Illinois 104th General Assembly Status: Introduced 2 D cosponsors

HB3758      — ENERGY-VARIOUS

Last action — Added Co-Sponsor Rep. Kelly M. Cassidy

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the House. Introduced February 07, 2025. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Odds of enactment

Low chance

Based on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Not enough signal yet

Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Summary

Amends the Illinois Power Agency Act. Adds and modifies definitions of terms. Authorizes the Illinois Power Agency to conduct competitive solicitations to procure contracted energy storage credits sufficient to achieve certain energy storage standards; to request, review, and accept proposals; to execute contracts; and to procure energy storage credits. Requires the Agency to develop a storage procurement plan. Authorizes the Agency to develop and implement a firm energy resource procurement plan. Makes other changes. Amends the Public Utilities Act. Requires each electric utility to demonstrate sufficient resources devoted to interconnection. Requires the Illinois Commerce Commission to perform specified actions regarding interconnection within 90 days after the effective date of the amendatory Act. In a provision regarding virtual power plant programs, requires each electric utility serving more than 300,000 customers as of January 1, 2023 to propose an initial tariff within 60 days after the effective date of the amendatory Act. In a provision regarding peak remediation programs, requires each electric utility serving more than 300,000 retail customers as of January 1, 2023 to propose an initial tariff within 90 days after the effective date of the amendatory Act. Requires the Commission to establish a working group with relevant stakeholders to develop a stand-alone energy storage distribution deployment program. Provides that, beginning on June 1, 2024, the electric utility shall be entitled to recover through tariffed charges all of the costs associated with the purchase of energy storage credits to meet specified energy storage standards. Requires the Agency to prepare an energy storage resources procurement plan for the procurement of energy storage credits. Requires the Commission to establish an Office of Interconnection and Renewable Development, which shall (i) actively seek input from all interested parties and shall develop a thorough understanding and critical analyses of the tools and techniques used to promote development and remove barriers to development of the projects and devices, and (ii) monitor interconnection between electric utilities and applicants for interconnection and interconnection customers. Sets forth reporting requirements for the Office. Makes other changes. Effective immediately.

Bill Text

We don't have the full text on file for this bill yet.

Read HB3758 on the official Illinois source →

Action History

  1. Added Co-Sponsor Rep. Kelly M. Cassidy

  2. Rule 19(a) / Re-referred to Rules Committee

  3. Assigned to Executive Committee

  4. Referred to Rules Committee

  5. First Reading

  6. Filed with the Clerk by Rep. Marcus C. Evans, Jr.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 1 co-sponsors · 181 not signed on

Sponsors (1)

Co-sponsors (1)

Not signed on (181)

181 members have not signed on to this bill.

Show all 181 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB3758      do?
Amends the Illinois Power Agency Act. Adds and modifies definitions of terms. Authorizes the Illinois Power Agency to conduct competitive solicitations to procure contracted energy storage credits sufficient to achieve certain energy storage standards; to request, review, and accept proposals; to execute contracts; and to procure energy storage credits. Requires the Agency to develop a storage procurement plan. Authorizes the Agency to develop and implement a firm energy resource procurement plan. Makes other changes. Amends the Public Utilities Act. Requires each electric utility to demonstrate sufficient resources devoted to interconnection. Requires the Illinois Commerce Commission to perform specified actions regarding interconnection within 90 days after the effective date of the amendatory Act. In a provision regarding virtual power plant programs, requires each electric utility serving more than 300,000 customers as of January 1, 2023 to propose an initial tariff within 60 days after the effective date of the amendatory Act. In a provision regarding peak remediation programs, requires each electric utility serving more than 300,000 retail customers as of January 1, 2023 to propose an initial tariff within 90 days after the effective date of the amendatory Act. Requires the Commission to establish a working group with relevant stakeholders to develop a stand-alone energy storage distribution deployment program. Provides that, beginning on June 1, 2024, the electric utility shall be entitled to recover through tariffed charges all of the costs associated with the purchase of energy storage credits to meet specified energy storage standards. Requires the Agency to prepare an energy storage resources procurement plan for the procurement of energy storage credits. Requires the Commission to establish an Office of Interconnection and Renewable Development, which shall (i) actively seek input from all interested parties and shall develop a thorough understanding and critical analyses of the tools and techniques used to promote development and remove barriers to development of the projects and devices, and (ii) monitor interconnection between electric utilities and applicants for interconnection and interconnection customers. Sets forth reporting requirements for the Office. Makes other changes. Effective immediately.
Who sponsors HB3758     ?
HB3758      is sponsored by Marcus C. Evans, Jr. (Democrat) and Kelly M. Cassidy (Democrat).
What is the current status of HB3758     ?
This bill has been introduced in the House. Introduced February 07, 2025. It must pass committee before a floor vote.
Where can I track HB3758     ?
Track HB3758      free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB3758     

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB3758     

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →