democrat Yea
Linda Holmes Democrat Yea
Mattie Hunter Democrat Yea
Dave Syverson Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 877 do?
Amends the Public Utilities Act. Makes a technical change in a Section concerning the definition of "telecommunications carrier".
Who sponsors SB 877?
SB 877 is sponsored by Don Harmon (Democrat).
What is the current status of SB 877?
This bill died with 95th Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 877?
Track SB 877 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 877

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 877

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →