Washington 2025-2026 Regular Session Status: Enacted Bipartisan · 5 D · 2 R cosponsors

SB 5627 — Improving safe excavation practices and preventing damage to underground utilities.

Last action — Effective date 7/27/2025.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. ✓
    Passed House
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced January 31, 2025. Enacted.

Signed by Governor Bob Ferguson (Democratic) on May 16, 2025.

Odds of enactment

High chance

Based on the sponsor, cosponsors, and committee posture, this bill has a high chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Likely to advance 98% · high confidence
  • Enacted

    Current position in the legislative process.

  • 7 sponsors

    1 primary, 6 co-sponsors signed on.

  • Bipartisan support

    Sponsored across 2 parties (5 D · 2 R) — cross-party backing.

  • Cleared a recorded vote

    Passed 3 recorded votes so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Bill Text

What changed in the latest version

516 added · 484 removed

Plain-language change summary

The updated version of Bill SB 5627 adds clarifications to its provisions regarding underground utility safety. Notably, it emphasizes the importance of improving worker and public knowledge of safe practices without specifically referencing "worker safety." This change may help broaden the focus on safety training and awareness for everyone involved, not just workers. Such adjustments are significant as they aim to enhance overall public safety and reduce the risk of accidents during excavation activities.

→
Previous
Latest
ENGROSSED SUBSTITUTE SENATE BILL 5627 State of Washington 69th Legislature 2025 Regular Session By Senate Environment, Energy & Technology (originally sponsored by Senators Ramos, Harris, Wellman, Shewmake, J.
S-0499.1 SENATE BILL 5627 State of Washington 69th Legislature 2025 Regular Session By Senators Ramos, Harris, Wellman, Shewmake, J.
Wilson, Hasegawa, and Nobles) READ FIRST TIME 02/21/25.
Wilson, Hasegawa, and Nobles Read first time 01/31/25.
Referred to Committee on Environment, Energy & Technology.
amending RCW 19.122.010, 19.122.020, 19.122.027, 19.122.030, 19.122.031, 19.122.040, 19.122.050, 19.122.055, 19.122.090, 19.122.100, 19.122.130, and 19.122.150;
amending RCW 19.122.010, 19.122.020, 19.122.027, 19.122.030, 19.122.031, 19.122.040, 19.122.050, 19.122.055, 19.122.070, 19.122.090, 19.122.100, 19.122.130, and 19.122.150;
adding a new section to chapter 19.122 RCW;
(3) Improving worker safety and public knowledge of safe practices;
(3) Improving worker and public knowledge of safe practices;
1 ESSB 5627 (6) Enforcing this chapter.
1 SB 5627 (6) Enforcing this chapter.
(5) "Emergency" means any condition constituting a clear and present danger to life, health, or property, or a customer service outage due to an unplanned utility outage that requires immediate action where an excavator or facility operator has a crew on-site or en route.
(5) "Emergency" means any condition constituting a clear and present danger to life, health, or property, or a customer service outage due to an unplanned utility outage that requires immediate action where an excavator or facility operator has a crew onsite or enroute.
An "end user" does not include a person or entity that owns, operates, or maintains underground facilities in a public right-of-way.
(10) "Excavator" means any person who engages directly in excavation.
2 ESSB 5627 (11) "Facility operator" means any person who owns an underground facility or is in the business of supplying any utility service or commodity for compensation.
2 SB 5627 (10) "Excavator" means any person who engages directly in excavation.
(11) "Facility operator" means any person who owns an underground facility or is in the business of supplying any utility service or commodity for compensation.
Markings shall include identification letters indicating the specific type, best known width, and identification of the operator of the underground facility.
Markings shall include identification letters indicating the specific type , width, and identification of the operator of the underground facility.
3 ESSB 5627 (20) "Person" means an individual, partnership, franchise holder, association, corporation, the state, a city, a county, a town, or any subdivision or instrumentality of the state, including any unit of local government, and its employees, agents, or legal representatives.
3 SB 5627 (20) "Person" means an individual, partnership, franchise holder, association, corporation, the state, a city, a county, a town, or any subdivision or instrumentality of the state, including any unit of local government, and its employees, agents, or legal representatives.
4 ESSB 5627 hazardous liquid or gas from an interstate pipeline or storage facility to a distribution main or a large volume hazardous liquid or gas user, or operates at a hoop stress of twenty percent or more of the specified minimum yield strength.
4 SB 5627 hazardous liquid or gas from an interstate pipeline or storage facility to a distribution main or a large volume hazardous liquid or gas user, or operates at a hoop stress of twenty percent or more of the specified minimum yield strength.
(30) "Blind boring" means engaging in directional underground boring without potholing the underground facility, relying on surface markings only to approximate the location of underground utilities in three dimensions.
(30) "Design locating" means locating for planning purposes.
(31) "Design locating" means locating for planning purposes.
(32) "Force majeure" means:
(31) "Force majeure" means:
(33) "General contractor" has the same meaning as defined in RCW 18.27.010.
(32) "General contractor" has the same meaning as defined in RCW 18.27.010.
p.
(33) "Hard surface" means an area covered with asphalt, concrete, interlocking brick or block solid stone, wood, or any similar impervious or nonporous material on the surface of the ground.
5 ESSB 5627 (34) "Hard surface" means an area covered with asphalt, concrete, interlocking brick or block solid stone, wood, or any similar impervious or nonporous material on the surface of the ground.
(34) "Positive response" means a notification from the owner or operator of the underground facility, or the owner's or operator's authorized locating contractor, to the one-number locator service p.
(35) "Physical exposure" means processes, such as potholing or daylighting.
5 SB 5627 confirming that the facility owner, operator, or contracted locator has completed marking or provided location information regarding unlocatable facilities in response to a notice.
(36) "Positive response" means a notification from the owner or operator of the underground facility, or the owner's or operator's authorized locating contractor, to the one-number locator service confirming that the facility owner, operator, or contracted locator has completed marking or provided location information regarding unlocatable facilities in response to a notice.
(35) "Safe and careful work methods" means methods of excavation, including pot holing, hand digging when practical, vacuum excavation methods, pneumatic hand tools, or other technical methods that may be developed.
(37) "Potholing" means an excavation process that involves making a series of small test holes to accurately locate underground lines.
(36) "White lining" means the use of any white paint, flags, stakes, whiskers, or other locally accepted method that is distinguishable from the surrounding area.
Potholing is also known as daylighting.
"White lining" also includes the use of geometric polygons when a request is received using an electronic mapping software.
(38) "Safe and careful work methods" means methods of excavation, including pot holing, hand digging when practical, vacuum excavation methods, pneumatic hand tools, or other technical methods that may be developed.
(37) "Work-to-begin date" means an identified date not less than two full business days and not more than 10 full business days, not including Saturdays, Sundays, legal local, state, or federal holidays, from the date notice is given to a one-number locator service.
(39) "White lining" means the use of any white paint, flags, stakes, whiskers, or other locally accepted method that is distinguishable from the surrounding area.
(40) "Work-to-begin date" means an identified date not less than two full business days and not more than 10 full business days, not including Saturdays, Sundays, legal local, state, or federal holidays, from the date notice is given to a one-number locator service.
(a) The web-based platform, to be sufficient for electronic notice, must employ a digital mapping software that utilizes sufficiently accurate geographic data that permits the excavator to accurately place on an electronic map, markers designating the intended area(s) of excavation.
(b) The one-number locator service may permit multiple excavators on a single notice, so long as each excavator is provided with an individual and unique confirmation code.
(c) The one-number locator service must require that an excavator provide a work-to-begin date in the notice.
6 ESSB 5627 (a) The one-number locator service may permit multiple excavators on a single notice, so long as each excavator is provided with an individual and unique confirmation code.
6 SB 5627 (2) The commission, in consultation with the ((Washington utilities coordinating council)) the entity administering the one- number locator service, must establish minimum standards and best management practices for one-number locator services.
(b) The one-number locator service must require that an excavator provide a work-to-begin date in the notice.
(2) The commission, in consultation with the ((Washington utilities coordinating council)) entity administering the one-number locator service, must establish minimum standards and best management practices for one-number locator services.
NEW SECTION.
A new section is added to chapter 19.122 RCW to read as follows:
(1) Hazardous liquid and gas pipeline operators shall locate all underground facilities as required under Title 49 C.F.R.
Secs.
195.442(c)(5) and 192.614(c)(5) as they existed on the effective date of this section, or such subsequent date as may be provided by the commission by rule, consistent with the purpose of this section.
(2) Except as provided in subsection (1) of this section, if an operator does not visibly mark the location of unlocatable underground utilities or facilities, or marks a triangle, the operator shall provide information on the unlocatable facilities approximate location, if known, and size, type of facility, and any other known information that enables the excavator to use safe and careful work methods to determine the approximate location of the facility.
Show all 128 changed rows (88 more)
Previous
Latest
The facility operator shall provide the excavator with contact information for a facility representative who is not a contract locator who can answer questions regarding the unlocatable facility during the course of excavation.
(3) After January 1, 2027, facility operators shall make all underground facilities installed after the effective date of this section locatable underground facilities.
(4) Facility operators shall add location information for unlocatable underground facilities, to a facility operator-maintained mapping database within 30 calendar days of the date the facility operator acquires location information for each previously unlocatable underground facility.
(5) After December 31, 2025, facility operators shall maintain maps, drawings, diagrams, or other records illustrating the location of all underground facilities that the facility operator abandons or p.
7 SB 5627 designates as out-of-service.
If within the white-lined area in a notice, the facility operator shall indicate the presence of these facilities by marking the location of the abandoned or out-of-service facilities with an "A" in a circle and include the size and type of facility.
Sec.
5.
(b) If boundary marking required by (a) of this subsection is infeasible, an excavator must ((communicate directly with affected facility operators to ensure that the boundary of the excavation area is accurately identified)) provide notice electronically to a one- number locator service.
Physical marking of the boundary of excavation is not required when the excavator provides notice to a one-number locator service through a web-based platform, in accordance with subsection (2) of this section.
(c) Excavators and facility operators are encouraged to incorporate best practices for underground damage prevention, improve worker safety, protect vital underground infrastructure, and ensure public safety during excavation activities conducted in the vicinity of existing underground facilities.
Where notice is submitted using the web-based platform, any physical markings on the site take priority to the markings submitted using the online mapping software.
(2)(a) An excavator must provide the notice required by subsection (1) of this section to a one-number locator service not less than two full business days and not more than ((ten)) 10 full business days before the scheduled work-to-begin date ((for p.
Where reasonable, excavators and facility operators shall adopt the 20th version of the common ground alliance's best practices for locating, marking, and excavating methods published in 2024, or such subsequent versions as may be adopted by the commission by rule, consistent with the purposes of this section.
7 ESSB 5627 commencement of excavation)), unless otherwise agreed by the excavator and facility operators in writing.
(b) If boundary marking required by (a) of this subsection is infeasible, an excavator must ((communicate directly with affected facility operators to ensure that the boundary of the excavation area is accurately identified)) provide notice electronically to a one- number locator service using geographic mapping features as described in (a) of this subsection.
If an excavator intends to work at multiple sites or at a large project, the excavator must take reasonable steps to confer with facility operators to enable them to locate underground facilities reasonably in advance of the start of excavation for each phase of the work.
(2)(a) An excavator must provide the notice required by subsection (1) of this section to a one-number locator service not less than two full business days and not more than ((ten)) 10 full business days before the scheduled work-to-begin date ((for commencement of excavation)), unless otherwise agreed by the excavator and facility operators in writing.
If an excavator intends to work at multiple sites or at a large project, the excavator must take reasonable steps to confer with facility operators to enable p.
8 SB 5627 them to locate underground facilities reasonably in advance of the start of excavation for each phase of the work.
If notice is provided through the web-based platform, such notice must contain electronic mapping of the boundary of excavation as defined in RCW 19.122.027(1)(a).
Submission of notice electronically without sufficient geographic mapping is not notice under this chapter.
The general contractor must provide each excavator with an individual and unique confirmation code.
The excavator engaging in excavation is liable for all costs and penalties resulting from damage caused by excavation.
The excavator engaging in excavation is liable for all costs and penalties resulting from damage caused by excavation, including failure to follow the notice.
The excavator engaging in excavation is liable for all costs and penalties that result from damage from excavation that occurred because of failure to follow the notice.
195.442(c)(4) through (6) and 192.614(c)(4) through (6) as they existed on the effective date of this section, or such subsequent date as may be provided by the commission by rule, consistent with the purpose of this section.
195.442(c)(5) and 192.614(c)(5) as they existed on the effective date of this section, or such subsequent date as may be provided by the commission by rule, consistent with the purpose of this section.
8 ESSB 5627 available information as to their location prior to the work-to-begin date provided in the notice under subsection (1) of this section.
9 SB 5627 available information as to their location prior to the work-to-begin date provided in the notice under subsection (1) of this section.
195.442(c)(4) through (6) and 192.614(c)(4) through (6) as they existed on the effective date of this section, or such subsequent date as may be provided by the commission by rule, consistent with the purpose of this section;
195.442(c)(5) and 192.614(c)(5) as they existed on the effective date of this section, or such subsequent date as may be provided by the commission by rule, consistent with the purpose of this section;
9 ESSB 5627 arranging for repairs or relocation as provided in RCW 19.122.050(2);
10 SB 5627 arranging for repairs or relocation as provided in RCW 19.122.050(2);
Nothing in this section may be interpreted to require an end user to subscribe to a one-number locator service or to locate a service lateral within a right-of-way or utility easement, except an end user who is an owner, operator, or responsible party of an underground facility in a public right-of-way shall subscribe to a one-number locator service and comply with subsection (3) of this section.
Nothing in this section may be interpreted to require an end user to subscribe to a one-number locator service or to locate a service lateral within a right-of-way or utility easement, except an end user who is an owner, operator, or responsible party of a service lateral or other underground facility in a public right-of-way shall subscribe to a one-number locator service and comply with subsection (3) of this section.
The facility operator retains all legal responsibility for compliance with this section.
The facility operator retains all legal responsibility for compliance with this chapter.
10 ESSB 5627 (c) A facility operator's markings of underground utilities expire forty-five calendar days from the date that the excavator provided notice to a one-number locator service pursuant to subsection (1) of this section.
11 SB 5627 (c) A facility operator's markings of underground utilities expire forty-five calendar days from the date that the excavator provided notice to a one-number locator service pursuant to subsection (1) of this section.
(10) If an excavator discovers underground facilities that are not identified, the excavator must cease excavating in the vicinity of the underground facilities and immediately notify the facility operator ((or)) through a one-number locator service.
(10) If an excavator discovers underground facilities that are not identified, the excavator must cease excavating in the vicinity of the underground facilities and immediately notify the facility operator ((or)) directly or through a one-number locator service.
If an excavator discovers identified but unlocatable underground facilities, the excavator must notify the facility operator through a one-number locator service.
If an excavator discovers identified but unlocatable underground facilities, the excavator must notify the facility operator directly or through a one-number locator service.
Upon notification by a one-number locator service or an excavator, a facility operator must allow for location of the uncovered portion of an underground facility identified by the excavator, and may accept location information from the excavator for marking of the underground facility.
Upon notification by a one- number locator service or an excavator, a facility operator must allow for location of the uncovered portion of an underground facility identified by the excavator, and may accept location information from the excavator for marking of the underground facility.
However, the fees under this subsection may not be imposed on the department of transportation.
11 ESSB 5627 (12) Design locating is required whenever any individual applies for a development permit of any type within 700 feet of a transmission pipeline.
12 SB 5627 (12) Except as provided in subsections (6)(b), (8), and (11) of this section, facility operators are prohibited from charging a fee for locating and marking their underground facilities.
(a) Prior to any activity that involves grade modification, excavation, or additional loading of the soil on property within 700 feet of a transmission pipeline, the requestor must contact the transmission pipeline operator and provide documentation detailing the proposed activity.
(b) The transmission pipeline operator must respond to the requestor within 30 days to confirm a review of the documents describing the proposed activity and indicate any potential impacts from the activity on the transmission line.
(c) If after 30 days, the transmission pipeline operator does not respond to the requestor, then development activity may resume without violation.
(13) Except as provided in subsections (6)(b), (8), and (11) of this section, facility operators are prohibited from charging a fee for locating and marking their underground facilities.
(14) Nothing in this section limits a facility operator regulated by the commission from seeking recovery of costs for locating and marking its underground facilities as part of rates.
5.
6.
p.
(d) The replacement of an official traffic sign installed prior to January 1, 2013, no deeper than the depth at which it was installed;
12 ESSB 5627 (d) The replacement of an official traffic sign installed prior to January 1, 2013, no deeper than the depth at which it was installed;
((or)) (g) Construction, operation, or maintenance activities by an irrigation district on rights-of-way, easements, or facilities owned by the federal bureau of reclamation in federal reclamation projects ;
or (g) Construction, operation, or maintenance activities by an irrigation district on rights-of-way, easements, or facilities owned by the federal bureau of reclamation in federal reclamation projects.
or (h) Any facility operator using safe and careful work methods to physically expose an unlocatable facility in response to a one-call notification.
Sec.
p.
6.
13 SB 5627 Sec.
7.
(a) Determine the precise location of underground facilities which have been marked pursuant to RCW 19.122.030;
(a) Determine the precise location of underground facilities which have been marked pursuant to RCW 19.122.030(1);
p.
(b) Plan the excavation to avoid damage to or minimize interference with underground facilities in and near the excavation area;
13 ESSB 5627 (b) Plan the excavation to avoid damage to or minimize interference with underground facilities in and near the excavation area;
(d) Use safe and careful work methods, taking into consideration the known and unknown underground facilities and the surface and subsurface to be excavated.
and (d) Use safe and careful work methods, taking into consideration the known and unknown underground facilities and the surface and subsurface to be excavated.
If the marking is on a hard surface, methods of excavation may include pneumatic hand tools or other excavation methods that are commonly accepted as permissible for the type of surface encountered;
If the marking is on a hard surface, methods of excavation may include pneumatic hand tools or other excavation methods that are commonly accepted as permissible for the type of surface encountered.
and (e) When directional boring will be implemented as a method of underground excavation, supplement white lining with physical exposure to avoid blind boring.
Sec.
p.
7.
14 SB 5627 Sec.
8.
p.
(2) A facility operator notified in accordance with subsection (1) of this section shall arrange for repairs or relocation as soon as is practical, or permit the excavator to do necessary repairs or relocation at a mutually acceptable price.
14 ESSB 5627 (2) A facility operator notified in accordance with subsection (1) of this section shall arrange for repairs or relocation as soon as is practical, or permit the excavator to do necessary repairs or relocation at a mutually acceptable price.
8.
9.
(2) Any hazardous liquid or gas pipeline operator who (a):
(2) Any facility operator who (a):
p.
15 SB 5627 Sec.
10.
RCW 19.122.070 and 2011 c 263 s 11 are each amended to read as follows:
(1) Any person who violates any provision of this chapter not amounting to a violation of RCW 19.122.055 is subject to a civil penalty of ((not more than one thousand dollars for an initial violation, and)) not more than ((five thousand dollars)) $5,000 for each ((subsequent)) violation within a three-year period.
All penalties recovered in such actions must be deposited in the damage prevention account created in RCW 19.122.160.
(2) Any excavator who ((willfully or maliciously damages a marked underground facility is liable for treble the costs incurred in repairing or relocating the facility.
In those cases in which an excavator fails to notify known facility operators or a one-number locator service, any damage to the underground facility is deemed willful and malicious and is subject to treble damages for costs incurred in repairing or relocating the facility)) fails to give notice of planned excavation and damages a marked underground facility is liable for all costs incurred in repairing or relocating the facility and any penalties assessed under this chapter.
(3) This chapter does not affect any civil remedies for personal injury or for property damage, including that to underground facilities, nor does this chapter create any new civil remedies for such damage.
9.
11.
(3) Any excavator who excavates within 35 feet of a transmission pipeline, prior to receiving positive response from the facility p.
(3) Any excavator who excavates within 35 feet of a transmission pipeline, prior to receiving positive response from the facility operator of the transmission pipeline when required under this chapter, is guilty of a misdemeanor.
15 ESSB 5627 operator of the transmission pipeline when required under this chapter, is guilty of a misdemeanor.
10.
12.
If charged with a violation of RCW 19.122.090, an equipment operator is deemed to have established an affirmative defense to such charges if:
p.
16 SB 5627 If charged with a violation of RCW 19.122.090, an equipment operator is deemed to have established an affirmative defense to such charges if:
11.
13.
p.
(vi) A consumer-owned utility, as defined in RCW 19.27A.140;
16 ESSB 5627 (vi) A consumer-owned utility, as defined in RCW 19.27A.140;
((and)) (x) A telecommunications company;
and p.
and (xi) A labor organization.
17 SB 5627 (x) A telecommunications company.
(5) The safety committee may review complaints of alleged violations of this chapter involving practices related to underground facilities, except for those complaints relating to damage to pipeline facilities or which involve violations of RCW 19.122.075 or 19.122.090.
(5) The safety committee may review complaints of alleged violations of this chapter involving practices related to underground facilities, except for those complaints relating to damage to pipeline facilities or which involve violations of RCW 19.122.075 and 19.122.090.
(6) To review complaints of alleged violations, the safety committee must first receive sufficient evidence that a probable violation occurred.
(6) To review complaints of alleged violations, the safety committee must appoint at least three and not more than five members as a review committee.
Once sufficient evidence has been received, the safety committee must appoint at least three and not more than five members as a review committee.
(7) Before reviewing a complaint alleging a violation of this chapter, the review committee must ((notify the person making the complaint and the alleged violator of its review and of)) provide all complaint forms, materials, and supporting evidence that will be presented or used by the person or company making the complaint, to the alleged violator no less than 30 days prior to the scheduled date of review.
(7) Before reviewing a complaint alleging a violation of this chapter, the review committee must notify the person making the complaint and the alleged violator of its review and of the opportunity to participate.
Both parties must be notified of the review and be provided the opportunity to participate.
p.
Sec.
17 ESSB 5627 Sec.
14.
12.
(3) With respect to referrals from the safety committee, the commission must consider any recommendation by the committee regarding enforcement and remedial actions involving an alleged violator.
(3) With respect to referrals from the safety committee, the commission must consider any recommendation by the committee p.
18 SB 5627 regarding enforcement and remedial actions involving an alleged violator.
18 ESSB 5627
19 SB 5627
View plain text versions (4)

Action History

  1. Effective date 7/27/2025.

  2. Chapter 292, 2025 Laws.

  3. Governor signed.

  4. Delivered to Governor.

  5. Speaker signed.

  6. President signed.

  7. Passed final passage; yeas, 48; nays, 0; absent, 0; excused, 0.

  8. Senate concurred in House amendments.

  9. Third reading, passed; yeas, 95; nays, 0; absent, 0; excused, 3.

  10. Rules suspended. Placed on Third Reading.

  11. Committee amendment(s) adopted with no other amendments.

  12. Rules Committee relieved of further consideration. Placed on second reading.

  13. Referred to Rules 2 Review.

  14. APP - Majority; do pass with amendment(s) but without amendment(s) by Environment & Energy.

  15. Executive action taken in the House Committee on Appropriations at 1:30 PM.

  16. Public hearing in the House Committee on Appropriations at 9:00 AM.

  17. Referred to Appropriations.

  18. ENVI - Majority; do pass with amendment(s).

  19. Executive action taken in the House Committee on Environment & Energy at 8:00 AM.

  20. Executive session scheduled, but no action was taken in the House Committee on Environment & Energy at 4:00 PM.

  21. Public hearing in the House Committee on Environment & Energy at 4:00 PM.

  22. First reading, referred to Environment & Energy.

  23. Third reading, passed; yeas, 48; nays, 1; absent, 0; excused, 0.

  24. Rules suspended. Placed on Third Reading.

  25. Floor amendment(s) adopted.

  26. 1st substitute bill substituted (ENET 25).

  27. Placed on second reading by Rules Committee.

  28. On motion, referred to Rules Committee for second reading.

  29. And refer to Ways & Means.

  30. Minority; without recommendation.

  31. ENET - Majority; 1st substitute bill be substituted, do pass.

  32. Executive action taken in the Senate Committee on Environment, Energy & Technology at 10:30 AM.

  33. Public hearing in the Senate Committee on Environment, Energy & Technology at 10:30 AM.

  34. First reading, referred to Environment, Energy & Technology.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 6 co-sponsors · 144 not signed on · 1 voted No

Sponsors (1)

Co-sponsors (6)

Not signed on (144)

144 members have not signed on to this bill.

Show all 144 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 48 Yea · 0 Nay
Party YeaNayPresentNot Voting
Democrat 29000
Republican 19000
Total 48000
% of votes cast 100%0%0%0%
How each member voted (48)
Member Party Vote
Adrian Cortes Democrat Yea
Annette Cleveland Democrat Yea
Bob Hasegawa Democrat Yea
Claire Wilson Democrat Yea
Claudia Kauffman Democrat Yea
Deborah Krishnadasan Democrat Yea
Derek Stanford Democrat Yea
Drew Hansen Democrat Yea
Emily Alvarado Democrat Yea
Jamie Pedersen Democrat Yea
Javier Valdez Democrat Yea
Jesse Salomon Democrat Yea
Jessica Bateman Democrat Yea
John Lovick Democrat Yea
June Robinson Democrat Yea
Lisa Wellman Democrat Yea
Liz Lovelett Democrat Yea
Manka Dhingra Democrat Yea
Marcus Riccelli Democrat Yea
Marko Liias Democrat Yea
Mike Chapman Democrat Yea
Noel Frame Democrat Yea
Rebecca Saldaña Democrat Yea
Sharon Shewmake Democrat Yea
Steve Conway Democrat Yea
T'wina Nobles Democrat Yea
Tina Orwall Democrat Yea
Vandana Slatter Democrat Yea
Yasmin Trudeau Democrat Yea
Chris Gildon Republican Yea
Curtis King Republican Yea
Drew MacEwen Republican Yea
Jeff Holy Republican Yea
Jeff Wilson Republican Yea
Jim McCune Republican Yea
John Braun Republican Yea
Judy Warnick Republican Yea
Keith Goehner Republican Yea
Keith Wagoner Republican Yea
Leonard Christian Republican Yea
Mark Schoesler Republican Yea
Matt Boehnke Republican Yea
Nikki Torres Republican Yea
Paul Harris Republican Yea
Perry Dozier Republican Yea
Phil Fortunato Republican Yea
Ron Muzzall Republican Yea
Shelly Short Republican Yea

Official roll call →

Passed 95 Yea · 0 Nay · 3 Other
Party YeaNayPresentNot Voting
Republican 36002
Democrat 59001
Total 95003
% of votes cast 97%0%0%3%
How each member voted (98)
Member Party Vote
Adam Bernbaum Democrat Yea
Adison Richards Democrat Yea
Adrian Cortes Democrat Yea
Alex Ramel Democrat Yea
Alicia Rule Democrat Yea
Amy Walen Democrat Yea
April Berg Democrat Yea
Beth Doglio Democrat Yea
Brandy Donaghy Democrat Yea
Brianna Thomas Democrat Yea
Chipalo Street Democrat Yea
Chris Stearns Democrat Yea
Cindy Ryu Democrat Yea
Clyde Shavers Democrat Yea
Dan Bronoske Democrat Yea
Darya Farivar Democrat Yea
Dave Paul Democrat Yea
David Hackney Democrat Yea
Davina Duerr Democrat Yea
Debra Entenman Democrat Yea
Debra Lekanoff Democrat Yea
Edwin Obras Democrat Yea
Gerry Pollet Democrat Yea
Greg Nance Democrat Yea
Jake Fey Democrat Yea
Jamila Taylor Democrat Yea
Janice Zahn Democrat Yea
Javier Valdez Democrat Yea
Joe Fitzgibbon Democrat Yea
Joe Timmons Democrat Yea
Julia Reed Democrat Yea
Kristine Reeves Democrat Yea
Larry Springer Democrat Yea
Lauren Davis Democrat Yea
Laurie Jinkins Democrat Yea
Lillian Ortiz-Self Democrat Yea
Lisa Callan Democrat Yea
Lisa Parshley Democrat Yea
Liz Berry Democrat Yea
Mari Leavitt Democrat Yea
Mary Fosse Democrat Yea
Melanie Morgan Democrat Yea
Mia Gregerson Democrat Yea
Monica Jurado Stonier Democrat Yea
My-Linh Thai Democrat Yea
Natasha Hill Democrat Yea
Nicole Macri Democrat Yea
Osman Salahuddin Democrat Yea
Roger Goodman Democrat Yea
Sharlett Mena Democrat Yea
Sharon Tomiko Santos Democrat Yea
Sharon Wylie Democrat Yea
Shaun Scott Democrat Yea
Shelley Kloba Democrat Yea
Steve Bergquist Democrat Yea
Steve Tharinger Democrat Yea
Strom Peterson Democrat Yea
Tarra Simmons Democrat Not Voting
Timm Ormsby Democrat Yea
Victoria Hunt Democrat Yea
Alex Ybarra Republican Yea
Andrew Barkis Republican Yea
Andrew Engell Republican Yea
April Connors Republican Yea
Brian Burnett Republican Yea
Carolyn Eslick Republican Yea
Chris Corry Republican Yea
Cyndy Jacobsen Republican Yea
Dan Griffey Republican Yea
David Stuebe Republican Yea
Deb Manjarrez Republican Yea
Drew Stokesbary Republican Yea
Ed Orcutt Republican Yea
Gloria Mendoza Republican Not Voting
Hunter Abell Republican Yea
Jenny Graham Republican Yea
Jeremie Dufault Republican Yea
Jim Walsh Republican Yea
Joe Schmick Republican Yea
Joel McEntire Republican Not Voting
John Ley Republican Yea
Joshua Penner Republican Yea
Kevin Waters Republican Yea
Mark Klicker Republican Yea
Mary Dye Republican Yea
Matt Marshall Republican Yea
Michael Keaton Republican Yea
Mike Steele Republican Yea
Mike Volz Republican Yea
Peter Abbarno Republican Yea
Rob Chase Republican Yea
Sam Low Republican Yea
Skyler Rude Republican Yea
Stephanie Barnard Republican Yea
Stephanie McClintock Republican Yea
Suzanne Schmidt Republican Yea
Tom Dent Republican Yea
Travis Couture Republican Yea

Official roll call →

Passed 48 Yea · 1 Nay
Party YeaNayPresentNot Voting
Democrat 30000
Republican 18100
Total 48100
% of votes cast 98%2%0%0%
How each member voted (49)
Member Party Vote
Adrian Cortes Democrat Yea
Annette Cleveland Democrat Yea
Bill Ramos Democrat Yea
Bob Hasegawa Democrat Yea
Claire Wilson Democrat Yea
Claudia Kauffman Democrat Yea
Deborah Krishnadasan Democrat Yea
Derek Stanford Democrat Yea
Drew Hansen Democrat Yea
Emily Alvarado Democrat Yea
Jamie Pedersen Democrat Yea
Javier Valdez Democrat Yea
Jesse Salomon Democrat Yea
Jessica Bateman Democrat Yea
John Lovick Democrat Yea
June Robinson Democrat Yea
Lisa Wellman Democrat Yea
Liz Lovelett Democrat Yea
Manka Dhingra Democrat Yea
Marcus Riccelli Democrat Yea
Marko Liias Democrat Yea
Mike Chapman Democrat Yea
Noel Frame Democrat Yea
Rebecca Saldaña Democrat Yea
Sharon Shewmake Democrat Yea
Steve Conway Democrat Yea
T'wina Nobles Democrat Yea
Tina Orwall Democrat Yea
Vandana Slatter Democrat Yea
Yasmin Trudeau Democrat Yea
Chris Gildon Republican Yea
Curtis King Republican Yea
Drew MacEwen Republican Yea
Jeff Holy Republican Yea
Jeff Wilson Republican Yea
Jim McCune Republican Yea
John Braun Republican Yea
Judy Warnick Republican Yea
Keith Goehner Republican Yea
Keith Wagoner Republican Yea
Leonard Christian Republican Nay
Mark Schoesler Republican Yea
Matt Boehnke Republican Yea
Nikki Torres Republican Yea
Paul Harris Republican Yea
Perry Dozier Republican Yea
Phil Fortunato Republican Yea
Ron Muzzall Republican Yea
Shelly Short Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 5627?
SB 5627 is sponsored by T'wina Nobles (Democrat), Bob Hasegawa (Democrat), Jeff Wilson (Republican), Sharon Shewmake (Democrat), Lisa Wellman (Democrat), Paul Harris (Republican), and Bill Ramos (Democrat).
What is the current status of SB 5627?
This bill has been enacted into law. Introduced January 31, 2025. Enacted.
Where can I track SB 5627?
Track SB 5627 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 5627

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 5627

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →