Illinois 104th General Assembly Status: Introduced 1 D cosponsors

HB4995      — ELECTRIC TRANSMISSION SITING

Last action — Rule 19(a) / Re-referred to Rules Committee

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the House. Introduced February 04, 2026. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Odds of enactment

Low chance

Based on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Stalled 28% · moderate confidence
  • Introduced

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (1 D).

  • Cleared a recorded vote

    Passed 1 recorded vote so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Summary

Creates the Electric Transmission Facilities Siting Act. Defines terms. Requires that, in the siting of new electric transmission facilities, available corridors be used in the following order of priority: (1) existing public utility corridors; (2) highway corridors; and (3) new corridors. Provides that a public utility or developer may construct, place, or maintain a high-voltage electric service line on a public right-of-way or along a highway if (i) the public utility or developer submits a colocation request for the high-voltage electric service line to the Secretary of Transportation and (ii) the Secretary reviews and approves the colocation request. Requires a public utility or developer to develop a constructability report in consultation with the Department of Transportation and requires the public utility or developer and the Department to follow the terms and conditions of the constructability report during the planning and approval process for the siting of a high-voltage electric service line. Sets forth requirements for the content of the constructability report. Amends the Public Utilities Act. In provisions concerning distributed generation rebates, provides that the owner or operator of distributed generation that, before January 1, 2025 (rather than before the threshold date), is eligible for net metering under the Act may apply for a base rebate for an associated energy storage device behind the same retail customer meter as the distributed generation, regardless of whether the distributed generation applies for a rebate for the distributed generation device. Provides that, after the threshold date, a stand-alone energy storage system that is neither paired with distributed generation nor with any electric load beyond the electric load that is used by the energy storage system itself (rather than a stand-alone energy storage system) shall be compensated with a rebate of $250 per kilowatt-hour of nameplate capacity. Amends the Environmental Protection Act. In provisions concerning greenhouse gases, provides that the Environmental Protection Agency and the Illinois Power Agency shall file a plan to reduce or delay certain emissions reductions requirements with the Illinois Commerce Commission for review in conjunction with the integrated resource plan under certain provisions of the Public Utilities Act. Makes other changes. Effective immediately.

Bill Text

We don't have the full text on file for this bill yet.

Read HB4995 on the official Illinois source →

Action History

  1. Rule 19(a) / Re-referred to Rules Committee

  2. Held on Calendar Order of Second Reading - Short Debate

  3. Second Reading - Short Debate

  4. Placed on Calendar 2nd Reading - Short Debate

  5. Do Pass / Short Debate Energy & Environment Committee; 017-009-000

  6. Assigned to Energy & Environment Committee

  7. Referred to Rules Committee

  8. First Reading

  9. Filed with the Clerk by Rep. Robyn Gabel

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 182 not signed on · 9 voted No

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (182)

182 members have not signed on to this bill.

Show all 182 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Energy & Environment

Passed 17 Yea · 9 Nay · 3 Other
Party YeaNayPresentNot Voting
Democrat 17002
Republican 0901
Total 17903
% of votes cast 59%31%0%10%
How each member voted (29)
Member Party Vote
Aarón M. Ortíz Democrat Yea
Abdelnasser Rashid Democrat Yea
Amy Briel Democrat Yea
Anna Moeller Democrat Yea
Carol Ammons Democrat Yea
Curtis J. Tarver, II Democrat Yea
Diane Blair-Sherlock Democrat Yea
Jawaharial Williams Democrat Not Voting
Joyce Mason Democrat Yea
Kimberly Du Buclet Democrat Yea
Laura Faver Dias Democrat Yea
Lawrence "Larry" Walsh, Jr. Democrat Yea
Lilian Jiménez Democrat Yea
Margaret A. DeLaRosa Democrat Yea
Norma Hernandez Democrat Yea
Robyn Gabel Democrat Yea
Sonya M. Harper Democrat Not Voting
Suzanne M. Ness Democrat Yea
William "Will" Davis Democrat Yea
Adam M. Niemerg Republican Nay
Blaine Wilhour Republican Nay
Brad Halbrook Republican Nay
Bradley Fritts Republican Nay
Charles Meier Republican Nay
Chris Miller Republican Nay
Dave Severin Republican Nay
Jason R. Bunting Republican Nay
Jed Davis Republican Not Voting
Regan Deering Republican Nay

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB4995      do?
Creates the Electric Transmission Facilities Siting Act. Defines terms. Requires that, in the siting of new electric transmission facilities, available corridors be used in the following order of priority: (1) existing public utility corridors; (2) highway corridors; and (3) new corridors. Provides that a public utility or developer may construct, place, or maintain a high-voltage electric service line on a public right-of-way or along a highway if (i) the public utility or developer submits a colocation request for the high-voltage electric service line to the Secretary of Transportation and (ii) the Secretary reviews and approves the colocation request. Requires a public utility or developer to develop a constructability report in consultation with the Department of Transportation and requires the public utility or developer and the Department to follow the terms and conditions of the constructability report during the planning and approval process for the siting of a high-voltage electric service line. Sets forth requirements for the content of the constructability report. Amends the Public Utilities Act. In provisions concerning distributed generation rebates, provides that the owner or operator of distributed generation that, before January 1, 2025 (rather than before the threshold date), is eligible for net metering under the Act may apply for a base rebate for an associated energy storage device behind the same retail customer meter as the distributed generation, regardless of whether the distributed generation applies for a rebate for the distributed generation device. Provides that, after the threshold date, a stand-alone energy storage system that is neither paired with distributed generation nor with any electric load beyond the electric load that is used by the energy storage system itself (rather than a stand-alone energy storage system) shall be compensated with a rebate of $250 per kilowatt-hour of nameplate capacity. Amends the Environmental Protection Act. In provisions concerning greenhouse gases, provides that the Environmental Protection Agency and the Illinois Power Agency shall file a plan to reduce or delay certain emissions reductions requirements with the Illinois Commerce Commission for review in conjunction with the integrated resource plan under certain provisions of the Public Utilities Act. Makes other changes. Effective immediately.
Who sponsors HB4995     ?
HB4995      is sponsored by Robyn Gabel (Democrat).
What is the current status of HB4995     ?
This bill has been introduced in the House. Introduced February 04, 2026. It must pass committee before a floor vote.
Where can I track HB4995     ?
Track HB4995      free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB4995     

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB4995     

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →