HB4995 — ELECTRIC TRANSMISSION SITING
Last action — Rule 19(a) / Re-referred to Rules Committee
-
1Introduced
-
2In Committee
-
3Passed House
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill has been introduced in the House. Introduced February 04, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Odds of enactment
Low chanceBased on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
-
Introduced
Current position in the legislative process.
-
1 sponsor
1 primary, 0 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (1 D).
-
Cleared a recorded vote
Passed 1 recorded vote so far.
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
Summary
Creates the Electric Transmission Facilities Siting Act. Defines terms. Requires that, in the siting of new electric transmission facilities, available corridors be used in the following order of priority: (1) existing public utility corridors; (2) highway corridors; and (3) new corridors. Provides that a public utility or developer may construct, place, or maintain a high-voltage electric service line on a public right-of-way or along a highway if (i) the public utility or developer submits a colocation request for the high-voltage electric service line to the Secretary of Transportation and (ii) the Secretary reviews and approves the colocation request. Requires a public utility or developer to develop a constructability report in consultation with the Department of Transportation and requires the public utility or developer and the Department to follow the terms and conditions of the constructability report during the planning and approval process for the siting of a high-voltage electric service line. Sets forth requirements for the content of the constructability report. Amends the Public Utilities Act. In provisions concerning distributed generation rebates, provides that the owner or operator of distributed generation that, before January 1, 2025 (rather than before the threshold date), is eligible for net metering under the Act may apply for a base rebate for an associated energy storage device behind the same retail customer meter as the distributed generation, regardless of whether the distributed generation applies for a rebate for the distributed generation device. Provides that, after the threshold date, a stand-alone energy storage system that is neither paired with distributed generation nor with any electric load beyond the electric load that is used by the energy storage system itself (rather than a stand-alone energy storage system) shall be compensated with a rebate of $250 per kilowatt-hour of nameplate capacity. Amends the Environmental Protection Act. In provisions concerning greenhouse gases, provides that the Environmental Protection Agency and the Illinois Power Agency shall file a plan to reduce or delay certain emissions reductions requirements with the Illinois Commerce Commission for review in conjunction with the integrated resource plan under certain provisions of the Public Utilities Act. Makes other changes. Effective immediately.
Bill Text
We don't have the full text on file for this bill yet.
Read HB4995 on the official Illinois source →Action History
-
Rule 19(a) / Re-referred to Rules Committee
-
Held on Calendar Order of Second Reading - Short Debate
-
Second Reading - Short Debate
-
Placed on Calendar 2nd Reading - Short Debate
-
Do Pass / Short Debate Energy & Environment Committee; 017-009-000
-
Assigned to Energy & Environment Committee
-
Referred to Rules Committee
-
First Reading
-
Filed with the Clerk by Rep. Robyn Gabel
Sponsors
- Robyn Gabel · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 182 not signed on · 9 voted No
Sponsors (1)
- Robyn Gabel Democrat
Co-sponsors (0)
None.
Not signed on (182)
182 members have not signed on to this bill.
Show all 182 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 17 | 0 | 0 | 2 |
| Republican | 0 | 9 | 0 | 1 |
| Total | 17 | 9 | 0 | 3 |
| % of votes cast | 59% | 31% | 0% | 10% |
How each member voted (29)
| Member | Party | Vote |
|---|---|---|
| Aarón M. Ortíz | Democrat | Yea |
| Abdelnasser Rashid | Democrat | Yea |
| Amy Briel | Democrat | Yea |
| Anna Moeller | Democrat | Yea |
| Carol Ammons | Democrat | Yea |
| Curtis J. Tarver, II | Democrat | Yea |
| Diane Blair-Sherlock | Democrat | Yea |
| Jawaharial Williams | Democrat | Not Voting |
| Joyce Mason | Democrat | Yea |
| Kimberly Du Buclet | Democrat | Yea |
| Laura Faver Dias | Democrat | Yea |
| Lawrence "Larry" Walsh, Jr. | Democrat | Yea |
| Lilian Jiménez | Democrat | Yea |
| Margaret A. DeLaRosa | Democrat | Yea |
| Norma Hernandez | Democrat | Yea |
| Robyn Gabel | Democrat | Yea |
| Sonya M. Harper | Democrat | Not Voting |
| Suzanne M. Ness | Democrat | Yea |
| William "Will" Davis | Democrat | Yea |
| Adam M. Niemerg | Republican | Nay |
| Blaine Wilhour | Republican | Nay |
| Brad Halbrook | Republican | Nay |
| Bradley Fritts | Republican | Nay |
| Charles Meier | Republican | Nay |
| Chris Miller | Republican | Nay |
| Dave Severin | Republican | Nay |
| Jason R. Bunting | Republican | Nay |
| Jed Davis | Republican | Not Voting |
| Regan Deering | Republican | Nay |
Subjects
Frequently asked questions
- What does HB4995 do?
- Creates the Electric Transmission Facilities Siting Act. Defines terms. Requires that, in the siting of new electric transmission facilities, available corridors be used in the following order of priority: (1) existing public utility corridors; (2) highway corridors; and (3) new corridors. Provides that a public utility or developer may construct, place, or maintain a high-voltage electric service line on a public right-of-way or along a highway if (i) the public utility or developer submits a colocation request for the high-voltage electric service line to the Secretary of Transportation and (ii) the Secretary reviews and approves the colocation request. Requires a public utility or developer to develop a constructability report in consultation with the Department of Transportation and requires the public utility or developer and the Department to follow the terms and conditions of the constructability report during the planning and approval process for the siting of a high-voltage electric service line. Sets forth requirements for the content of the constructability report. Amends the Public Utilities Act. In provisions concerning distributed generation rebates, provides that the owner or operator of distributed generation that, before January 1, 2025 (rather than before the threshold date), is eligible for net metering under the Act may apply for a base rebate for an associated energy storage device behind the same retail customer meter as the distributed generation, regardless of whether the distributed generation applies for a rebate for the distributed generation device. Provides that, after the threshold date, a stand-alone energy storage system that is neither paired with distributed generation nor with any electric load beyond the electric load that is used by the energy storage system itself (rather than a stand-alone energy storage system) shall be compensated with a rebate of $250 per kilowatt-hour of nameplate capacity. Amends the Environmental Protection Act. In provisions concerning greenhouse gases, provides that the Environmental Protection Agency and the Illinois Power Agency shall file a plan to reduce or delay certain emissions reductions requirements with the Illinois Commerce Commission for review in conjunction with the integrated resource plan under certain provisions of the Public Utilities Act. Makes other changes. Effective immediately.
- Who sponsors HB4995 ?
- HB4995 is sponsored by Robyn Gabel (Democrat).
- What is the current status of HB4995 ?
- This bill has been introduced in the House. Introduced February 04, 2026. It must pass committee before a floor vote.
- Where can I track HB4995 ?
- Track HB4995 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HB4995
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HB4995
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →