AB 2541 — Public utilities.
Last action — Read first time.
-
1Introduced
-
2In Committee
-
3Passed Assembly
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill died with 2015-2016 Regular Session. It reached “Introduced” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Under existing law, the Public Utilities Commission has regulatory authority over public utilities. The Public Utilities Act authorizes the commission to ascertain and fix just and reasonable standards, classifications, regulations, practices, measurements, or service to be furnished, imposed, observed, and followed by specified public utilities, including all electrical, gas, and water corporations. Existing law authorizes the commission to establish reasonable rules, specifications, and standards to secure the accuracy of all meters and appliances for measurements and requires a public utility that estimates meter readings to so indicate on its billings and to correct any incorrect estimate by the next billing period, except as specified. This bill would make nonsubstantive changes to the above-described provisions.
Bill Text
What changed in the latest version
1 added · 1 removed1 line(s) added, 1 removed.
Bill Number Bill Keyword Home Bill Information California Law Publications Other Resources My Subscriptions My Favorites Bill Information >> Bill Search >> Text Bill TextBillText Information PDF2 Bill PDF |Add To My Favorites | Version:
View plain text versions (2)
- Introduced 02/19/16 - Introduced Current pdf February 19, 2016
- AB2541 View text html
Action History
-
Read first time.
-
From printer. May be heard in committee March 22.
-
Introduced. To print.
Sponsors
- Dahle · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 121 not signed on
Sponsors (1)
- Dahle
Co-sponsors (0)
None.
Not signed on (121)
121 members have not signed on to this bill.
Show all 121 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does AB 2541 do?
- Under existing law, the Public Utilities Commission has regulatory authority over public utilities. The Public Utilities Act authorizes the commission to ascertain and fix just and reasonable standards, classifications, regulations, practices, measurements, or service to be furnished, imposed, observed, and followed by specified public utilities, including all electrical, gas, and water corporations. Existing law authorizes the commission to establish reasonable rules, specifications, and standards to secure the accuracy of all meters and appliances for measurements and requires a public utility that estimates meter readings to so indicate on its billings and to correct any incorrect estimate by the next billing period, except as specified. This bill would make nonsubstantive changes to the above-described provisions.
- Who sponsors AB 2541?
- AB 2541 is sponsored by Dahle.
- What is the current status of AB 2541?
- This bill died with 2015-2016 Regular Session. It reached “Introduced” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track AB 2541?
- Track AB 2541 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on AB 2541
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of AB 2541
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →