Illinois 104th General Assembly Status: Introduced 2 D cosponsors

HB3349      — POWERING UP ILLINOIS ACT

Last action — House Floor Amendment No. 1 Rule 19(c) / Re-referred to Rules Committee

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the House. Introduced February 07, 2025. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Prognosis

Stalled 30% · moderate confidence

Where this bill stands today.

Odds of enactment

Low

How often bills like it became law.

  • Introduced

    Current position in the legislative process.

  • 2 sponsors

    1 primary, 1 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (2 D).

  • Cleared a recorded vote

    Passed 2 recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Creates the Powering Up Illinois Act. Defines terms. Sets forth findings. Requires an electric utility that operates within the State to (i) upgrade the State's electrical distribution systems as needed and in time to achieve the State's decarbonization goals, and implement federal, State, regional, and local air quality and decarbonization standards, plans, and regulations, (ii) conduct sufficient advance planning, engineering, and construction of increased distribution of system capacity by advance ordering transformers and other needed equipment so that customers can be energized without substantial delay, (iii) promptly energize new customers, including by ensuring that new housing, new businesses, and new charging for light-duty, medium-duty, and heavy-duty vehicles and off-road vehicles, vessels, trains, and equipment can be used without delay caused by a failure of the utility to implement energization projects, (iv) promptly upgrade service when needed by customers, (v) allow customers seeking energization to choose an optional flexible connection agreement, which shall provide a tariffed, voluntary utility offering that requires customers to agree to specified service levels as a requirement of energization or interconnection through the use of demand response technology that limits the net import and export of electricity at the point of common coupling to remain within the rated capacity limits of a customer's existing service connection or distribution circuit, either on a permanent basis or to allow for immediate project operations before service or distribution system upgrades are completed, and (vi) recruit, train, and retain an adequately sized and qualified workforce to carry out the planning, engineering, and construction of electrical distribution systems needed to promptly serve customers seeking energization and service upgrades without sacrificing other necessary activities of the workforce. Sets forth provisions concerning: the staffing of an electrification team; electric utility requirements; recovery of costs; and safety standards. Effective immediately.

Bill Text

We don't have the full text on file for this bill yet.

Read HB3349 on the official Illinois source →

Action History

  1. House Floor Amendment No. 1 Rule 19(c) / Re-referred to Rules Committee

  2. Rule 19(a) / Re-referred to Rules Committee

  3. House Floor Amendment No. 1 Recommends Be Adopted Public Utilities Committee; 013-007-000

  4. Added Chief Co-Sponsor Rep. Mary Beth Canty

  5. House Floor Amendment No. 1 Rules Refers to Public Utilities Committee

  6. House Floor Amendment No. 1 Referred to Rules Committee

  7. House Floor Amendment No. 1 Filed with Clerk by Rep. Curtis J. Tarver, II

  8. Held on Calendar Order of Second Reading - Short Debate

  9. Second Reading - Short Debate

  10. Placed on Calendar 2nd Reading - Short Debate

  11. Do Pass / Short Debate Public Utilities Committee; 014-007-000

  12. Assigned to Public Utilities Committee

  13. Referred to Rules Committee

  14. First Reading

  15. Filed with the Clerk by Rep. Curtis J. Tarver, II

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 1 co-sponsors · 181 not signed on · 7 voted No

Sponsors (1)

Co-sponsors (1)

Not signed on (181)

181 members have not signed on to this bill.

Show all 181 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Public Utilities

Passed 13 Yea · 7 Nay · 1 Other
Party YeaNayPresentNot Voting
Republican 0700
Democrat 13001
Total 13701
% of votes cast 62%33%0%5%
How each member voted (21)
Member Party Vote
Angelica Guerrero-Cuellar Democrat Yea
Dave Vella Democrat Yea
Eva-Dina Delgado Democrat Yea
Fred Crespo Democrat Yea
Jaime M. Andrade, Jr. Democrat Yea
Jawaharial Williams Democrat Not Voting
Jay Hoffman Democrat Yea
Justin Slaughter Democrat Yea
Kimberly Du Buclet Democrat Yea
Lawrence "Larry" Walsh, Jr. Democrat Yea
Maurice A. West, II Democrat Yea
Michael J. Kelly Democrat Yea
Nabeela Syed Democrat Yea
Rita Mayfield Democrat Yea
Brad Halbrook Republican Nay
Christopher "C.D." Davidsmeyer Republican Nay
Daniel J. Ugaste Republican Nay
Jason R. Bunting Republican Nay
Kyle Moore Republican Nay
Michael J. Coffey, Jr. Republican Nay
Norine K. Hammond Republican Nay

Official roll call →

Public Utilities

Passed 14 Yea · 7 Nay
Party YeaNayPresentNot Voting
Democrat 14000
Republican 0700
Total 14700
% of votes cast 67%33%0%0%
How each member voted (21)
Member Party Vote
Angelica Guerrero-Cuellar Democrat Yea
Dave Vella Democrat Yea
Eva-Dina Delgado Democrat Yea
Fred Crespo Democrat Yea
Harry Benton Democrat Yea
Jaime M. Andrade, Jr. Democrat Yea
Jawaharial Williams Democrat Yea
Jay Hoffman Democrat Yea
Justin Slaughter Democrat Yea
Kimberly Du Buclet Democrat Yea
Lawrence "Larry" Walsh, Jr. Democrat Yea
Michael J. Kelly Democrat Yea
Nabeela Syed Democrat Yea
Rita Mayfield Democrat Yea
Brad Halbrook Republican Nay
Christopher "C.D." Davidsmeyer Republican Nay
Daniel J. Ugaste Republican Nay
Jason R. Bunting Republican Nay
Kyle Moore Republican Nay
Michael J. Coffey, Jr. Republican Nay
Norine K. Hammond Republican Nay

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB3349      do?
Creates the Powering Up Illinois Act. Defines terms. Sets forth findings. Requires an electric utility that operates within the State to (i) upgrade the State's electrical distribution systems as needed and in time to achieve the State's decarbonization goals, and implement federal, State, regional, and local air quality and decarbonization standards, plans, and regulations, (ii) conduct sufficient advance planning, engineering, and construction of increased distribution of system capacity by advance ordering transformers and other needed equipment so that customers can be energized without substantial delay, (iii) promptly energize new customers, including by ensuring that new housing, new businesses, and new charging for light-duty, medium-duty, and heavy-duty vehicles and off-road vehicles, vessels, trains, and equipment can be used without delay caused by a failure of the utility to implement energization projects, (iv) promptly upgrade service when needed by customers, (v) allow customers seeking energization to choose an optional flexible connection agreement, which shall provide a tariffed, voluntary utility offering that requires customers to agree to specified service levels as a requirement of energization or interconnection through the use of demand response technology that limits the net import and export of electricity at the point of common coupling to remain within the rated capacity limits of a customer's existing service connection or distribution circuit, either on a permanent basis or to allow for immediate project operations before service or distribution system upgrades are completed, and (vi) recruit, train, and retain an adequately sized and qualified workforce to carry out the planning, engineering, and construction of electrical distribution systems needed to promptly serve customers seeking energization and service upgrades without sacrificing other necessary activities of the workforce. Sets forth provisions concerning: the staffing of an electrification team; electric utility requirements; recovery of costs; and safety standards. Effective immediately.
Who sponsors HB3349     ?
HB3349      is sponsored by Curtis J. Tarver, II (Democrat) and Mary Beth Canty (Democrat).
What is the current status of HB3349     ?
This bill has been introduced in the House. Introduced February 07, 2025. It must pass committee before a floor vote.
Where can I track HB3349     ?
Track HB3349      free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB3349     

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB3349     

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →